MONTHYEARML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C7742019-07-30030 July 2019 Requalification Program Inspection ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19044A6012019-02-0404 February 2019 Operator Licensing Written Exam Approval ML19029B3192019-01-28028 January 2019 Operator Licensing Operating Test Approval ML18159A3512018-06-0505 June 2018 Final Operating Test (Sections a, B, and C) - JPM C, D, K Corrected (Folder 3) ML18047A1692018-01-0303 January 2018 Final Qa/Related Forms (Folder 1) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18047A1702017-11-0707 November 2017 Handouts to Applicants (Folder 3) ML17297A6432017-10-24024 October 2017 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 3 ML17297A0132017-10-23023 October 2017 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 3 ML17234A5902017-08-22022 August 2017 Requalification Program Inspection - Indian Point Nuclear Generating, Unit 3 NL-17-080, Operator Licensing Examination Data2017-06-28028 June 2017 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17206A4422016-10-31031 October 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML16365A0432016-10-31031 October 2016 Handouts to Applicants (Folder 3) ML17069A2842016-10-31031 October 2016 Final Outlines Update ES-401-2, ES-401-3 ML16365A0412016-10-31031 October 2016 Final Outlines (Folder 3) ML17206A4452016-10-31031 October 2016 Final Qa/Related Forms (Folder 1) ML16365A0442016-10-31031 October 2016 Final Operating Test (Sections a, B, and C) (Folder 3) ML16365A0422016-10-31031 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16301A2882016-10-27027 October 2016 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 2 ML16298A0162016-10-20020 October 2016 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 2 ML17047A5982016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Operating Test (Folder 2) ML17047A5972016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Written Exam (Folder 2) ML17047A6012016-09-0101 September 2016 Draft Operating Exam (Section a, B, and C) (Folder 2) ML17047A6002016-09-0101 September 2016 Draft Written Exam (Folder 2) ML17047A5992016-07-18018 July 2016 Draft - Outlines (Folder 2) (Facility Letter Dtd - 07/18/2016) NL-16-073, Operator Licensing Examination Data2016-07-0707 July 2016 Operator Licensing Examination Data ML16189A0832016-07-0606 July 2016 Requalification Program Inspection - Indian Point Energy Center, Unit 2 ML16119A0012016-04-27027 April 2016 Senior Reactor and Reactor Operator Initial License Examinations-Indian Point Energy Center, Unit 2 ML15223A0162015-08-10010 August 2015 Requalification Program Inspection-Indian Point Energy Ctr, Unit 3 IR 05000286/20153012015-06-24024 June 2015 Er 05000286/2015301; 5/11/2015 to 6/18/2015; Indian Point Energy Center, Unit 3: Initial Operator Licensing Examination Report ML15163A2302015-06-0404 June 2015 Draft - Outlines (Folder 2) ML15163A2322015-06-0404 June 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15163A2312015-06-0404 June 2015 Draft Written Exam (Folder 2) ML15163A2292015-06-0404 June 2015 All Comments on Draft NRC-Developed Exam (Operating) (Folder 2) ML15160A4702015-06-0404 June 2015 Final Outlines (Folder 3) ML15160A4642015-06-0404 June 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15160A4562015-06-0404 June 2015 Handouts to Applicants (Folder 3) ML15160A4092015-06-0404 June 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15282A3072015-06-0101 June 2015 Final Qa/Related Forms (Folder 1) ML14308A0522014-10-29029 October 2014 Final Outlines (Folder 3) ML14307B5652014-10-29029 October 2014 Draft Operating Exam (Section a) (Folder 2) ML14307B5212014-10-29029 October 2014 Draft-Outlines (Folder 2) ML14307B3852014-10-29029 October 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14308A2512014-10-29029 October 2014 Final Operating Exam (Section a) (Folder 3) ML14251A2402014-09-0808 September 2014 Operator Licensing Retake Operating Examination Approval-Indian Point Unit 2 2021-01-12
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C7742019-07-30030 July 2019 Requalification Program Inspection ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19029B3192019-01-28028 January 2019 Operator Licensing Operating Test Approval ML18159A3512018-06-0505 June 2018 Final Operating Test (Sections a, B, and C) - JPM C, D, K Corrected (Folder 3) ML18047A1692018-01-0303 January 2018 Final Qa/Related Forms (Folder 1) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18047A1702017-11-0707 November 2017 Handouts to Applicants (Folder 3) ML17297A6432017-10-24024 October 2017 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 3 ML17297A0132017-10-23023 October 2017 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 3 NL-17-080, Operator Licensing Examination Data2017-06-28028 June 2017 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16365A0442016-10-31031 October 2016 Final Operating Test (Sections a, B, and C) (Folder 3) ML17206A4422016-10-31031 October 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17206A4452016-10-31031 October 2016 Final Qa/Related Forms (Folder 1) ML17069A2842016-10-31031 October 2016 Final Outlines Update ES-401-2, ES-401-3 ML16365A0422016-10-31031 