Request for Additional Information Relief Request No. ISPT-09 for the First 10 Year Inservice Inspection Interval
ML060270303
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/03/2006
From: Pickett D
NRC/NRR/ADRO/DORL/LPLII-2
To: Singer K
Tennessee Valley Authority
DOUGLAS PICKET, NRR/DORL, 41501364
References
TAC MC8305
Download: ML060270303 (6)


Text

February 3, 2006

Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

SUBJECT:

WATTS BAR NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONALINFORMATION REGARDING RELIEF REQUEST NO. ISPT-09 FOR THE FIRST TEN-YEAR INSERVICE INSPECTION INTERVAL (TAC NO. MC8305)

Dear Mr. Singer:

By letter dated September 8, 2005 (ADAMS Accession Number: ML052560093), TennesseeValley Authority (TVA), the licensee for the Watts Bar Nuclear Plant, Unit 1 (WBNP-1),

submitted Relief Request (RR) No. ISPT-09. In this request, TVA requested relief from the requirements of Paragraph (g)(4) to Section 50.55a of Title 10 of the Code of FederalRegulations and the system leak test requirements that are specified in Table IWB-2500-1,Examination Category B-P and Paragraph IWA-5222(a) of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Division 1. RR No. ISPT-09 is applicable to the First Ten-Year Inservice Inspection Interval for WBNP-1 and pertains to the system leak test requirements for ASME Code Class 1 portions of the safety injection and residual heat removal systems. In order for the staff of the Nuclear Regulatory Commission to complete its review of the subjectrelief request, we request that the licensee respond to the enclosed request for additional information (RAI). Based on discussions with your staff, we understand that you plan to respond to the enclosed RAI within 60 days of receipt of this letter.Sincerely,

/RA/ Douglas V. Pickett, Senior Project ManagerPlant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-390

Enclosure:

Request for Additional Information cc w/enclosure: See next page

ML060270303 NRR-088OFFICELPL2-2/LALPL2-2/PMDCI/CFEBLPL2-2/BCNAMERSolaDPickettJTsao (A)MMarshallDATE02/03/ 0602/03/ 06by memo dated12 / 12 / 05 2 / 03 / 06 Mr. Karl W. Singer Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:Mr. Ashok S. Bhatnagar, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, Vice PresidentNuclear Engineering & Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801Mr. Robert J. Beecken, Vice PresidentNuclear Support Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael D. SkaggsSite Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381General CounselTennessee Valley Authority ET 11A 400 West Summit Hill Drive Knoxville, TN 37902Mr. John C. Fornicola, ManagerNuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801Mr. Glenn W. Morris, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801Mr. Paul L. Pace, ManagerLicensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381Mr. Jay Laughlin, Plant ManagerWatts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381Senior Resident InspectorWatts Bar Nuclear Plant U.S. Nuclear Regulatory Commission 1260 Nuclear Plant Road Spring City, TN 37381County Executive 375 Church Street Suite 215 Dayton, TN 37321County Mayor P. O. Box 156 Decatur, TN 37322Mr. Lawrence E. Nanney, DirectorDivision of Radiological Health Dept. of Environment & Conservation Third Floor, L and C Annex 401 Church Street Nashville, TN 37243-1532Ms. Ann P. Harris341 Swing Loop Road Rockwood, Tennessee 37854 ENCLOSUREREQUEST FOR ADDITIONAL INFORAMTION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONFIRST 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAMTENNESSEE VALLEY AUTHORITYREQUEST FOR RELIEF NO. ISPT-09WATTS BAR NUCLEAR PLANT, UNIT 1FACILITY OPERATING LICENSE NO. NPF-90DOCKET NO: 50-3901.Relief Request (RR) No. ISPT-09 requests relief from the requirements of the AmericanSociety of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Division 1 (henceforth Section XI), Table IWB-2500-1, Examination Category B-P, based on the hardship provisions that are specified in Paragraph (a)(3)(ii) of Title 10 of the Code ofFederal Regulations. Specify which Edition of Section XI is the Code of record forWatts Bar Nuclear Plant, Unit 1 (WBN-1). In addition, specify which Inspection Items in Section XI Table IWB-2500-1, Examination Category B-P are applicable to the piping segments that are within the scope of the relief request, as identified in Table 1, "Piping Segment Descriptions," of the Enclosure to the relief request.2.Reference the basis (e.g., Academic Textbook, ASME Section XI paragraph, NUREGReport, etc.) for the following equation that is specified on Page E-4 of the RR No.

