NUREG/IA-0496 - International Agreement Report - the Analysis and Study of ELAP Event and Mitigation Strategies Using Trace Code for Maanshan Pwr.
ML19056A357
Person / Time
Issue date: 02/25/2019
From: Sunny Chen, Chiang Y, Huang C, Shih C, Kirk Tien, Jamie Wang, Wang T, Yang J, Yu T Y
Office of Nuclear Regulatory Research, National Tsing Hua Univ, Institute of Nuclear Science, Taiwan
To:
Meyd, Donald
References
NUREG/IA-0496
Download: ML19056A357 (57)


Text

NUREG/IA-0496 International Agreement Report The Analysis and Study of ELAP Event and Mitigation Strategies sing TRACE Code for Maanshan PWR Prepared by: Jung-Hua Yang, Jong-Rong Wang, Chunkuan Shih, Yu Chiang, Chun-Fu Huang, Shao-Wen Chen, Ting-Y i Wang*, Tzu-Yao Yu*Nuclear and New Energy Education and Research Foundation Institute of Nuclear Engineering and Science, National Tsing Hua University 101 Section 2, Kuang Fu Rd., HsinChu, Taiwan *Department of Nuclear Safety, Taiwan Power Company 242, Section 3, Roosevelt Rd., Zhongzheng District, Taipei, Taiwan K.Tien, NRC Project Manager Division of Systems Analysis Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission

Washington, DC20555-00 01 Manuscript Completed:January 201 8 Date Published:February 2019 Prepared as part of The Agreement on Research Participation and Technical Exchange Under the Thermal-Hydraulic Code Applications and Maintenance Program (CAMP)Published by U.S. Nuclear Regulatory Commission AVAILABILITY OF REFERENCE MATERIALSIN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at

NRC's Library at www.nrc.gov/reading-rm.html. Publicly released records include, to name a few, NUREG-series publications; Federal Register notices; applicant, licensee, and vendor documents and correspondence; NRC correspondence and internal memoranda; bulletins

and information notices; inspection and investigative

reports; licensee event reports; and Commission papers

and their attachments.

NRC publications in the NUREG series, NRC regulations, and Title 10, "Energy," in the Code of Federal Regulations may also be purchased from one of these two sources. The Superintendent of Documents Mail Stop IDCC

Washington, DC 20402-0001

Internet:

bookstore.gpo.gov

T elephone: (202) 512-1800

Fax: (202) 512-2104 The National Technical Information Service 5301 Shawnee R dAlexandria, VA 22312-0002 www.ntis.gov800-553-6847 or, locally, (703) 605-6000A single copy of each NRC draft report for comment isavailable free, to the extent of supply, upon written

request as follows:

Address: U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: distribution.resource@nrc.gov

Facsimile: (301) 415-2289 Some publications in the NUREG series that are posted at NRC's Web site address www.nrc.gov/reading-rm/

doc-collections/nuregs are updated periodically and may differ from the last printed version. Although references to material found on a Web site bear the date the material

was accessed, the material available on the date cited

may subsequently be removed from the site.

Non-NRC Reference Material Documents available from public and special technical libraries include all open literature items, such as books, journal articles, transactions, Federal Register notices, Federal and State legislation, and congressional reports.

Such documents as theses, dissertations, foreign reports

and translations, and non-NRC conference proceedings

may be purchased from their sponsoring organization.

Copies of industry codes and standards used in a substantive manner in the NRC regulatory process are

maintained at-The NRC Technical Library Two White Flint North 11545 Rockville Pike

Rockville, MD 20852-2738 These standards are available in the library for reference

use by the public. Codes and standards are usually

copyrighted and may be purchased from the originating organization or, if they are American National Standards, from-American National Standards Institute 11 West 42nd Street New York, NY 10036-8002 www.ansi.org (212)642-4900 Legally binding regulatory requirements are stated only in laws; NRC regulations; licenses, including technical

speci views expressed in contractor prepared publications in

this series are not necessarily those of the NRC.

The NUREG series comprises (1) technical and adminis-trative reports and books prepared by the staff (NUREG-

XXXX)or agency contractors (NUREG/CR-XXXX), (2) proceedings of conferences (NUREG/CP-XXXX), (3) reports

resulting from international agreements (NUREG/IA-XXXX),

(4)brochures (NUREG/BR-XXXX), and (5) compilations of legal decisions and orders of the Commission and Atomic and Safety Licensing Boards and of Directors' decisions under Section 2.206 of NRC's regulations (NUREG-0750).

DISCLAIMER:

This report was prepared under an international cooperative agreement for the exchange of

technical information. Neither the U.S. Government nor any

agency thereof, nor any employee, makes any warranty, expressed or implied, or assumes any legal liability or

responsibility for any third party's use, or the results of such

use, of any information, apparatus, product or process

disclosed in this publication, or represents that its use by

such third party would not infringe privately owned rights.

NUREG/IA-0496 International Agreement Report The Analysis and Study of ELAP Event and Mitigation Strategies sing TRACE Code for Maanshan PWR Prepared by: Jung-Hua Yang, Jong-Rong Wang, Chunkuan Shih, Yu Chiang, Chun-Fu Huang, Shao-Wen Chen, Ting-Y i Wang*, Tzu-Yao Yu* Nuclear and New Energy Education and Research Foundation Institute of Nuclear Engineering and Science, National Tsing Hua University 101 Section 2, Kuang Fu Rd., HsinChu, Taiwan *Department of Nuclear Safety, Taiwan Power Company 242, Section 3, Roosevelt Rd., Zhongzheng District, Taipei, Taiwan K.Tien, NRC Project Manager Division of Systems Analysis Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC20555-00 01 Manuscript Completed:January 201 8 Date Published:February 2019 Prepared as part of The Agreement on Research Participation and Technical Exchange Under the Thermal-Hydraulic Code Applications and Maintenance Program (CAMP) Published by U.S. Nuclear Regulatory Commission

iii ABSTRACT In this study, TRACE code was used to evaluate the postulated Extended Loss of AC Power (ELAP) accident in Maanshan nuclear power plant (NPP), determining whether RCS water level will drop down below Top of Active Fuel (TAF) while the 5th diesel generator and gas turbines are all disabled when the accident occurred. The scenario and assumptions of postulated ELAP event in this study were referred to the WCAP-17601-P report and NUREG-1953 report. To analyze the effectiveness of URG and FLEX strategies, this research will run a base case without any mitigation strategy and four cases with multiple mitigation strategy under different conditions. According to the results of simulation, it can be found that all four cases in this study can keep RCS water level above TAF, ensuring the safety function of reactor.

iv v FOREWORD The U.S. NRC (United States Nuclear Regulatory Commission) has developed a thermal hydraulic analysis code-RELAP5. RELAP5 has been designed to perform best-estimate analysis of loss-of-coolant accidents (LOCAs), operational transients, and other accident scenarios in reactor systems. Models used include multidimensional two-phase flow, non-equilibrium thermo-dynamics, generalized heat transfer, reflood, level tracking, and reactor kinetics. Traditionally, the RELAP5 code analysis model was developed by ASCII file, which was not intelligible for the beginners of computer analysis. Fortunately, a graphic input interface, SNAP (Symbolic Nuclear Analysis Program) is developed by Applied Technology Incorporation Inc. and the model development process becomes more conveniently. To obtain the authorization of these codes, Taiwan and the United States have signed an agreement on CAMP (Code Applications and Maintenance Program) which includes the development and maintenance of TRACE code. NTHU (National Tsing Hua University) is the organization in Taiwan responsible for the application TRACE and SNAP in thermal hydraulic safety analysis. To meet this responsibility, the TRACE/SNAP model of Maanshan nuclear power plant has been developed. This model was used to perform the URG and FLEX strategies study for ELAP.

vi vii TABLE OF CONTENTSABSTRACT ..........................................................................................................................

iii FOREWORD ........................................................................................................................ v LIST OF FIGURES

............................................................................................................... ix LIST OF TABLES

................................................................................................................. xi EXECUTIVE

SUMMARY

.................................................................................................... xi ii ABBREVIATIONS AND ACRONYMS

................................................................................. xv 1 INTRODUCTION

............................................................................................................. 1 2 VERIFICATION OF MAANSHAN TRACE/SNAP MODEL FOR THE SBO EVENT

........ 3

...

...

3 DESCRIPTION OF MODELING METHOD FOR ELAP EVENT WITH URG AND FLEX .............................................................................................................................

..9 ) )

........9 4 RESULTS .....................................................................................................................

11

..

11 14

..

18

..

..

5 CONCLUSIONS

............................................................................................................

29 6 REFERENCES

..............................................................................................................