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16365A0412016-10-31031 October 2016 Final Outlines (Folder 3) ML16365A0432016-10-31031 October 2016 Handouts to Applicants (Folder 3) ML16301A2882016-10-27027 October 2016 Initial Operator Licensing Written Examination Approval - Indian Point Energy Center, Unit 2 ML16298A0162016-10-20020 October 2016 Initial Operator Licensing Operating Test Approval - Indian Point Energy Center, Unit 2 ML17047A5972016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Written Exam (Folder 2) ML17047A5982016-10-0303 October 2016 NRC Comments on Draft Facility-Developed Operating Test (Folder 2) ML17047A6002016-09-0101 September 2016 Draft Written Exam (Folder 2) ML17047A6012016-09-0101 September 2016 Draft Operating Exam (Section a, B, and C) (Folder 2) ML17047A5992016-07-18018 July 2016 Draft - Outlines (Folder 2) (Facility Letter Dtd - 07/18/2016) NL-16-073, Operator Licensing Examination Data2016-07-0707 July 2016 Operator Licensing Examination Data ML16119A0012016-04-27027 April 2016 Senior Reactor and Reactor Operator Initial License Examinations-Indian Point Energy Center, Unit 2 ML15223A0162015-08-10010 August 2015 Requalification Program Inspection-Indian Point Energy Ctr, Unit 3 IR 05000286/20153012015-06-24024 June 2015 Er 05000286/2015301; 5/11/2015 to 6/18/2015; Indian Point Energy Center, Unit 3: Initial Operator Licensing Examination Report ML15163A2312015-06-0404 June 2015 Draft Written Exam (Folder 2) ML15163A2322015-06-0404 June 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15160A4562015-06-0404 June 2015 Handouts to Applicants (Folder 3) ML15163A2302015-06-0404 June 2015 Draft - Outlines (Folder 2) ML15163A2292015-06-0404 June 2015 All Comments on Draft NRC-Developed Exam (Operating) (Folder 2) ML15160A4092015-06-0404 June 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15160A4702015-06-0404 June 2015 Final Outlines (Folder 3) ML15160A4642015-06-0404 June 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15282A3072015-06-0101 June 2015 Final Qa/Related Forms (Folder 1) ML14308A0522014-10-29029 October 2014 Final Outlines (Folder 3) ML14307B5652014-10-29029 October 2014 Draft Operating Exam (Section a) (Folder 2) ML14307B5212014-10-29029 October 2014 Draft-Outlines (Folder 2) ML14307B3852014-10-29029 October 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14308A2512014-10-29029 October 2014 Final Operating Exam (Section a) (Folder 3) ML14251A2402014-09-0808 September 2014 Operator Licensing Retake Operating Examination Approval-Indian Point Unit 2 ML14195A0902014-07-14014 July 2014 Requalification Program Inspection-Indian Point Station, Unit 2 IR 05000247/20143012014-03-31031 March 2014 Er 05000247-14-301; 2/10/2014 to 2/19/2014; Indian Point, Units 2; Initial Operator Licensing Examination Report ML14091A6922014-03-31031 March 2014 Er 05000247-14-301; 2/10/2014 to 2/19/2014; Indian Point, Units 2; Initial Operator Licensing Examination Report 2021-01-12
[Table view] |
Text
License and NRC comments and the resultant changes to Draft Written Exam RO Exam: #2 -Formatting, added bullets to stem. #4 -Formatting, added bullets to stem. #6 -Simplified stem, changed "in preparation for entering Cold Shutdown" to "Current RCS Temperature is 275°F". Eliminated the human error discussion in stem. #7 -Changed stem wording from "combined" to "cross connected".
- 8 -Formatting, added bullets to stem. Also pulled the words "If valve(s) NOT closed" into the stem. #21 -Changed question to ask for the rod heights respective of the Rod Insertion Limit that both the "ROD INSERTION LOW LIMIT" AND "ROD INSERTION LOW-LOW LIMIT" alarms will actuate instead of just the "ROD INSERTION LOW LIMIT" alarm. #25 -Formatting, added bullets to stem. #26 -Corrected typo in stem, procedure nomenclature should have been ES-0.3. #28 -Changed choice b to "of 255°F for 52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br />" instead of"> 250°F for> 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />" to ensure consistency across all the choices. #32 -Changed 1200 psig to 1100 psig in the question stem. Updated the numbers in explanation section as well. #34 -Simplified the choices to a 212 format eliminating trivial information regarding specific loading sequence times. #39 -Changed RWST Temperature in stem from 95°F to 90°F and changed Containment Temperature in stem from 125°F to 120°F. #42 -Corrected typo in stem. Changed CFU to FCU. #44 -Clarified all choice wording to state: "may" instead of "would". #45 -Formatting, added bullets to stem. #53 -Corrected typo in choice a, changed "rest" to "reset". #54 -Simplified question by changing the plant initial conditions in the stem to MODE 1 instead of MODE 3. Page 1of2 License and NRC comments and the resultant changes to Draft Written Exam SRO Exam: #1 -Simplified question by balding the words "next two actions" in stem and changing turbine trip time from 60 seconds to 90 seconds in choices a & b. Also changed AFW flow to 365 gpm in choice b. #2 -Changed question to ask EOP procedure implementation I strategy differences in a 2/2 format. This corrected a technical error in the original question regarding when a charging pump would be started during EOP implementation.
