Cy 2018 Baseline Inspection Complete
ML19046A075
Person / Time
Issue date: 02/15/2019
From: Dan Collins
Division Reactor Projects I
To: Chris Miller
Division of Inspection and Regional Support
References
Download: ML19046A075 (32)


Text

C. Miller UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406

-2713 February 15, 2019 MEMORANDUM TO:

Christopher G. Miller, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FRO M: Daniel S. Collins , Director /RA/ Division of Reactor Projects Region I

SUBJECT:

CY 201 8 BASELINE INSPECTION COMPLETION This memorandum documents the results of Region I's implementation of the Reactor Oversight Process (ROP) Baseline Inspection Program. Region I has completed a review and audit, per Region I DRP/DRS Joint Policy 28/0550, and determined that the ROP Baseline Inspection Program was successfully completed for CY 201 8. Reactor Program System Report 8a is enclosed and provides the completion status of baseline inspection procedures for all Region I sites.

Note that along with the status, some procedures have attached notes as described in IMC 0306.

In some cases, procedures are performed on a biennial or triennial frequency and were not required to be performed in CY201 8. Also, in some cases, procedures were considered complete with less than the minimum samples because sufficient samples were not available. In other cases, all requirements of the procedure were met by work done in another procedure.

Lastly, in some cases , procedures are marked as not applicable if they were not required to be performed this inspection cycle.

RPS/IR Report 8a does not include security and safeguards inspection program status. However, the baseline program for security and safeguards for all Region I sites was also verified complete for CY201

8.

Enclosure:

As stated Contact: Marc S. Ferdas, Team Leader , Division of Reactor Projects Technical Support and Assessment Team (610) 337-5022

ML19046A075 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DNMS RI/DRS DI/DRP NAME CLally MFerdas/CL JTrapp/per email JYerokun/per email DCollins DATE 2/11/18 2/13/1 8 2/12/18 2/12/18 2/15/18 Region No: 1

Beaver Valley (BV)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 5

3 Complete Complete 71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08P Inservice Inspection Activities (PWR)

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 2

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 22 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 5

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

2 1

Complete Complete 71111.21M DBA (Teams)

Triennial 15 9

Complete Complete - in previous year(s)

71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete Page 1 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.05 Maintenance of EP

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 2

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.03 Airbore Radioactivity

Biennial 4

3 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 1

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.05 Radiation Monitoring Instrumentation

Biennial 2

2 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 5

5 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 5

5 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 Problem Identification and Resolution

Annually 8

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71153 Followup of Events and NOED

Annually 6

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 1

1 Complete Complete Page 2 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Calvert Cliffs (CALV)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 7

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 15 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 21 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 2

2 Complete Complete - in previous year(s)

71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 9

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 21 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 23 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 29 18 Complete Complete - in previous year(s)

71111.18 Plant Modifications

Annually 5

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

1 1

Complete Complete 71111.21M DBA (Teams)

Triennial 13 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Complete Complete - by reference iaw IMC 0306

71111.22 Surveillance Testing

Annually 21 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Maintenance of EP

Biennial 1

1 Complete Complete Page 3 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 5

4 Complete Complete 71124.03 Airbore Radioactivity

Biennial 3

3 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 4

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation

Biennial 2

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.06 Rad Gas & Liquid Treatment

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 Problem Identification and Resolution

Annually 8

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71153 Followup of Events and NOED

Annually 4

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 1

1 Complete Complete Page 4 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

FitzPatrick (FITZ)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 8

4 Complete Complete - in previous year(s)

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 2

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 3

2 Complete Complete 71111.08G Inservice Inspection Activities (BWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 20 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 19 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 29 18 Complete Complete 71111.18 Plant Modifications

Annually 5

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

1 1

Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 0

6 Complete Complete - by reference iaw IMC 0306

71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Maintenance of EP

Biennial 1

1 Complete Complete 71114.06 Drill Evaluation

Annually 3

3 Complete Complete Page 5 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.01 Rad Haz Assess Exposure Controls

Annually 12 6

Complete Complete 71124.02 Occupational ALARA

Biennial 4

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.03 Airbore Radioactivity

Biennial 1

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.04 Occupational Dose Assessment

