ML12275A284 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 09/18/2012 |
From: | Constellation Energy Nuclear Group, EDF Group, Calvert Cliffs |
To: | Office of Nuclear Material Safety and Safeguards |
References | |
Download: ML12275A284 (1) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML21278A2832021-09-0707 September 2021
[Table view]2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.18, Fuel Handling Incident ML21278A2602021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Post-Refueling Startup Event ML21278A2692021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Loss-of-Coolant Flow Event ML21278A3042021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Table 16.1, Aging Management Programs (Amp), Indexed by LRA Section and System ML22115A0432021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 02, Section 2.2, Population and Land Use_Redacted ML22115A0462021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.1 Through 9.30_Redacted ML21278A3022021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.5, References ML21278A2932021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.22, Waste Gas Incident ML21278A2962021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.4, 10 CFR 54.67(B) Update ML21278A3032021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.3, Evaluation of Time-Limited Aging Analyses ML22115A0472021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted ML21278A2852021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.21, Deleted ML21278A2872021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.15, Steam Generator Tube Rupture Event ML21278A2912021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.26, Feedline Break Event ML21278A2552021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Organization and Methodology ML21278A2762021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations, Table of Contents ML21278A2802021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents ML21278A2842021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.16, Seized Rotor Event ML21278A2922021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.23, Waste Processing System Incident ML21278A2712021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.7, Excess Feedwater Heat Removal Event ML21278A2742021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.12, Asymmetric Steam Generator Event ML21278A2672021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Loss-Of-Non-Emergency AC Power ML21278A2622021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Figures, Deleted ML21278A2642021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Loss of Feedwater Flow Event ML21278A2682021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Reactor Coolant System Depressurization ML21278A2752021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Control Element Assembly Withdrawal Event ML21278A2612021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.14, Steam Line Break Event ML21278A2772021-09-0707 September 2021 2 to Final Safety Analysis Report, Chapter 14, Safety Analysis, Table of Contents ML21278A2532021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Loss of Load Event ML21278A2522021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Section 11.3, Radiation Safety ML22115A0482021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Figures: Redacted ML21278A2892021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.24, Maximum Hypothetical Accident ML21278A2572021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation, Table of Contents ML21278A2662021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.0, Initial Tests and Operation ML21278A2992021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, Introduction ML22115A0422021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 1, Figures: Redacted ML21278A2822021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14 Section 14.25, Excessive Charging Event ML21278A2862021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.2.1 Through 14.26-10 ML21278A2702021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.5, Review and Audit of Operations ML21278A2542021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11, Control Element Assembly Drop Event ML21278A2562021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.6, Emergency Planning ML21278A2722021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Control Element Assembly Ejection ML22115A0442021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 2, Section 2.10, Other Design Considerations: Redacted ML21278A2942021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.19, Turbine-Generator Overspeed Incident ML21278A2982021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Aging Management Programs and Activities ML22115A0452021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 5, Section 5.6, Other Structures - Redacted ML21278A2882021-09-0707 September 2021 2 to Updated Safety Analysis Report, Chapter 14, Section 14.20, Containment Response ML21278A2782021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Excess Load Event ML21278A2812021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 15, Section 15.0, Technical Requirements Manual ML21278A2902021-09-0707 September 2021 2 to Final Safety Analysis Report, Chapter 14 ,Section 14.17, Loss-of-Coolant Accident 2021-09-07 |
Text
Calvert Cliffs Nuclear Power Plant, Independent Spent Fuel Storage Installation NUHOMS TRANSFER CASK (Shown with a NUHOMS-24P DSC)
USAR Figure 4.7-1 Revision 15