- 3 -Added to the stem that the STA was monitoring Critical Safety Function Status Trees for 30 minutes after the Reactor Trip. #6 -Reworded the stem to provide better clarification as to the status of the 31 Recirc Pump. Also corrected a typo regarding EOG status, 31 and 33 EOG have started and loaded, 32 EOG has tripped. #8 -Corrected wording in choices b & c to eliminate "and latch" and "inflate the fuel transfer canal gate valve". Changed choices to simply state the words "close the fuel transfer canal gate valve". The change resulted in consistent use of the term in all four choices. #11 -Corrected typo for "flow" in stem. Also clarified valve nomenclature in choices b & c by simply stating; "close the associated spray valve". #14-Deleted original question and rejected the KA based on asking trivial information.
This condition has not been a problem at Indian Point and the instructions to mitigate are in an used attachment of a normal operating instruction.
Replaced with a new question related to the same system and KA category.
- 15 -Changed question to more clearly ask the event classification for a loss of off-site power and what personnel can relieve the CRS/SM as Emergency Director.
Changed question to a 2/2 format. #17 -Deleted unnecessary information in the question stem. #19 -Added an additional condition, "VI; Draining Refueling Cavity Level with fuel in the Reactor Vessel" to stem and reconfigured choices to eliminate any potential for one choice to be a "subset" of another. Also deleted "Upper or" from stem condition Ill. #21 -Corrected typo, all four choices should have stated "32 EOG" instead of "33 EOG". #23 -Changed choice d from "Site Vice President" to "Radiation Protection Manager".
- 24 -Changed wording in stem from "must" to "may". Page 2 of 2 Licensee and NRC comments and resultant changes to the Operating Exam Simulator Scenarios:
- 1. Based on input from examiners, decided tq make Scenarios 2 and 5 the spares. 2. Updated all Scenarios with more specific Technical Specification action requirements.
- 3. Updated Scenario 1 with the following changes: a. Changed event #2 to 31 Steam Generator Pressure (PT-4198)
Channel fails high from 31 Steam Generator Loop 1 B Steam Flow Channel failing high. b. Updated associated bistable trip information for event #2. c. Provided specific required procedural steps to isolate #31 SG in E-2 (event 8). 4. Updated Scenario 4 with the following changes: a. Changed event #1 to 35 SWP trips from 33 SWP trips. b. Swapped the order of events #2 and #3/4. This ensured that the ATC was able to respond to the failure of Nl41 prior to the shutdown initiation and subsequent loss of 5A bus. c. Added "before exiting ECA-0.0" to critical task ECA-0.0 standard (events 7 & 8). Simulator JPMs: 1. Updated all to include validation times. 2. Updated the alternate path JPMs to state "ALTERNATE PATH BEGINS HERE". 3. Deleted Excess Letdown JPM from RO JPMs due to safety system overlap and examiner comments.
Replaced with "Transfer Buses 1-4 to the Station Aux Transformer".
- 4. Deleted Excess Letdown JPM from SRO JPMs due to examiner comments and replaced with "Fill an Accumulator with an SI Pump". 5. Updated initial conditions on Turbine First Stage Pressure Transmitter failure JPM to 50% Reactor Power. 6. Updated initial conditions on the AOP-RHR-1 JPM and stated in cue that an additional operator would handle RCS inventory control. 7. Updated the RCS depressurization JPM with additional termination criteria from step 19 of E-3 and a specific follow-up question if step 19 termination criteria are met. 8. Changed the Swapping Service Water Pump JPM to remove 36 SWP instead of 33 SWP. 9. Added the seven (7) specific Phase B isolation valves that require isolation in the Verify Containment Spray JPM. In-Plant JPMs: 1. Updated In-Plant JPM 3, "Local Charging Pump Operation from RWST with CCW not available" to cue the loss of all CCW instead of providing information upfront in the initial conditions.
Page 1of2 Licensee and NRC comments and resultant changes to the Operating Exam (cont.) RO Admin JPMs: 1. Changed RO Admin #1 to "Electrical Verification
-Offsite Power Sources Surveillance" from "Perform a Shutdown Margin Calculation" based on initial Licensee feedback that the shutdown margin calculation was only performed via computer station in the control room. Changed KA from 2.1.37 to 2.1.18. SRO Admin JPMs: 1. Changed SRO Admin #1 to "Update Electrical Power Availability for Shutdown Safety Assessment" from "Perform a Shutdown Margin Calculation" based on initial Licensee feedback that the shutdown margin calculation was only performed via computer station in the control room. Changed KA from 2.1.37 to 2.1.18. 2. Corrected the SRO Admin #2 listed KA from 2.2.41 to 2.1.25. 3. Corrected SRO Admin #4 answer key and step standard for Permissible Radioactive Discharge Rate (Dr) calculation to 1995 gpm from 1950 gpm. 4. Changed SRO Admin #5 to "Classify Event and Complete Form EP-1, Part 1" from "Determine Protective Action Requirements" based on initial Licensee feedback.
Changed KA from 2.4.44 to 2.4.41. Page 2 of 2