31 viii ix FIGURESPage Figure 1 Schematic Diagram of Maanshan TRACE/SNAP M odel ................................. 5 Figure 2 Steam Generator #2 Narrow Range Water Level ............................................ 7 Figure 3 Steam Generator #2 Pressure ......................................................................... 7 Figure 4 Cold Leg #2 Liquid Temperature ..................................................................... 8 Figure 5 Reactor Coolant System Pressure .................................................................. 8 Figure 6 RCS and SG Pressure of Case 0 ..................................................................

11 Figure 7 SG Water Level of Case 0 ............................................................................. 12 Figure 8 RCS Water Level of Case 0 ..........................................................................

12 Figure 9 Seal Leakage Rate of Case 0 ........................................................................

13 Figure 10 ACC Water Level of Case 0 ..........................................................................

13 Figure 11 Peak Cladding Temperature of Case 0 .........................................................

14 Figure 12 RCS and SG Pressure of Case 1 ..................................................................

15 Figure 13 SG Water Level of Case 1.............................................................................

15 Figure 14 RCS Water Level of Case 1 ..........................................................................

16 Figure 15 Seal Leakage Rate of Case 1 .......................................................................

16 Figure 16 ACC Water Level of Case 1 ..........................................................................

17 Figure 17 Peak Cladding Temperature of Case 1 .........................................................

17 Figure 18 RCS and SG Pressure of Case 2 ..................................................................

18 Figure 19 SG Water Level of Case 2.............................................................................

19 Figure 20 RCS Water Level of Case 2 ..........................................................................

19 Figure 21 Seal Leakage Rate of Case 2 .......................................................................

20 Figure 22 ACC Water Level of Case 2 ..........................................................................

20 Figure 23 Peak Cladding Temperature of Case 2 .........................................................

21 Figure 24 RCS and SG Pressure of Case 3 ..................................................................

22 Figure 25 SG Water Level of Case 3.............................................................................

22 Figure 26 RCS Water Level of Case 3 ..........................................................................

23 Figure 27 Seal Leakage Rate of Case 3 .......................................................................

23 Figure 28 ACC Water Level of Case 3 ..........................................................................

24 Figure 29 Peak Cladding Temperature of Case 3 .........................................................

24 Figure 30 RCS and SG Pressure of Case 4 ..................................................................

25 Figure 31 SG Water Level of Case 4.............................................................................

26 Figure 32 RCS Water Level of Case 4 ..........................................................................

26 Figure 33 Seal Leakage Rate of Case 4 .......................................................................

27 Figure 34 ACC Water Level of Case 4 ..........................................................................

27 Figure 35 Peak Cladding Temperature of Case 4 .........................................................

28

xi LIST OF TABLES Page Table 1 Maanshan SBO Accident Scenario .................................................................... 3 Table 2 Maanshan NPP Steady-State Initial Condition

................................................... 4 Table 3 The Sequence of Base Case.............................................................................. 9 Table 4 The Sequences of Case 1~4 ............................................................................

10

xiii EXECUTIVE

SUMMARY

An agreement in 2004 which includes the development and maintenance of TRACE has been signed between Taiwan and USA on CAMP.

NTHU is the organization in Taiwan responsible for applying TRACE to thermal hydraulic safety analysis in order to provide users experiences and development suggestions. To fulfill this responsibility, the TRACE model of Maanshan Nuclear Power Station is developed by NTHU. According to the TRACE users manual, it is the product of a long term effort to combine the capabilities -P, TRAC-B, RELAP5 and RAMONA) into one modernized computational tool. Therefore, in the future, NRC has ensured that TRACE will be the main code used in thermal hydraulic safety analysis, without further development of other thermal hydraulic codes such as RELAP5 and TRAC. Besides, the 3-D geometry model of reactor vessel is one of the features of TRACE. It can support a more accurate and detailed safety analysis of NPPs. SNAP is an interface of NPP analysis codes and developed by U.S. NRC and Applied Programming Technology, Inc. Different from the traditional input deck in ASCII files, the graphical control blocks and thermal hydraulic connections make researches comprehend the whole power plant and control system more easily. Due to these advantages, the RELAP5/MOD3.3 model for Lungmen NPP was established with SNAP interface in this research. The Maanshan NPP operated by Taiwan Power Company (TPC) is the only Westinghouse-PWR in Taiwan. The rated core thermal power is 2775 MW. The reactor coolant system has three loops, each of which includes a reactor coolant pump and a steam generator. The pressurizer is connected to the hot-leg piping in loop 2. This research first analyzes the SBO accident happened on 18 March, 2001 by using TRACE code and compares the results with plant data. The results show good agreement with plant data, and then this model is used to analyze the mitigation strategies. Then, the TRACE/SNAP model was used to evaluate the postulated (ELAP) accident in Maanshan NPP, determining the effectiveness of URG and FLEX. According to the results of simulation, it can be found that the cases with the URG or FLEX can keep RCS water level above TAF, ensuring the safety function of reactor.

xv ABBREVIATIONS AND ACRONYMS ACC Accumulator BDBEE Beyond-Design-Basis External Event CAMP Code Applications and Maintenance Program E LAP Extended Loss of AC Power EOP Emergency Operating Procedure FLEX Flexible and Diverse Coping Strategies FSAR Final Safety Analysis Report LOCA Loss-Of-Coolant Accident NPP Nuclear Power Plant NTHU National Tsing Hua University RCP Reactor Coolant Pump RCS Reactor Coolant System RPV Reactor Pressure Vessel P CT Peak Cladding Temperature S BO Station Blackout SG Steam Generator SNAP Symbolic Nuclear Analysis Program TAF Top of Active Fuel TDAFW Turbine Driven Auxiliary Feedwater System TPC Taiwan Power Company U RG Ultimate Response Guideline U.S. NRC United States Nuclear Regulatory Commission

1 1 INTRODUCTION O n M arch 11th 2011, an intense earthquake an d tsunami hit Fukushima Daiichi power station, and made a sev ere damag e t o the nuclear pow er plant (NPP). Thi s tragedy shows that beyond design basis external event (BDBEE) may let pow er station fall s i nto certain circumstances such as loss of ultimate heat sink and lo ss of alternating AC power, which also called station blacko ut (SBO). Both of these event s are considered a s the most severe situation t o the nuclear pow er plant. Fukushima accide nt demonstrate s th at witho ut proper emergency equipment or mitigation strategy, NPP may i n ri sk while facin g such similar situation. To cope with such BDB event, Taiwan Pow er Company (TPC) ha s developed a method called Ultimat e Response Guideline s (URG) [1], which gives operator s the rights taking emergency step s to avoid the reactor cor e melting or the hydrogen accumulation inside the containment. Once either AC pow er or water supply cannot be restored i n time, or main action of URG including 2 step s depressurizatio n, alternative water injection and containment venting. In addition, U.S. NRC al so developed a mitigation strategy called Div erse and Flexible Coping Strategy (FLEX) to tackle with such extended SBO condition [2]. The main purpose of FLEX was to support key safety function s by providing multiple means of pow er and water supply, which can mitigat e the consequence of beyond design basi s external event. After Fukushima accident, from many investigative reports [3]-[4], SBO situation may be longer than we have concerned. The emergency respon se guideline s of sev ere accident should be modified to cope with such extended lo ss of AC pow er (ELAP) event. In this study, TRACE code was used to evaluate the postulated ELAP accident in Maanshan nuclear pow er plant, determining the effectiveness of URG and FLEX. TRACE wa s developed by U.S. NRC [5], which is for NPP thermal hydrauli c analysis, and usually applied to analyze the transients or accidents data [6]-[at nuclear power plant. In addition, Maashan TRACE/SNAP model has been built in previous study. Maanshan nuclear power plant is a 2-units Westinghouse 3-loops PWR power station operated by Taiwan power company since 1984. The accuracy and availability of Maanshan NPP TRACE/SNAP model has been verified by the comparison between FSAR data and Maanshan startup test 9]. Thi s resear ch first analyzes the Maanshan SBO accide nt happened on 18 March, 2001 by gusing Maanshan NPP TRACE/SNAP model an d compares the results with plant data to confirm the accuracy of TRACE/SNAP model again. Then, the study an d analysi s for ELAP w ere performed in this study. The scenario and assumption s of postulated ELAP event in thi s study w ere referred to the WCAP-17601-P report [10] and NUREG-1953 report [11], determining whether RCS water level will drop down below TAF while the 5th diesel generator and g as turbines are all disabled when the accident occurred. To analyze the effectiveness of URG and FLEX strategi es, thi s rese arch will run a base case witho ut any mitiation strategy and four case s with multipl e mitigation strategies under different conditions.