Biennial 4

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.05 Radiation Monitoring Instrumentation

Biennial 2

2 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 5

5 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 5

5 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 Problem Identification and Resolution

Annually 7

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71153 Followup of Events and NOED

Annually 2

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 1

1 Complete Complete Page 6 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Ginna (GINN)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 6

3 Complete Complete 71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 3

2 Complete Complete - in previous year(s)

71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 19 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 27 18 Complete Complete - in previous year(s)

71111.18 Plant Modifications

Annually 5

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

2 1

Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 10 6

Complete Complete - in previous year(s)

71111.22 Surveillance Testing

Annually 20 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Maintenance of EP

Biennial 1

1 Complete Complete 71114.06 Drill Evaluation

Annually 3

3 Complete Complete Page 7 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 4

4 Complete Complete 71124.03 Airbore Radioactivity

Biennial 3

3 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 4

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.06 Rad Gas & Liquid Treatment

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 5

5 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 Problem Identification and Resolution

Annually 8

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 6

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - minimum sample not available iaw IMC 0306 994OA7 LINCVs Annually 0

1 Complete Complete - minimum sample not available iaw IMC 0306 Page 8 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Hope Creek (HOPE)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 3

2 Complete Complete - in previous year(s)

71111.08G Inservice Inspection Activities (BWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 10 8

Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 20 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 18 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 29 18 Complete Complete - in previous year(s)

71111.18 Plant Modifications

Annually 5

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

1 1

Complete Complete 71111.21M DBA (Teams)

Triennial 13 9

Complete Complete 71111.21N DBA (Programs)

Triennial 9

6 Complete Complete - in previous year(s)

71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 0

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Maintenance of EP

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

Page 9 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 3

3 Complete Complete - minimum sample not available iaw IMC 0306 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 0

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 3

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.03 Airbore Radioactivity

Biennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.04 Occupational Dose Assessment

Biennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.05 Radiation Monitoring Instrumentation

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.06 Rad Gas & Liquid Treatment

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.07 Radiological Environmental Monitoring Program

Biennial 2

2 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71151 Performance Indicator Verification

Annually 0

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 Problem Identification and Resolution

Annually 9

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71153 Followup of Events and NOED

Annually 12 1

Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 1

1 Complete Complete Page 10 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Indian Point (INPT)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 6

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 16 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 3

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 24 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 12 4

Complete Complete - in previous year(s)

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 4

2 Complete Complete 71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 2

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 16 8

Complete Complete 71111.12 Maintenance Effectiveness

Annually 10 8

Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 24 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 25 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 18 18 Complete Complete - in previous year(s)

71111.18 Plant Modifications

Annually 8

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 28 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

5 1

Complete Complete 71111.21M DBA (Teams)

Triennial 18 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 22 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Maintenance of EP

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

Page 11 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 4

3 Complete Complete - by reference iaw IMC 0306

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 4

4 Complete Complete 71124.03 Airbore Radioactivity

Biennial 3

3 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.05 Radiation Monitoring Instrumentation

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.06 Rad Gas & Liquid Treatment

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.07 Radiological Environmental Monitoring Program

Biennial 2

2 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 Problem Identification and Resolution

Annually 11 6

Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71153 Followup of Events and NOED

Annually 21 1

Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

Page 12 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Limerick (LIM)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 5

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 3

2 Complete Complete - in previous year(s)

71111.08G Inservice Inspection Activities (BWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 22 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 29 18 Complete Complete - in previous year(s)

71111.18 Plant Modifications

Annually 5

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

1 1

Complete Complete 71111.21M DBA (Teams)

Triennial 12 9

Complete Complete 71111.21N DBA (Programs)