ISPT-09 submittal:

L p = L XI x ( P p / P XI )1/23.The relief request proposes to perform the required hydrostatic pressure tests of theASME Code Class 1 piping segments at test pressures lower than those that are required in Section XI Table IWB-5220-1, which is called out by reference in Section XI Paragraph IWB-5222(a). Confirm that the alternative pressure tests proposed in RR No. ISPT-09 will be subject to the minimum hold times that are required by Section XI Paragraph IWA-5213 for hydrostatic pressure tests and the minimum test temperatures that are required by Section XI Article 5000 (e.g., the minimum temperature requirements in Paragraph IWB-5230 in Editions through the 1992 Edition or in Paragraph IWB-5240 in the 1995 Edition and more recent Editions). 4.Table 1, "Piping Segment Descriptions," of the Enclosure to RR No. ISPT-09 (i.e., theenclosure to the Tennessee Valley Authority letter of September 8, 2005) provides the descriptions of the piping segments that are within the scope of the relief request. The staff seeks the following clarifications for the piping segments descriptions that are provided in Table 1:a.Reactor Coolant Loop 1 on Page E-7: "Low pressure safety injection from RHRsystem CKV-63-633 to the 10-inch Loop 1 cold leg injection line." Clarify which component in the 10-inch Loop 1 cold leg injection line bounds the end of the piping segment that requires pressure testing.b.Reactor Coolant Loop 1 on Page E-7: "High pressure safety injection pipingfrom the 3-inch common header from CKV-63-581 to Loop 1 cold leg piping to CKV-63-586." Confirm that the component description should be "High pressure safety injection piping from CKV-63-581 in the 3-inch common header to CKV-63-586 in the Loop 1 cold leg piping."c.Reactor Coolant Loop 1 on Page E-7: "Safety injection pump piping from CKV-63-543 to the 8-inch Loop 1 hot leg injection line." Clarify which component in the 8-inch Loop 1 hot leg injection line bounds the end of the piping segment.d.Reactor Coolant Loop 1 on Page E-7: "Safety injection pump piping from CKV-63-551 to the 6-inch Loop 1 cold leg injection line." Clarify which component in the 6-inch Loop 1 cold leg injection line bounds the end of the piping segment.e.Reactor Coolant Loop 2 on Page E-8: "Low pressure safety injection from RHRsystem CKV-63-632 to the 10-inch Loop 2 cold leg injection line." Clarify which component in the 10-inch Loop 2 cold leg injection line bounds the end of the piping segment.f.Reactor Coolant Loop 2 on Page E-8: "High pressure safety injection pipingfrom the 3-inch common header from CKV-63-581 to Loop 2 cold leg piping to CKV-63-587." Confirm that the component description should be "High pressure safety injection piping from CKV-63-581 in the 3-inch common header to CKV-63-587 in the Loop 2 cold leg piping."g.Confirm that the Loop 2 piping segment descriptions on page E-8 should notinclude an entry from a check valve in the Safety Injection pump piping to a valve in an 8-inch or 6-inch Loop 2 hot leg injection line in the manner they have been included for Reactor Coolant System Loops 1, 3, and 4. If the Loop 2 entries should include such a piping segment description and the entry has not been included in Table 1, please amend Table 1 to add it. If the Loop 2 entries in Table 1 do include such a piping segment entry, please identify which entry contains the applicable component description.h.Reactor Coolant Loop 2 on Page E-8: "Safety Injection pump piping from CKV-63-553 to the 6-inch Loop 2 cold leg injection line." Clarify whichcomponent in the 6-inch Loop 2 cold leg injection line bounds the end of the piping segment.I.Reactor Coolant Loop 3 on Page E-9: "Low pressure safety injection from RHRsystem CKV-63-634 to the 10-inch Loop 3 cold leg injection line." Clarify which component in the 10-inch Loop 3 cold leg injection line bounds the end of the piping segment.j.Reactor Coolant Loop 3 on Page E-9: "High pressure safety injection pipingfrom CKV-63-581 to Loop 3 cold leg piping to CKV-63-588." Confirm that the component description should be "High pressure safety injection piping from CKV-63-581 in the 3-inch common header to CKV-63-588 in the Loop 3 cold leg piping."k.Reactor Coolant Loop 3 on Page E-9: "Safety injection pump piping from CKV-63-545 to the 8-inch Loop 3 hot leg injection line." Clarify which component in the 8-inch Loop 3 hot leg injection line bounds the end of the piping segment.l. Reactor Coolant Loop 3 on Page E-9: "Safety injection pump piping from CKV-63-555 to the 6-inch Loop 3 cold leg injection line." Clarify which component in the 6-inch Loop 3 cold leg injection line bounds the end of the piping segment.m.Reactor Coolant Loop 4 on Page E-10: "Low pressure safety injection from RHRsystem CKV-63-635 to the 10-inch Loop 4 cold leg injection line." Clarify which component in the 10-inch Loop 4 cold leg injection line bounds the end of the piping segment.n.Reactor Coolant Loop 4 on Page E-10: "High pressure safety injection pipingfrom the 3-inch common header from CKV-63-581 to Loop 4 cold leg piping to CKV-63-589." Confirm that the component description should be "High pressure safety injection piping from CKV-63-581 in the 3-inch common header to CKV-63-589 in the Loop 4 cold leg piping."o.Reactor Coolant Loop 4 on Page E-10: "Safety injection pump piping from CKV-63-557 to the 6-inch Loop 4 cold leg injection line." Clarify which component in the 6-inch Loop 4 cold leg injection line bounds the end of the piping segment.p.Reactor Coolant Loop 4 on Page E-10: "RHR piping between FCVs-74-1 and 8and FCVs-74-2 and 9." The staff recommends that the pipe segment description be broken into two separate entries because it is confusing exactly which flow control valves are the valves that bound the length of the piping segments.