3 2 VERIFICATION OF MAANSHAN TRACE/SNAP MODEL FOR THE SBO EVENT 2.1 Introduction of Maanshan NPP SBO Ev ent During spring season in Taiwan, salty wind from the ocean can de grade the insulatio n of pow er transmission line and causing the instability of off-site pow er in nearby nuclear power station. On M arch 17th, 2001, 3:23 am, 345 kV off-site pow er line was lost due to seasonal salty wind and 161 kV off-site pow er was remained availabl

e. Unit 1 reactor tripped and was maintained at hot standby condition by operators. At 0:46 am, M arch 18th, a malfunctioned breaker in on-site AC pow er electri c system accidentally grounded, which produced electric ar c that damaging other electric systems. Emergency 4.16 kV bu s train A and B w ere both loss of pow er supply which is a station blackout situation. At 0:57am, turbine driven auxiliary feedwater system (TDAFW) started automatically to provide cold water i nto steam generators. At 0:58 am, reactor operators started to initiate the emergency operating procedure (EOP) to depressurize the steam generator. Auxiliary feedwater flow rate, steam generator pressure and steam generator water level w are controlled and maintained manually by the operators. At 2:54 am, the emergency diesel generator successfully supplied AC pow er to emergency 4.16 kV bu s B, SBO situation was terminated Duration of SBO i s about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, start s from 0:46 am to 2:54 am, M arch 18th, an d the temperature and pressure of reactor decreased fr om 564 K, 15.3 MPa to 472 K, 4.2 MPa respectively. Fuel s w ere cov ered with water and no radioactive material s w ere released during the whole accident. A brief accide nt scenario is shown in Tabl e 1. The verification of SBO accident i s done by Maanshan TRACE/SNAP model and the simulation starts from 0:30 am to 3:30 am, March 18th. Table 1 Maanshan SBO Accident Scenario Time(hr) Simulation Time (hr)

Event 0 -- 345 kV off

-site power lost Reactor trip 21:12 0 Simulation start with hot standby condition 21:38 0.26 Breaker failure (SBO) 21:57 0.45 Turbine driven auxiliary feedwater (TDAFW) start 21:58 0.46 Initiate EOP 570.20 (SG & RCS cooling) 23:52 2.4 SBO terminated 24:12 3 End of simulation

4 2.2 The Description of Maanshan NPP TRACE/SNAP M odel The computer code used in this research is TRACE V5.0p 4 and the model i s edited by using SNAP V2.5.1. Maanshan TRACE ba se model contains 136 hydrauli c components, 682 control blocks, 34 heat structures and 2 pow er components. Main component s including one 3-D vessel, three RCS loo ps, one pressurizer, three steam generators and basi c plantcontrol systems such as 3-element feedwater control, pressuriz er spray, pressuriz er leveland heater control, and steam dump control.The 3-D vessel compone nt contains 2 radial rings, 6 azimuthal sector s and 12 axial levels. The outer radial ring represe nts downcomer region an d the reactor core i s placed in the inn er radial rin g from axial level 3 to axial level

6. Six control rod guide tubes are connected above the core region. Nuclear fuels are modeled by 6 heat structures each represents 6908 averag e fuel rods that uniformly placed in 6 azimuthal sectors. Each RCS loop contains hot leg piping, steam generator U-tube, crossover piping, reactor coolant pum p, cold leg piping, accumulator tank and accumulator chec k valv e. Pressuriz er and pressuriz er surge line are connected on RCS l oop number 2. Thi s base model ha s been verified with Maanshan NPP startup test and FSAR data. Figure 1 show s the whole plant scheme of Maanshan TRACE/SNAP model. Plant initial condition data calcul ated by TRACE steady-state calculation are listed in Table 2. Table 2 Maanshan NPP Steady-State Initial Condition Plant Data TRACE Error(%) Core thermal power(MW) 2822 2822 0 RCS pressure (MPa) 15.513 15.518 0.03 Total RCS flow (Mkg/hr) 49.59 49.57 0.04 Pressurizer liquid volume (m3) 23.79 23.786 0.017 Hot-leg Temperature (K) 599.75 601.7 0.33 Cold-leg Temperature (K) 565.35 566.57 0.22 Steam generator pressure (MPa) 6.74 6.91 2.5 Steam temperature (K) 555.45 558.09 0.48 Steam generator narrow range water level (%)

50 50 0 5 Figure 1 Schematic Diagram of Maanshan TRACE/SNAP Mo del 6 2.3 The Modeling of Maanshan SBO Event The simulation is separated into two parts, which are (1) reaching the initial hot standby condition and (2) the simulation of SBO accident. Before the accident started, reactor was shut down and maintained at hot standby condition by operators. Steam generator water level was at about 50%, steam pressure was about 7.45 MPa, reactor coolant system pressure was 15.4 MPa, and pressurizer water level was at 62.5%. In part 1, some additional control logic in the model is used to achieve the initial condition, such as increase and control reactor coolant system pressure by pressurizer heater, controlled steam generator feedwater flow and PORV open fraction to maintain water level and steam pressure, and refill the RCS inventory by a FILL component if pressurizer water level is less than 62.5%. In part 2, several plant data are input as boundary conditions of SBO simulation. Steam generator PORVs open fraction are controlled base on steam pressure plant data so that pressure in all three steam generators appear the same trend with plant data during the whole simulation. Steam generator auxiliary feedwater flow data are also input as a boundary condition and flow into steam generator via a FILL component connected on the steam generator downcomer, the temperature auxiliary feedwater flow is 293 K. Reactor has shut down for about 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> prior to SBO accident, decay heat within the core has decreased to very low level, therefore reactor power is set constant at 0.6% (about 16.65 MWt) during the simulation. 2.4 The TRACE Results for the SBO Event SBO happens at 16 minutes after the simulation starts. 11 minutes after SBO, turbine driven auxiliary feedwater system (TDAFW) automatically start. Operators control the auxiliary feedwater flow rate via regulating the throttling valve in order to maintain steam generator water level. Due to TDAFW system, steam generators narrow range water level simulation results are above 50% most of the time and show similar trend with plant data. Steam generator narrow range water level results are shown in Figure 2. 12 minutes after SBO, the operators start to initiate emergency operating procedure (EOP) to lower the steam generator pressure by opening steam line PORV. In TRACE, PORVs are controlled base on steam pressure plant data, steam generators pressure simulation results are shown in Figure 3. Steam generator depressurization can effectively remove residual heat from reactor coolant system, therefore coolant temperature and pressure decrease as steam generator pressure become lower. Figure 4 show the cold leg liquid temperature for three RCS loops respectively. Figure 5 shows the reactor coolant system pressure variation. As the RCS coolant temperature decrease, coolant density also becomes smaller which lead to shrinkage of RCS coolant, therefore pressurizer water level decrease. When reactor coolant system pressure become lower than accumulator nitrogen gas pressure which is about 4.2 MPa, water inside accumulator automatically injected into RCS via two check valves. During 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> SBO duration, the operators successfully execute RCS cooling by controlled-depressurization of steam generators. Since no emergency power available during SBO, the turbine driven auxiliary feedwater system become the most important coolant injection system. Reactor temperature and pressure decreased form 564 K, 15.3 MPa to 472 K, 4.2 MPa respectively, and no radioactive material was released during SBO. After emergency power was recovered, residual heat removal system took place to remove the decay heat continuously. From the above results, the TRACE results for SBO accident shows good agreement with the plant data. In addition, the results which are obtained by TRACE V5.0p3 / SNAP V2.2.1 are also shown in the Figure 2~5.

7 Figure 2 Steam Generator #2 Narrow Range Water Level Figure 3 Steam Generator #2 Pressure

8 Figure 4 Cold Leg #2 Liquid Temperature Figure 5 Reactor Coolant System Pressure

9 3 DESCRIPTION OF MODELING METHOD FOR ELAP EVENT WITH URG AND FLEXTo determine the severity of ELAP event and the mitigation capability of URG and FLEX strategy, this research will run a base case without any mitigation strategy, and four cases with multiple mitigation strategy. All the cases are in a situation of ELAP event. The scenario and assumptions of ELAP event in this study were referred to the WCAP-17601-P report. 3.1 Base C ase (no mitigation strategy, Case 0) In base case (Case 0), we assumed an earthquake occurred at 1 minute which resulted in the reactor scram, MSIV closure, turbine trip, feedwater trip, and RCP seal leakage. Table 3 shows the sequence of the base case.

Seal begins to leak at a rate of 5gpm per loop at th e moment and rises up to 21gpm per loop after 14 minute due to the flashing across seal face. After two hours, there is a control depressurization activated on the secondary side to maintain SG pressure at about 300 psia. In this case, the TDAFP and accumulator are assumed to be available at all times. 3.2 Mitigation trategy with URG or FLEX (Ca se 1~4) The main difference between URG and FLEX is that FLEX owing to the FSG (FLEX Support Guideline) high pressure injection equipment, there is no need to perform emergency depressurization. The URG w as simulated in Case 1 and 2. The FLEX w as simulated in Case 3 and 4. The sequence of each case is listed on Tabl e 4. In case s with multipl e mitigatio n strategy, unlike base case, we assume th at seal begins to leak at a rate of 21gpm p er loop as earthquake occurred at 1 minute. Control depressurization will also be activ ated at the moment. In Case 1 and 2, each case will follow URG strategy while the ELAP event l asts for more than 8 and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Otherwi se, i n Case 3 and 4, we assum e that the plant ha s FSG hig h pressure injection equipment. Each case will follow FLEX strategy once ELAP event lasts for more than 8 and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Table 3 The Se quence of Ba se Ca se *The TDAFP and accumulator is available.Event (Base case)

Time(min) Start of simulation 0 The SBO, reactor scram, turbine trip, MSIV closure, RCP trip, feedwater trip, and seal leakage occur.

