ML16260A402

From kanterella
Revision as of 22:11, 2 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Response to Request for Additional Information Relating to Beyond Design Based External Event Staffing Study
ML16260A402
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/15/2016
From: Vehec T A
NextEra Energy Duane Arnold
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NG-16-0178
Download: ML16260A402 (4)


Text

September 15, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket No. 50-331 Renewed Op. License No. DPR-49 NEXTeraM ENERGVe NG-16-0178 10 CFR 2.202

Subject:

Response to Request for Additional Information Relating to Beyond Design Bases External Event Staffing Study

References:

1. Order EA-12-049. "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," dated March 12, 2012(ML12056A045)
2. NRG Letter. Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(D Regarding Recommendations 2.1. 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident; dated March 12, 2012. (ML 12073A348)
3. NEI 12-01, Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities (ML 12125A412)
4. Letter. T.A. Vehec (NextEra Energy Duane Arnold. LLC) to U.S. NRG, "FLEX Strategies Phase 2 Staffing Assessment." NG-16-0120.

dated June 3, 2016 (ML 16159A235)

On March 12, 2012, the Nuclear Regulatory Commission (NRG) issued Reference 1, an immediately effective Order to all licensees including NextEra Energy Duane Arnold, LLC (hereafter NextEra Energy Duane Arnold). In Reference 2, the NRG requested information on staffing requirements necessary to mitigate a beyond design bases natural event consistent with Reference

1. In Reference 3, the nuclear industry provided guidelines for how to assess these capabilities.

In Reference 4, NextEra Energy Duane Arnold provided the information requested in Reference 2 developed consistent with Reference

3. In a conference call on August 17, 2016, the NRG staff requested clarification of several items contained in Reference
4. The enclosure to this letter provides the clarifying details requested by the NRG staff. NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324 If you have any questions regarding this matter, please contact Mr. Mike Davis, Licensing Manager at (319) 851-7032. T. A. Vehec Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLG Enclosure cc: Regional Administrator, USNRC, Region Ill Resident Inspector, USN RC, Duane Arnold Energy Center Project Manager, USNRC, Duane Arnold Energy Center Enclosure to NG-16-0178 NextEra Energy Duane Arnold, LLC's Clarifying Information Related to Beyond Design Bases External Event Staffing Study 1 page follows Enclosure to NG-16-0178 Clarification Item 1: What is the normal security role of the "Auxiliary Responder" individuals listed on page 19 of the staffing study? DAEC Response:

The normal security role of the "Auxiliary Responder" is a security Watchperson.

Clarification Item 2: On page 16 of the staffing study, what is being referred to as the "alternative" approach?

DAEC Response:

The "alternative" approach referenced is NextEra fleet procedure SY-AA-102-1038, "Alternative Security Approach For Beyond-Design-Basis External Events". This procedure provides administrative guidance for security personnel under Beyond-Design-Basis events. Clarification Item 3: On page 16 of the staffing study, DAEC made reference to "relaxed" security postures and security functions.

Are actions beyond 10 CFR 73.55(g)(5)(ii) planned as part of the FLEX implementing strategies?

DAEC Response:

No relaxation of security postures and security functions beyond 1 OCFR73.55(g)(5)(ii) is planned as part of the FLEX implementing strategies.

Page 1 of 1