Triennial 8

6 Complete Complete - in previous year(s)

71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Maintenance of EP

Biennial 1

1 Complete Complete Page 13 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 4

4 Complete Complete 71124.03 Airbore Radioactivity

Biennial 3

3 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 4

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.06 Rad Gas & Liquid Treatment

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 5

5 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 Problem Identification and Resolution

Annually 8

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 9

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - minimum sample not available iaw IMC 0306 994OA7 LINCVs Annually 0

1 Complete Complete - minimum sample not available iaw IMC 0306 Page 14 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Millstone (MILL)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 6

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 16 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 3

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 24 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 3

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 2

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 16 8

Complete Complete 71111.12 Maintenance Effectiveness

Annually 10 8

Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 25 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 25 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 9

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 28 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

2 1

Complete Complete 71111.21M DBA (Teams)

Triennial 19 9

Complete Complete 71111.21N DBA (Programs)

Triennial 9

6 Complete Complete - in previous year(s)

71111.22 Surveillance Testing

Annually 25 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete Page 15 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.05 Maintenance of EP

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.06 Drill Evaluation

Annually 4

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 4

4 Complete Complete 71124.03 Airbore Radioactivity

Biennial 3

3 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 4

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.06 Rad Gas & Liquid Treatment

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 Problem Identification and Resolution

Annually 11 6

Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 4

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 1

1 Complete Complete Page 16 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Nine Mile Point (NMP)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 5

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 17 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 3

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 24 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 5

4 Complete Complete 71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 4

3 Complete Complete 71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08G Inservice Inspection Activities (BWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 2

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 16 8

Complete Complete 71111.12 Maintenance Effectiveness

Annually 10 8

Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 26 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 23 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 8

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 28 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

3 1

Complete Complete 71111.21M DBA (Teams)

Triennial 15 9

Complete Complete - in previous year(s)

71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 29 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Maintenance of EP

Biennial 1

1 Complete Complete Page 17 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.01 Rad Haz Assess Exposure Controls

Annually 8

6 Complete Complete 71124.02 Occupational ALARA

Biennial 2

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.03 Airbore Radioactivity

Biennial 1

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.04 Occupational Dose Assessment

Biennial 2

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.05 Radiation Monitoring Instrumentation

Biennial 2

2 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 5

5 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 5

5 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 Problem Identification and Resolution

Annually 11 6

Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71153 Followup of Events and NOED

Annually 14 1

Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - minimum sample not available iaw IMC 0306 994OA7 LINCVs Annually 0

1 Complete Complete - minimum sample not available iaw IMC 0306 Page 18 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Peach Bottom (PB)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 5

4 Complete Complete 71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 2

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08G Inservice Inspection Activities (BWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Complete Complete - in previous year(s)

71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 20 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 5

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

3 1

Complete Complete 71111.21M DBA (Teams)

Triennial 12 9

Complete Complete - in previous year(s)

71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete Page 19 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.05 Maintenance of EP

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 12 6

Complete Complete 71124.02 Occupational ALARA

Biennial 4

4 Complete Complete 71124.03 Airbore Radioactivity

Biennial 6

3 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 4

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation

Biennial 2

2 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.07 Radiological Environmental Monitoring Program

Biennial 2

2 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 Problem Identification and Resolution

Annually 9

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71153 Followup of Events and NOED

Annually 7

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 2

1 Complete Complete Page 20 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Pilgrim (PILG)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 7

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 7

4 Complete Complete 71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 2

2 Complete Complete 71111.07A Heat Sink Performance

Annually 1

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08G Inservice Inspection Activities (BWR)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Complete Complete - in previous year(s)

71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 20 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 6

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

4 1

Complete Complete 71111.21M DBA (Teams)

Triennial 16 9

Complete Complete - in previous year(s)

71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 17 14 Complete Complete - minimum sample not available iaw IMC 0306 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete Page 21 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.05 Maintenance of EP

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 4

4 Complete Complete 71124.03 Airbore Radioactivity

Biennial 3

3 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.05 Radiation Monitoring Instrumentation