Seal leakage rate is 5 gpm/loop 1 Seal leakage rate rise up to 21 gpm/loop 14 Control depressurization, SG pressure depressurize to 21 kg/cm² (300 psi a) 120 End of simulation

10 Table 4 The Se quences of Ca se 1~4 Event Time (min) Case 1 Case 2 Case 3 Case 4 Start of simulation 0 The SBO, reactor scram, turbine trip, MSIV closure , RCP trip, feedwater trip, and seal leakage occur TDAFP on Seal leakage rate is 21 gpm/loop Control depressurization, SG pressure depressurize to 21 kg/cm² (300 psi a) 1 Emergency depressurization, SG pressure depressurize to 3 kg/cm² 480(8hr) 1440(24hr) x x TDAFP off Fire pump 800 gpm (35.704 Kg/s) to SG Hydro-Test pump 25 gpm (1.14 Kg/s ) to RPV 480(8hr) 1440(24hr) x x TDAFP off FSG pump 215 gpm(9.595 Kg/s) to SG FSG pump 40 gpm (1.79 Kg/s) to RPV x x 480(8hr) 1440(24hr)

End of simulation 4800(80hr)

11 4 RESULTS 4.1 The Results of C ase 0 Figure 6~11 present the TRACE analysis results for Case 0. In this case, the SBO occurred at 1 minute. Then, the reactor scram and control depressurization occurred which caused the SG and RCS pressures to decrease (see Fig. 6). The SG water level kept at full water level since TDAFP was available (see Fig. 7). In base case, without any mitigation measure, RCS water level dropped down below TAF at 61.89hr because of the seal leakage (see Fig.

8). It should be noticed that once RCS water level dropped down to the elevation of seal break (7.92m), there would be an oscillation on seal leakage rate since there were no coolant but steam still leak out from seal at the moment (shown in Fig. 9). Fig. 10 shows the water level of the accumulator. The accumulator started to inject water at about 3.6 hr. The PCT started to increase after the RCS water level lower than TAF (shown in Fig. 11).

Figure 6 RCS and SG Pressure of Case 0 12 Figure 7 SG Water Level of Case 0 Figure 8 RCS Water Level of Case 0 13 Figure 9 Seal Leakage Rate of Case 0 Figure 10 ACC Water Level of Case 0 14 Figure 11 Peak Cladding Temperature of Case 0 4.2 The Results of C ase 1 Figure 12~

17 illustrate the TRACE analysis results for Case 1. The URG was simulated in Case 1. Therefore, the control and emergency depressurizations were performed in this case. In addition, the water injection of fire and Hydro-Test pumps (at 8 hr, see Table 4) were performed in this case. In this case, the SBO occurred at 1 minute first. Subsequently , the reactor scram and control depressurization occurred which resulted in the RCS and SG pressures dropping (see Fig.

12). The RCS and SG pressures decreased again due to the emergency depressurization after 8 hr. The SG water level kept at full water level since TDAFP was available (see Fig.

13) during 0 minute~8 hr. After 8hr, the fire pump injected water to SGs and Hydro-Test pump injected water to RPV. Therefore, the SG water level still kept at full water level and RCS water level increased after 8 hr (shown in Fig. 13 and 14). The seal leakage rate result is shown in Fig. 15. The RCS pressure affects the seal leakage rate. Fig. 16 shows the water level of the accumulator. The accumulator started to inject water at about 0.2 hr. The PCT is always under 1088.7 K because the RCS water level is above the TAF (see Fig. 17).

15 Figure 12 RCS and SG Pressure of Case 1 Figure 13 SG Water Level of Case 1 16 Figure 14 RCS Water Level of Case 1 Figure 15 Seal Leakage Rate of Case 1 17 Figure 16 ACC Water Level of Case 1 Figure 17 Peak Cladding Temperature of Case 1 18 4.3 The Results of C ase 2 Figure 18~23 show the TRACE analysis results for Case 2. The URG was simulated in Case 2.Hence , the control and emergency depressurizations were performed in this case. Inaddition, the water injection of fire and Hydro-Test pumps (at 24 hr, see Table 4) wereperformed in this case. In this case, the SBO occurred at 1 minute first.

Then , the reactorscram and control depressurization occurred which resulted in the RCS and SG pressuresdecrease (see Fig. 18). The RCS and SG pressures went down again due to the emergencydepressurization after 24 hr. The SG water level kept at full water level since TDAFP wasavailable (see Fig. 19) during 0 minute~

24 hr. After 24hr, the fire pump injected water to SG s and Hydro-Test pump injected water to RPV. Therefore, the SG water level still kept at fullwater level and RCS water level increased after 24 hr (shown in Fig. 19 and 20). The sealleakage rate result is shown in Fig.

21. The RCS pressure affects the seal leakage rate. Fig.

22 presents the water level of the accumulator. The accumulator began to inject water at about 0.2 hr. The PCT is always under 1088.7 K because the RCS water level is above theTAF (see Fig.

23).Figure 18 RCS and SG Pressure of Case 2 19 Figure 19 SG Water Level of Case 2 Figure 20 RCS Water Level of Case 2 20 Figure 21 Seal Leakage Rate of Case 2 Figure 22 ACC Water Level of Case 2 21 Figure 23 Peak Cladding Temperature of Case 2 4.4 The Results of C ase 3 Figure 24~29 present the TRACE analysis results for Case 3. The FLEX was simulated in this case. Therefore, the control depressurization w as performed in this case. In addition, the water injection of FSG pumps (at 8 hr, see Table

4) were also performed in this case. In this case, the SBO occurred at 1 minute first. Subsequently , the reactor scram and control depressurization occurred which caused the RCS and SG pressures to drop (see Fig.

24). The SG water level kept at full water level since TDAFP was available (see Fig.

25) during 0 minute~8 hr. After 8hr, the FSG pump (215 gpm) injected water to SGs and FSG pump (40 gpm) injected water to RPV. Therefore, the SG water level still kept at full water level and RCS water level increased after 8 hr (shown in Fig.

25 and 26). Fig. 27 shows t he seal leakage rate result. The RCS pressure affects the seal leakage rate. Fig.

28 illustrates the water level of the accumulator. The accumulator started to inject water at about 0.2 hr. The PCT is always under 1088.7 K because the RCS water level is above the TAF (see Fig.

29).

22 Figure 24 RCS and SG Pressure of Case 3 Figure 25 SG Water Level of Case 3 23 Figure 26 RCS Water Level of Case 3 Figure 27 Seal Leakage Rate of Case 3 24 Figure 28 ACC Water Level of Case 3 Figure 29 Peak Cladding Temperature of Case 3

25 4.5 The Results of C ase 4 Figure 30~35 illustrate the TRACE analysis results for Case 4. The FLEX was simulated in Case 4. Therefore, the control depressurization w as performed in this case. In addition, the FSG pumps (at 24 hr, see Table 4) were performed in this case. In this case, the SBO occurred at 1 minute first. Then , the reactor scram and control depressurization occurred which resulted in the RCS and SG pressures dropping (see Fig.

30). The SG water level kept at full water level since TDAFP was available (see Fig.

31) before 24 hr. After 24 hr, the FSG pump (215 gpm) injected water to SGs and FSG pump (40 gpm) injected water to RPV. Therefore, the SG water level still kept at full water level and RCS water level increased after 24 hr (see Fig.

31 and 32). The seal leakage rate result is shown in Fig.

33. Fig. 34 depicts the water level of the accumulator. The accumulator began to inject water at about 0.2 hr. The PCT is always lower than 1088.7 K because the RCS water level is above the TAF (see Fig. 35). Figure 30 RCS and SG Pressure of Case 4 26 Figure 31 SG Water Level of Case 4 Figure 32 RCS Water Level of Case 4 27 Figure 33 Seal Leakage Rate of Case 4 Figure 34 ACC Water Level of Case 4 28 Figure 35 Peak Cladding Te mperature of Case 4 According to th e abov e results, it could be found that all 4 case s wit h mitigation strategy in thi s study coul d keep RCS water level above TA F, ensuring the safety function of reactor. Throug h the comparison betwee n Case1~2 and Case 3~4, RCS could cooldown effectively during transient with the action of subsequent depressurization in URG strategy. And the tim e for URG cases which reached the full RCS water level i s earlier than FLEX cases. Additionally, the URG could reduce the seal leakage rate effectively.

