BVY 13-080, Updated Final Safety Analysis Report, Revision 26 Update

From kanterella
Revision as of 15:24, 11 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Updated Final Safety Analysis Report, Revision 26 Update
ML13283A050
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 09/19/2013
From: Wamser C J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 13-080
Download: ML13283A050 (3)


Text

Entergy Nuclear Operations, Inc.Vermont Yankee Vernon, VT 05354 Tel 802 257 7711 Christopher J. Wamser Site Vice President BVY 13-080 September 19, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Updated Final Safety Analysis Report, Revision 26 Update Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28

REFERENCES:

1. Letter, VYNPS to USNRC, "Updated Final Safety Analysis Report, Revision 25 Update," BVY 12-026, dated April 24, 2012 2. NEI 98-03, Revision 1 "Guidelines for Updating Final Safety Analysis Reports," June 1999

Dear Sir or Madam:

Pursuant to 10 CFR 50.71(e) and 10 CFR 50.4(b)(6), enclosed is one CD-ROM containing Revision 26 of the Vermont Yankee (VY) Updated Final Safety Analysis Report (UFSAR)and the drawings that are incorporated by reference.

The UFSAR file is divided into four (4)parts named 001 UFSARREV26-Part 1.pdf, 002 UFSARREV26-Part 2.pdf, 003 UFSARREV26-Part 3.pdf and 004 UFSARREV26-Part 4.pdf. Part 1 includes the List of Effective Pages and the UFSAR change matrix that details the specific changes made in Revision 26. The sections containing the changed pages since the previous update (Reference

1) are contained in the folder named Rev 26 Changed Sections.

The drawings referenced in the UFSAR are included as individual files identified by the drawing number in the folder named UFSAR Drawings.

This folder also includes a list of the drawings.Additionally, pursuant to 10 CFR 50.71(e) and the guidance of NEI 98-03, Revision 1, enclosed is one CD-ROM containing the current revisions of the VY Technical Requirements Manual (TRM), the VY Fire Protection Program (FPP), the VY Fire Hazards Analysis (FHA)and the VY Safe Shutdown Capability Analysis (SSCA). The TRM, FPP, FHA and SSCA are incorporated by reference in the UFSAR. The TRM file is named 001 TRM.pdf, the FPP file is named 002 FPP.pdf, the FHA file is named 003 FHA.pdf and the SSCA file is divided into two (2) parts named 004 SSCA -Part 1.pdf and 005 SSCA -Part 2.pdf.NRC holders of controlled-copy editions of the VY UFSAR will receive updates to those volumes with appropriate Change Package Instructions under separate cover.There are no new regulatory commitments being made in this submittal.

Ac?05L BVY 13-080 / Page 2 of 3 Should you have any questions concerning this submittal, please contact Mr. Coley Chappell at (802) 451-3374.I declare under penalty of perjury that the foregoing is true and correct. Executed on September 19, 2013.Sincerely,[CJWpIc]

Enclosures:

1. CD-ROM, Updated Final Safety Analysis Report, Revision 26 and Referenced Plant Drawings List of Files and Folders: 001 UFSARREV26-Part 1.pdf 002 UFSARREV26-Part 2.pdf 003 UFSARREV26-Part 3.pdf 004 UFSARREV26-Part 4.pdf 005 Rev 26 UFSAR Change Matrix.pdf Rev 26 Changed Sections UFSAR Drawings 2. CD-ROM, UFSAR Documents Incorporated by Reference List of Files: 001 TRM.pdf 002 FPP.pdf 003 FHA.pdf 004 SSCA -Part l.pdf 005 SSCA -Part 2.pdf BVY 13-080 / Page 3 of 3 cc: Mr. William M. Dean, Regional Administrator U.S. Nuclear Regulatory Commission, Region 1 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Mr. Douglas V. Pickett, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee 320 Governor Hunt Road Vernon, Vermont 05354 Mr. Christopher Recchia, Commissioner VT Department of Public Service 112 State Street -Drawer 20 Montpelier, Vermont 05620-2601