Biennial 2

2 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 Problem Identification and Resolution

Annually 8

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71153 Followup of Events and NOED

Annually 20 1

Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 3

1 Complete Complete Page 22 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Salem (SALM)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 7

4 Complete Complete 71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 22 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 25 18 Complete Complete 71111.18 Plant Modifications

Annually 5

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

2 1

Complete Complete 71111.21M DBA (Teams)

Triennial 13 9

Complete Complete - in previous year(s)

71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 19 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete Page 23 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.05 Maintenance of EP

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 4

4 Complete Complete 71124.03 Airbore Radioactivity

Biennial 1

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.04 Occupational Dose Assessment

Biennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.05 Radiation Monitoring Instrumentation

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.06 Rad Gas & Liquid Treatment

Biennial 5

5 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 2

2 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 Problem Identification and Resolution

Annually 8

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71153 Followup of Events and NOED

Annually 7

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 2

1 Complete Complete Page 24 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Seabrook (SEAB)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 7

4 Complete Complete - in previous year(s)

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 2

2 Complete Complete 71111.07A Heat Sink Performance

Annually 1

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 4

2 Complete Complete 71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Complete Complete - in previous year(s)

71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 18 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 25 18 Complete Complete 71111.18 Plant Modifications

Annually 5

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

1 1

Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 9

6 Complete Complete 71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Maintenance of EP

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

Page 25 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 3

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.03 Airbore Radioactivity

Biennial 3

3 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.05 Radiation Monitoring Instrumentation

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.06 Rad Gas & Liquid Treatment

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 5

5 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 Problem Identification and Resolution

Annually 8

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 3

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 1

1 Complete Complete Page 26 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Susquehanna (SUSQ)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 7

4 Complete Complete - in previous year(s)

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 2

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 3

2 Complete Complete 71111.08G Inservice Inspection Activities (BWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Complete Complete - in previous year(s)

71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 22 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 25 18 Complete Complete 71111.18 Plant Modifications

Annually 5

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

2 1

Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 9

6 Complete Complete 71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Maintenance of EP

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

Page 27 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 2

3 Complete Complete - opportunity to apply full procedure not

available iaw IMC 0306

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 2

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.03 Airbore Radioactivity

Biennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.04 Occupational Dose Assessment

Biennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.05 Radiation Monitoring Instrumentation

Biennial 2

2 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 5

5 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 5

5 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 Problem Identification and Resolution

Annually 8

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 26 1

Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete 994OA7 LINCVs Annually 2

1 Complete Complete Page 28 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 1

Three Mile Island (TMI)

Inspection Cycle: 2018

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 6

3 Complete Complete 71111.04 Equipment Alignment (Partial)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment (Complete)

Annually 2

2 Complete Complete 71111.05A Fire Protection (Annual)

Annually 1

1 Complete Complete 71111.05Q Fire Protection (Quarterly)

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 9

4 Complete Complete - in previous year(s)

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 1

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08P Inservice Inspection Activities (PWR)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Complete Complete - in previous year(s)

71111.11Q Licensed Op Requal & Perform (Quarterly)

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 18 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 7

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

0 1

Complete Complete - opportunity to apply full procedure not

available iaw IMC 0306

71111.21M DBA (Teams)

Triennial 15 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete Page 29 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.05 Maintenance of EP

Biennial 1

1 Complete Complete 71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.01 Rad Haz Assess Exposure Controls

Annually 6

6 Complete Complete 71124.02 Occupational ALARA

Biennial 2

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.03 Airbore Radioactivity

Biennial 2

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.04 Occupational Dose Assessment

Biennial 3

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.05 Radiation Monitoring Instrumentation

Biennial 2

2 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 5

5 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 0

5 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 Problem Identification and Resolution

Annually 7

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 2

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

994OA7 LINCVs Annually 1

1 Complete Complete Page 30 of 30

2/13/2019 1:30:43 PM

Note: Biennial samples completed are the total of

2018 and 2019

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a