29 5 CONCLUSIONS By using TRACE and SNAP codes, this study has developed a method to simulate and analysis the ELAP event for Maanshan NPP. Several conclusions are as follows: Once ELAP event occurred, there were about 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> to prepare multiple means ofpower and water supply to keep Maanshan NPP in a safe condition.The action of two steps depressurization for the URG could reduce the seal leakagerate effectively but still kept RCS water level above TAF.Two-step depressurizations could extend the time available to cope with the lineup of the alternate water.The URG or FLEX can keep RCS water level above TAF for the ELAP event. These results can help the decision making of mitigation strategy for the ELAPaccident.

30 31 6 REFERENCES 1.Taiwan Power Company, Maanshan Nuclear Power Plant Ultimate Response Guideline,No. 1451 (2014).2.NEI, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, NEI 12-06 (2012).3.C. Miller, A. Cabbage, D. Dorman, J. Grobe, G. Holahan and N. Sanfilippo,Recommendations for Enhancing R eactor Safety in the 21st Century (2011)

.4.Institute of Nuclear Power Operations, Near-term Actions to Address the Effect of anExtended Loss of All AC Power in Response to the Fukushima Daiichi Event, INPO IER11-4 (2011).5.U.S. NRC, TRACE V5.840 U M anual (2014).6.J. R. Wang, H. T. Lin, Y. H. Cheng, W. C. Wang and C. Shih, TRACE Modeling and itsVerification using Maanshan PWR Start-up Tests, Annals of Nuclear Energy, Volume 36,Issue 4, pp. 527-536 (2009)

.7.Y. H. Cheng, J. R. Wang, H. T. Lin and C. Shih, Benchmark Calculations of Pressurizer Model for Maanshan Nuclear Power Plant using TRACE Code, Nuclear Engineering andDesign, Volume 239, Issue 11, pp. 2343-2348 (2009)

.8.J. H. Yang, J. R. Wang, H. T. Lin and C. Shih, LBLOCA Analysis for the Maanshan PWRNuclear Power Plant using TRACE, Energy Procedia, Volume 14, pp. 292-297 (2012).9.K. C. Huang, C. Shih and J. R. Wang, Analysis of Maanshan Station Blackout Accident and Ultimate Response Guideline using TRACE Code, National Tsing Hua University (2012).10.PWROG, Reactor Coolant System Response to the Extended Loss of AC Power Event for Westinghouse, Combustion Engineering and Babcock & Wilcox NSSS Designs,WCAP-17601-P (2012).11.H. Esmaili, D. Helton, D. Marksberry, R. Sherry, P. Appignani, D. Dube, M. Tobin, R. Buell,T.Koonce and J. Schroeder, Confirmatory Thermal-Hydraulic Analysis to Support SpecificSuccess Criteria in the Standardized Plant Analysis Risk Models - Surry and PeachBottom, NUREG-1953 (2011)

.

NUREG/IA-0496 International Agreement Report The Analysis and Study of ELAP Event and Mitigation Strategies sing TRACE Code for Maanshan PWR Prepared by: Jung-Hua Yang, Jong-Rong Wang, Chunkuan Shih, Yu Chiang, Chun-Fu Huang, Shao-Wen Chen, Ting-Y i Wang*, Tzu-Yao Yu*Nuclear and New Energy Education and Research Foundation Institute of Nuclear Engineering and Science, National Tsing Hua University 101 Section 2, Kuang Fu Rd., HsinChu, Taiwan *Department of Nuclear Safety, Taiwan Power Company 242, Section 3, Roosevelt Rd., Zhongzheng District, Taipei, Taiwan K.Tien, NRC Project Manager Division of Systems Analysis Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission

Washington, DC20555-00 01 Manuscript Completed:January 201 8 Date Published:February 2019 Prepared as part of The Agreement on Research Participation and Technical Exchange Under the Thermal-Hydraulic Code Applications and Maintenance Program (CAMP)Published by U.S. Nuclear Regulatory Commission AVAILABILITY OF REFERENCE MATERIALSIN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at

NRC's Library at www.nrc.gov/reading-rm.html. Publicly released records include, to name a few, NUREG-series publications; Federal Register notices; applicant, licensee, and vendor documents and correspondence; NRC correspondence and internal memoranda; bulletins

and information notices; inspection and investigative

reports; licensee event reports; and Commission papers

and their attachments.

NRC publications in the NUREG series, NRC regulations, and Title 10, "Energy," in the Code of Federal Regulations may also be purchased from one of these two sources. The Superintendent of Documents Mail Stop IDCC

Washington, DC 20402-0001

Internet:

bookstore.gpo.gov

T elephone: (202) 512-1800

Fax: (202) 512-2104 The National Technical Information Service 5301 Shawnee R dAlexandria, VA 22312-0002 www.ntis.gov800-553-6847 or, locally, (703) 605-6000A single copy of each NRC draft report for comment isavailable free, to the extent of supply, upon written

request as follows:

Address: U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: distribution.resource@nrc.gov

Facsimile: (301) 415-2289 Some publications in the NUREG series that are posted at NRC's Web site address www.nrc.gov/reading-rm/

doc-collections/nuregs are updated periodically and may differ from the last printed version. Although references to material found on a Web site bear the date the material

was accessed, the material available on the date cited

may subsequently be removed from the site.

Non-NRC Reference Material Documents available from public and special technical libraries include all open literature items, such as books, journal articles, transactions, Federal Register notices, Federal and State legislation, and congressional reports.

Such documents as theses, dissertations, foreign reports

and translations, and non-NRC conference proceedings

may be purchased from their sponsoring organization.

Copies of industry codes and standards used in a substantive manner in the NRC regulatory process are

maintained at-The NRC Technical Library Two White Flint North 11545 Rockville Pike

Rockville, MD 20852-2738 These standards are available in the library for reference

use by the public. Codes and standards are usually

copyrighted and may be purchased from the originating organization or, if they are American National Standards, from-American National Standards Institute 11 West 42nd Street New York, NY 10036-8002 www.ansi.org (212)642-4900 Legally binding regulatory requirements are stated only in laws; NRC regulations; licenses, including technical

speci views expressed in contractor prepared publications in

this series are not necessarily those of the NRC.

The NUREG series comprises (1) technical and adminis-trative reports and books prepared by the staff (NUREG-

XXXX)or agency contractors (NUREG/CR-XXXX), (2) proceedings of conferences (NUREG/CP-XXXX), (3) reports

resulting from international agreements (NUREG/IA-XXXX),

(4)brochures (NUREG/BR-XXXX), and (5) compilations of legal decisions and orders of the Commission and Atomic and Safety Licensing Boards and of Directors' decisions under Section 2.206 of NRC's regulations (NUREG-0750).

DISCLAIMER:

This report was prepared under an international cooperative agreement for the exchange of

technical information. Neither the U.S. Government nor any

agency thereof, nor any employee, makes any warranty, expressed or implied, or assumes any legal liability or

responsibility for any third party's use, or the results of such

use, of any information, apparatus, product or process

disclosed in this publication, or represents that its use by

such third party would not infringe privately owned rights.

NUREG/IA-0496 International Agreement Report The Analysis and Study of ELAP Event and Mitigation Strategies sing TRACE Code for Maanshan PWR Prepared by: Jung-Hua Yang, Jong-Rong Wang, Chunkuan Shih, Yu Chiang, Chun-Fu Huang, Shao-Wen Chen, Ting-Y i Wang*, Tzu-Yao Yu* Nuclear and New Energy Education and Research Foundation Institute of Nuclear Engineering and Science, National Tsing Hua University 101 Section 2, Kuang Fu Rd., HsinChu, Taiwan *Department of Nuclear Safety, Taiwan Power Company 242, Section 3, Roosevelt Rd., Zhongzheng District, Taipei, Taiwan K.Tien, NRC Project Manager Division of Systems Analysis Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC20555-00 01 Manuscript Completed:January 201 8 Date Published:February 2019 Prepared as part of The Agreement on Research Participation and Technical Exchange Under the Thermal-Hydraulic Code Applications and Maintenance Program (CAMP) Published by U.S. Nuclear Regulatory Commission

iii ABSTRACT In this study, TRACE code was used to evaluate the postulated Extended Loss of AC Power (ELAP) accident in Maanshan nuclear power plant (NPP), determining whether RCS water level will drop down below Top of Active Fuel (TAF) while the 5th diesel generator and gas turbines are all disabled when the accident occurred. The scenario and assumptions of postulated ELAP event in this study were referred to the WCAP-17601-P report and NUREG-1953 report. To analyze the effectiveness of URG and FLEX strategies, this research will run a base case without any mitigation strategy and four cases with multiple mitigation strategy under different conditions. According to the results of simulation, it can be found that all four cases in this study can keep RCS water level above TAF, ensuring the safety function of reactor.

