ML18026A569

From kanterella
Revision as of 00:35, 26 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Amendment - Vogtle Electric Generating Plant Unit 4 LAR 17-009
ML18026A569
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/28/2018
From: Patel C P
NRC/NRO/DNRL/LB4
To: Whitley B H
Southern Nuclear Operating Co
patel c/415-3025
Shared Package
ML18026A565 List:
References
EPID L-2017-LLA-0126, LAR 17-009
Download: ML18026A569 (2)


Text

SOUTHERN NUCLEAR OPERATING COMPANY, INC.

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT

, UNIT 4 DOCKET NO. 52-02 6 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No

. 110 License No. NPF

-9 2 1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Southern Nuclear Operating Company , dated March 31, 2017 , complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations

, and all applicable requirements have been satisfied.

2. Accordingly, the license is amended to authorize changes to the Updated Final Safety Analysis Report (UFSAR) as described in the application dated March 31, 201 7. T he license is also amended by changes to Appendix C of the Facility Combined License as indicated in the attachment to this license amendment.

Paragraph 2.D(8) of Facility Combined License No. NPF

-9 2 is hereby amended to read as follows:

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 110 , are hereby incorporated into this license.

3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance. The licensee shall submit the changes authorized by this amendment with the next update of the UFSAR in accordance with 10 CFR 50.71(e).

FOR THE NUCLEAR REGULATORY COMMISSION:

/RA/ Jennifer Dixon

-Herrity , Chief Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Date of Issuance:

February 28, 2018 Attachment s: Page 7 and affected pages of Appendix C to the Facility Combined License