RA-18-0269, Transmittal of Core Operating Limits Report (COLR) for Unit 1 Cycle 25 Reload Core

From kanterella
Revision as of 01:39, 18 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Transmittal of Core Operating Limits Report (COLR) for Unit 1 Cycle 25 Reload Core
ML19009A298
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 12/20/2018
From: Simril T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML19009A293 List:
References
RA-18-0269
Download: ML19009A298 (2)


Text

(_~DUKE ENERG Y" RA-18-0269 December 20, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke Energy) Catawba Nuclear Station, Unit 1 Facility Operating License Number NPF-35 Docket Number 50-413 Tom Sim r i l Vice P resident Catawba Nuc l ear Station Duke Energy CN01VP I 4800 Concord R oad York , S C 29745 o: 803. 701.3340 f: 803.701.3221 t om.sim r i l@d u ke-e n ergy.co m Core Operating Limits Report (COLR) for Unit 1 Cycle 25 Reload Core Pursuant to Catawba Technical Specification 5.6.5.d, please find attached an information copy and an electronic copy of the subject COLR. This COLR revision is being submitted to update the limits of the Unit 1 Cycle 25 reload core. The electronic copy of this COLR is included with this letter in portable document format (PDF) on a digital versatile disc (DVD). The electronic copy includes the power distribution monitoring factors. This letter, the enclosed COLR , and the included DVD COLR with Attachment A, do not contain any regulatory commitments.

Please direct any questions or concerns to Carrie Wilson, Sr. Engineer, at (803) 701-3014. Sincerely , -----r CJ'1V' Tom Simril Vice President, Catawba Nuclear Station Enclosures (paper COLR and DVD COLR with Attachment A) www.duke-energy

.com U.S. Nuclear Regulatory Commission RA-18-0269 December 20, 2018 Page 12 xc (with enclosures):

C. Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, GA 30303-1257 J. D. Austin, Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station M. Mahoney, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mailstop 0-8B1A Rockville, MD 20852