iv v FOREWORD The U.S. NRC (United States Nuclear Regulatory Commission) has developed a thermal hydraulic analysis code-RELAP5. RELAP5 has been designed to perform best-estimate analysis of loss-of-coolant accidents (LOCAs), operational transients, and other accident scenarios in reactor systems. Models used include multidimensional two-phase flow, non-equilibrium thermo-dynamics, generalized heat transfer, reflood, level tracking, and reactor kinetics. Traditionally, the RELAP5 code analysis model was developed by ASCII file, which was not intelligible for the beginners of computer analysis. Fortunately, a graphic input interface, SNAP (Symbolic Nuclear Analysis Program) is developed by Applied Technology Incorporation Inc. and the model development process becomes more conveniently. To obtain the authorization of these codes, Taiwan and the United States have signed an agreement on CAMP (Code Applications and Maintenance Program) which includes the development and maintenance of TRACE code. NTHU (National Tsing Hua University) is the organization in Taiwan responsible for the application TRACE and SNAP in thermal hydraulic safety analysis. To meet this responsibility, the TRACE/SNAP model of Maanshan nuclear power plant has been developed. This model was used to perform the URG and FLEX strategies study for ELAP.

vi vii TABLE OF CONTENTSABSTRACT ..........................................................................................................................

iii FOREWORD ........................................................................................................................ v LIST OF FIGURES

............................................................................................................... ix LIST OF TABLES

................................................................................................................. xi EXECUTIVE

SUMMARY

.................................................................................................... xi ii ABBREVIATIONS AND ACRONYMS

................................................................................. xv 1 INTRODUCTION

............................................................................................................. 1 2 VERIFICATION OF MAANSHAN TRACE/SNAP MODEL FOR THE SBO EVENT

........ 3

...

...

3 DESCRIPTION OF MODELING METHOD FOR ELAP EVENT WITH URG AND FLEX .............................................................................................................................

..9 ) )

........9 4 RESULTS .....................................................................................................................

11

..

11 14

..

18

..

..

5 CONCLUSIONS

............................................................................................................

29 6 REFERENCES

..............................................................................................................

31 viii ix FIGURESPage Figure 1 Schematic Diagram of Maanshan TRACE/SNAP M odel ................................. 5 Figure 2 Steam Generator #2 Narrow Range Water Level ............................................ 7 Figure 3 Steam Generator #2 Pressure ......................................................................... 7 Figure 4 Cold Leg #2 Liquid Temperature ..................................................................... 8 Figure 5 Reactor Coolant System Pressure .................................................................. 8 Figure 6 RCS and SG Pressure of Case 0 ..................................................................

11 Figure 7 SG Water Level of Case 0 ............................................................................. 12 Figure 8 RCS Water Level of Case 0 ..........................................................................

12 Figure 9 Seal Leakage Rate of Case 0 ........................................................................

13 Figure 10 ACC Water Level of Case 0 ..........................................................................

13 Figure 11 Peak Cladding Temperature of Case 0 .........................................................

14 Figure 12 RCS and SG Pressure of Case 1 ..................................................................

15 Figure 13 SG Water Level of Case 1.............................................................................

15 Figure 14 RCS Water Level of Case 1 ..........................................................................

16 Figure 15 Seal Leakage Rate of Case 1 .......................................................................

16 Figure 16 ACC Water Level of Case 1 ..........................................................................

17 Figure 17 Peak Cladding Temperature of Case 1 .........................................................

17 Figure 18 RCS and SG Pressure of Case 2 ..................................................................

18 Figure 19 SG Water Level of Case 2.............................................................................

19 Figure 20 RCS Water Level of Case 2 ..........................................................................

19 Figure 21 Seal Leakage Rate of Case 2 .......................................................................

20 Figure 22 ACC Water Level of Case 2 ..........................................................................

20 Figure 23 Peak Cladding Temperature of Case 2 .........................................................

21 Figure 24 RCS and SG Pressure of Case 3 ..................................................................

22 Figure 25 SG Water Level of Case 3.............................................................................

22 Figure 26 RCS Water Level of Case 3 ..........................................................................

23 Figure 27 Seal Leakage Rate of Case 3 .......................................................................

23 Figure 28 ACC Water Level of Case 3 ..........................................................................

24 Figure 29 Peak Cladding Temperature of Case 3 .........................................................

24 Figure 30 RCS and SG Pressure of Case 4 ..................................................................

25 Figure 31 SG Water Level of Case 4.............................................................................

26 Figure 32 RCS Water Level of Case 4 ..........................................................................

26 Figure 33 Seal Leakage Rate of Case 4 .......................................................................

27 Figure 34 ACC Water Level of Case 4 ..........................................................................

27 Figure 35 Peak Cladding Temperature of Case 4 .........................................................

28

xi LIST OF TABLES Page Table 1 Maanshan SBO Accident Scenario .................................................................... 3 Table 2 Maanshan NPP Steady-State Initial Condition

................................................... 4 Table 3 The Sequence of Base Case.............................................................................. 9 Table 4 The Sequences of Case 1~4 ............................................................................

10

xiii EXECUTIVE

SUMMARY

An agreement in 2004 which includes the development and maintenance of TRACE has been signed between Taiwan and USA on CAMP.

NTHU is the organization in Taiwan responsible for applying TRACE to thermal hydraulic safety analysis in order to provide users experiences and development suggestions. To fulfill this responsibility, the TRACE model of Maanshan Nuclear Power Station is developed by NTHU. According to the TRACE users manual, it is the product of a long term effort to combine the capabilities -P, TRAC-B, RELAP5 and RAMONA) into one modernized computational tool. Therefore, in the future, NRC has ensured that TRACE will be the main code used in thermal hydraulic safety analysis, without further development of other thermal hydraulic codes such as RELAP5 and TRAC. Besides, the 3-D geometry model of reactor vessel is one of the features of TRACE. It can support a more accurate and detailed safety analysis of NPPs. SNAP is an interface of NPP analysis codes and developed by U.S. NRC and Applied Programming Technology, Inc. Different from the traditional input deck in ASCII files, the graphical control blocks and thermal hydraulic connections make researches comprehend the whole power plant and control system more easily. Due to these advantages, the RELAP5/MOD3.3 model for Lungmen NPP was established with SNAP interface in this research. The Maanshan NPP operated by Taiwan Power Company (TPC) is the only Westinghouse-PWR in Taiwan. The rated core thermal power is 2775 MW. The reactor coolant system has three loops, each of which includes a reactor coolant pump and a steam generator. The pressurizer is connected to the hot-leg piping in loop 2. This research first analyzes the SBO accident happened on 18 March, 2001 by using TRACE code and compares the results with plant data. The results show good agreement with plant data, and then this model is used to analyze the mitigation strategies. Then, the TRACE/SNAP model was used to evaluate the postulated (ELAP) accident in Maanshan NPP, determining the effectiveness of URG and FLEX. According to the results of simulation, it can be found that the cases with the URG or FLEX can keep RCS water level above TAF, ensuring the safety function of reactor.

xv ABBREVIATIONS AND ACRONYMS ACC Accumulator BDBEE Beyond-Design-Basis External Event CAMP Code Applications and Maintenance Program E LAP Extended Loss of AC Power EOP Emergency Operating Procedure FLEX Flexible and Diverse Coping Strategies FSAR Final Safety Analysis Report LOCA Loss-Of-Coolant Accident NPP Nuclear Power Plant NTHU National Tsing Hua University RCP Reactor Coolant Pump RCS Reactor Coolant System RPV Reactor Pressure Vessel P CT Peak Cladding Temperature S BO Station Blackout SG Steam Generator SNAP Symbolic Nuclear Analysis Program TAF Top of Active Fuel TDAFW Turbine Driven Auxiliary Feedwater System TPC Taiwan Power Company U RG Ultimate Response Guideline U.S. NRC United States Nuclear Regulatory Commission

1 1 INTRODUCTION O n M arch 11th 2011, an intense earthquake an d tsunami hit Fukushima Daiichi power station, and made a sev ere damag e t o the nuclear pow er plant (NPP). Thi s tragedy shows that beyond design basis external event (BDBEE) may let pow er station fall s i nto certain circumstances such as loss of ultimate heat sink and lo ss of alternating AC power, which also called station blacko ut (SBO). Both of these event s are considered a s the most severe situation t o the nuclear pow er plant. Fukushima accide nt demonstrate s th at witho ut proper emergency equipment or mitigation strategy, NPP may i n ri sk while facin g such similar situation. To cope with such BDB event, Taiwan Pow er Company (TPC) ha s developed a method called Ultimat e Response Guideline s (URG) [1], which gives operator s the rights taking emergency step s to avoid the reactor cor e melting or the hydrogen accumulation inside the containment. Once either AC pow er or water supply cannot be restored i n time, or main action of URG including 2 step s depressurizatio n, alternative water injection and containment venting. In addition, U.S. NRC al so developed a mitigation strategy called Div erse and Flexible Coping Strategy (FLEX) to tackle with such extended SBO condition [2]. The main purpose of FLEX was to support key safety function s by providing multiple means of pow er and water supply, which can mitigat e the consequence of beyond design basi s external event. After Fukushima accident, from many investigative reports [3]-[4], SBO situation may be longer than we have concerned. The emergency respon se guideline s of sev ere accident should be modified to cope with such extended lo ss of AC pow er (ELAP) event. In this study, TRACE code was used to evaluate the postulated ELAP accident in Maanshan nuclear pow er plant, determining the effectiveness of URG and FLEX. TRACE wa s developed by U.S. NRC [5], which is for NPP thermal hydrauli c analysis, and usually applied to analyze the transients or accidents data [6]-[at nuclear power plant. In addition, Maashan TRACE/SNAP model has been built in previous study. Maanshan nuclear power plant is a 2-units Westinghouse 3-loops PWR power station operated by Taiwan power company since 1984. The accuracy and availability of Maanshan NPP TRACE/SNAP model has been verified by the comparison between FSAR data and Maanshan startup test 9]. Thi s resear ch first analyzes the Maanshan SBO accide nt happened on 18 March, 2001 by gusing Maanshan NPP TRACE/SNAP model an d compares the results with plant data to confirm the accuracy of TRACE/SNAP model again. Then, the study an d analysi s for ELAP w ere performed in this study. The scenario and assumption s of postulated ELAP event in thi s study w ere referred to the WCAP-17601-P report [10] and NUREG-1953 report [11], determining whether RCS water level will drop down below TAF while the 5th diesel generator and g as turbines are all disabled when the accident occurred. To analyze the effectiveness of URG and FLEX strategi es, thi s rese arch will run a base case witho ut any mitiation strategy and four case s with multipl e mitigation strategies under different conditions.

3 2 VERIFICATION OF MAANSHAN TRACE/SNAP MODEL FOR THE SBO EVENT 2.1 Introduction of Maanshan NPP SBO Ev ent During spring season in Taiwan, salty wind from the ocean can de grade the insulatio n of pow er transmission line and causing the instability of off-site pow er in nearby nuclear power station. On M arch 17th, 2001, 3:23 am, 345 kV off-site pow er line was lost due to seasonal salty wind and 161 kV off-site pow er was remained availabl

e. Unit 1 reactor tripped and was maintained at hot standby condition by operators. At 0:46 am, M arch 18th, a malfunctioned breaker in on-site AC pow er electri c system accidentally grounded, which produced electric ar c that damaging other electric systems. Emergency 4.16 kV bu s train A and B w ere both loss of pow er supply which is a station blackout situation. At 0:57am, turbine driven auxiliary feedwater system (TDAFW) started automatically to provide cold water i nto steam generators. At 0:58 am, reactor operators started to initiate the emergency operating procedure (EOP) to depressurize the steam generator. Auxiliary feedwater flow rate, steam generator pressure and steam generator water level w are controlled and maintained manually by the operators. At 2:54 am, the emergency diesel generator successfully supplied AC pow er to emergency 4.16 kV bu s B, SBO situation was terminated Duration of SBO i s about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, start s from 0:46 am to 2:54 am, M arch 18th, an d the temperature and pressure of reactor decreased fr om 564 K, 15.3 MPa to 472 K, 4.2 MPa respectively. Fuel s w ere cov ered with water and no radioactive material s w ere released during the whole accident. A brief accide nt scenario is shown in Tabl e 1. The verification of SBO accident i s done by Maanshan TRACE/SNAP model and the simulation starts from 0:30 am to 3:30 am, March 18th. Table 1 Maanshan SBO Accident Scenario Time(hr) Simulation Time (hr)

Event 0 -- 345 kV off

-site power lost Reactor trip 21:12 0 Simulation start with hot standby condition 21:38 0.26 Breaker failure (SBO) 21:57 0.45 Turbine driven auxiliary feedwater (TDAFW) start 21:58 0.46 Initiate EOP 570.20 (SG & RCS cooling) 23:52 2.4 SBO terminated 24:12 3 End of simulation

4 2.2 The Description of Maanshan NPP TRACE/SNAP M odel The computer code used in this research is TRACE V5.0p 4 and the model i s edited by using SNAP V2.5.1. Maanshan TRACE ba se model contains 136 hydrauli c components, 682 control blocks, 34 heat structures and 2 pow er components. Main component s including one 3-D vessel, three RCS loo ps, one pressurizer, three steam generators and basi c plantcontrol systems such as 3-element feedwater control, pressuriz er spray, pressuriz er leveland heater control, and steam dump control.The 3-D vessel compone nt contains 2 radial rings, 6 azimuthal sector s and 12 axial levels. The outer radial ring represe nts downcomer region an d the reactor core i s placed in the inn er radial rin g from axial level 3 to axial level

6. Six control rod guide tubes are connected above the core region. Nuclear fuels are modeled by 6 heat structures each represents 6908 averag e fuel rods that uniformly placed in 6 azimuthal sectors. Each RCS loop contains hot leg piping, steam generator U-tube, crossover piping, reactor coolant pum p, cold leg piping, accumulator tank and accumulator chec k valv e. Pressuriz er and pressuriz er surge line are connected on RCS l oop number 2. Thi s base model ha s been verified with Maanshan NPP startup test and FSAR data. Figure 1 show s the whole plant scheme of Maanshan TRACE/SNAP model. Plant initial condition data calcul ated by TRACE steady-state calculation are listed in Table 2. Table 2 Maanshan NPP Steady-State Initial Condition Plant Data TRACE Error(%) Core thermal power(MW) 2822 2822 0 RCS pressure (MPa) 15.513 15.518 0.03 Total RCS flow (Mkg/hr) 49.59 49.57 0.04 Pressurizer liquid volume (m3) 23.79 23.786 0.017 Hot-leg Temperature (K) 599.75 601.7 0.33 Cold-leg Temperature (K) 565.35 566.57 0.22 Steam generator pressure (MPa) 6.74 6.91 2.5 Steam temperature (K) 555.45 558.09 0.48 Steam generator narrow range water level (%)

50 50 0 5 Figure 1 Schematic Diagram of Maanshan TRACE/SNAP Mo del 6 2.3 The Modeling of Maanshan SBO Event The simulation is separated into two parts, which are (1) reaching the initial hot standby condition and (2) the simulation of SBO accident. Before the accident started, reactor was shut down and maintained at hot standby condition by operators. Steam generator water level was at about 50%, steam pressure was about 7.45 MPa, reactor coolant system pressure was 15.4 MPa, and pressurizer water level was at 62.5%. In part 1, some additional control logic in the model is used to achieve the initial condition, such as increase and control reactor coolant system pressure by pressurizer heater, controlled steam generator feedwater flow and PORV open fraction to maintain water level and steam pressure, and refill the RCS inventory by a FILL component if pressurizer water level is less than 62.5%. In part 2, several plant data are input as boundary conditions of SBO simulation. Steam generator PORVs open fraction are controlled base on steam pressure plant data so that pressure in all three steam generators appear the same trend with plant data during the whole simulation. Steam generator auxiliary feedwater flow data are also input as a boundary condition and flow into steam generator via a FILL component connected on the steam generator downcomer, the temperature auxiliary feedwater flow is 293 K. Reactor has shut down for about 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> prior to SBO accident, decay heat within the core has decreased to very low level, therefore reactor power is set constant at 0.6% (about 16.65 MWt) during the simulation. 2.4 The TRACE Results for the SBO Event SBO happens at 16 minutes after the simulation starts. 11 minutes after SBO, turbine driven auxiliary feedwater system (TDAFW) automatically start. Operators control the auxiliary feedwater flow rate via regulating the throttling valve in order to maintain steam generator water level. Due to TDAFW system, steam generators narrow range water level simulation results are above 50% most of the time and show similar trend with plant data. Steam generator narrow range water level results are shown in Figure 2. 12 minutes after SBO, the operators start to initiate emergency operating procedure (EOP) to lower the steam generator pressure by opening steam line PORV. In TRACE, PORVs are controlled base on steam pressure plant data, steam generators pressure simulation results are shown in Figure 3. Steam generator depressurization can effectively remove residual heat from reactor coolant system, therefore coolant temperature and pressure decrease as steam generator pressure become lower. Figure 4 show the cold leg liquid temperature for three RCS loops respectively. Figure 5 shows the reactor coolant system pressure variation. As the RCS coolant temperature decrease, coolant density also becomes smaller which lead to shrinkage of RCS coolant, therefore pressurizer water level decrease. When reactor coolant system pressure become lower than accumulator nitrogen gas pressure which is about 4.2 MPa, water inside accumulator automatically injected into RCS via two check valves. During 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> SBO duration, the operators successfully execute RCS cooling by controlled-depressurization of steam generators. Since no emergency power available during SBO, the turbine driven auxiliary feedwater system become the most important coolant injection system. Reactor temperature and pressure decreased form 564 K, 15.3 MPa to 472 K, 4.2 MPa respectively, and no radioactive material was released during SBO. After emergency power was recovered, residual heat removal system took place to remove the decay heat continuously. From the above results, the TRACE results for SBO accident shows good agreement with the plant data. In addition, the results which are obtained by TRACE V5.0p3 / SNAP V2.2.1 are also shown in the Figure 2~5.

7 Figure 2 Steam Generator #2 Narrow Range Water Level Figure 3 Steam Generator #2 Pressure

8 Figure 4 Cold Leg #2 Liquid Temperature Figure 5 Reactor Coolant System Pressure

9 3 DESCRIPTION OF MODELING METHOD FOR ELAP EVENT WITH URG AND FLEXTo determine the severity of ELAP event and the mitigation capability of URG and FLEX strategy, this research will run a base case without any mitigation strategy, and four cases with multiple mitigation strategy. All the cases are in a situation of ELAP event. The scenario and assumptions of ELAP event in this study were referred to the WCAP-17601-P report. 3.1 Base C ase (no mitigation strategy, Case 0) In base case (Case 0), we assumed an earthquake occurred at 1 minute which resulted in the reactor scram, MSIV closure, turbine trip, feedwater trip, and RCP seal leakage. Table 3 shows the sequence of the base case.

Seal begins to leak at a rate of 5gpm per loop at th e moment and rises up to 21gpm per loop after 14 minute due to the flashing across seal face. After two hours, there is a control depressurization activated on the secondary side to maintain SG pressure at about 300 psia. In this case, the TDAFP and accumulator are assumed to be available at all times. 3.2 Mitigation trategy with URG or FLEX (Ca se 1~4) The main difference between URG and FLEX is that FLEX owing to the FSG (FLEX Support Guideline) high pressure injection equipment, there is no need to perform emergency depressurization. The URG w as simulated in Case 1 and 2. The FLEX w as simulated in Case 3 and 4. The sequence of each case is listed on Tabl e 4. In case s with multipl e mitigatio n strategy, unlike base case, we assume th at seal begins to leak at a rate of 21gpm p er loop as earthquake occurred at 1 minute. Control depressurization will also be activ ated at the moment. In Case 1 and 2, each case will follow URG strategy while the ELAP event l asts for more than 8 and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Otherwi se, i n Case 3 and 4, we assum e that the plant ha s FSG hig h pressure injection equipment. Each case will follow FLEX strategy once ELAP event lasts for more than 8 and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Table 3 The Se quence of Ba se Ca se *The TDAFP and accumulator is available.Event (Base case)

Time(min) Start of simulation 0 The SBO, reactor scram, turbine trip, MSIV closure, RCP trip, feedwater trip, and seal leakage occur.

Seal leakage rate is 5 gpm/loop 1 Seal leakage rate rise up to 21 gpm/loop 14 Control depressurization, SG pressure depressurize to 21 kg/cm² (300 psi a) 120 End of simulation

10 Table 4 The Se quences of Ca se 1~4 Event Time (min) Case 1 Case 2 Case 3 Case 4 Start of simulation 0 The SBO, reactor scram, turbine trip, MSIV closure , RCP trip, feedwater trip, and seal leakage occur TDAFP on Seal leakage rate is 21 gpm/loop Control depressurization, SG pressure depressurize to 21 kg/cm² (300 psi a) 1 Emergency depressurization, SG pressure depressurize to 3 kg/cm² 480(8hr) 1440(24hr) x x TDAFP off Fire pump 800 gpm (35.704 Kg/s) to SG Hydro-Test pump 25 gpm (1.14 Kg/s ) to RPV 480(8hr) 1440(24hr) x x TDAFP off FSG pump 215 gpm(9.595 Kg/s) to SG FSG pump 40 gpm (1.79 Kg/s) to RPV x x 480(8hr) 1440(24hr)

End of simulation 4800(80hr)

11 4 RESULTS 4.1 The Results of C ase 0 Figure 6~11 present the TRACE analysis results for Case 0. In this case, the SBO occurred at 1 minute. Then, the reactor scram and control depressurization occurred which caused the SG and RCS pressures to decrease (see Fig. 6). The SG water level kept at full water level since TDAFP was available (see Fig. 7). In base case, without any mitigation measure, RCS water level dropped down below TAF at 61.89hr because of the seal leakage (see Fig.

8). It should be noticed that once RCS water level dropped down to the elevation of seal break (7.92m), there would be an oscillation on seal leakage rate since there were no coolant but steam still leak out from seal at the moment (shown in Fig. 9). Fig. 10 shows the water level of the accumulator. The accumulator started to inject water at about 3.6 hr. The PCT started to increase after the RCS water level lower than TAF (shown in Fig. 11).

Figure 6 RCS and SG Pressure of Case 0 12 Figure 7 SG Water Level of Case 0 Figure 8 RCS Water Level of Case 0 13 Figure 9 Seal Leakage Rate of Case 0 Figure 10 ACC Water Level of Case 0 14 Figure 11 Peak Cladding Temperature of Case 0 4.2 The Results of C ase 1 Figure 12~

17 illustrate the TRACE analysis results for Case 1. The URG was simulated in Case 1. Therefore, the control and emergency depressurizations were performed in this case. In addition, the water injection of fire and Hydro-Test pumps (at 8 hr, see Table 4) were performed in this case. In this case, the SBO occurred at 1 minute first. Subsequently , the reactor scram and control depressurization occurred which resulted in the RCS and SG pressures dropping (see Fig.

12). The RCS and SG pressures decreased again due to the emergency depressurization after 8 hr. The SG water level kept at full water level since TDAFP was available (see Fig.

13) during 0 minute~8 hr. After 8hr, the fire pump injected water to SGs and Hydro-Test pump injected water to RPV. Therefore, the SG water level still kept at full water level and RCS water level increased after 8 hr (shown in Fig. 13 and 14). The seal leakage rate result is shown in Fig. 15. The RCS pressure affects the seal leakage rate. Fig. 16 shows the water level of the accumulator. The accumulator started to inject water at about 0.2 hr. The PCT is always under 1088.7 K because the RCS water level is above the TAF (see Fig. 17).

15 Figure 12 RCS and SG Pressure of Case 1 Figure 13 SG Water Level of Case 1 16 Figure 14 RCS Water Level of Case 1 Figure 15 Seal Leakage Rate of Case 1 17 Figure 16 ACC Water Level of Case 1 Figure 17 Peak Cladding Temperature of Case 1 18 4.3 The Results of C ase 2 Figure 18~23 show the TRACE analysis results for Case 2. The URG was simulated in Case 2.Hence , the control and emergency depressurizations were performed in this case. Inaddition, the water injection of fire and Hydro-Test pumps (at 24 hr, see Table 4) wereperformed in this case. In this case, the SBO occurred at 1 minute first.

Then , the reactorscram and control depressurization occurred which resulted in the RCS and SG pressuresdecrease (see Fig. 18). The RCS and SG pressures went down again due to the emergencydepressurization after 24 hr. The SG water level kept at full water level since TDAFP wasavailable (see Fig. 19) during 0 minute~

24 hr. After 24hr, the fire pump injected water to SG s and Hydro-Test pump injected water to RPV. Therefore, the SG water level still kept at fullwater level and RCS water level increased after 24 hr (shown in Fig. 19 and 20). The sealleakage rate result is shown in Fig.

21. The RCS pressure affects the seal leakage rate. Fig.

22 presents the water level of the accumulator. The accumulator began to inject water at about 0.2 hr. The PCT is always under 1088.7 K because the RCS water level is above theTAF (see Fig.

23).Figure 18 RCS and SG Pressure of Case 2 19 Figure 19 SG Water Level of Case 2 Figure 20 RCS Water Level of Case 2 20 Figure 21 Seal Leakage Rate of Case 2 Figure 22 ACC Water Level of Case 2 21 Figure 23 Peak Cladding Temperature of Case 2 4.4 The Results of C ase 3 Figure 24~29 present the TRACE analysis results for Case 3. The FLEX was simulated in this case. Therefore, the control depressurization w as performed in this case. In addition, the water injection of FSG pumps (at 8 hr, see Table

4) were also performed in this case. In this case, the SBO occurred at 1 minute first. Subsequently , the reactor scram and control depressurization occurred which caused the RCS and SG pressures to drop (see Fig.

24). The SG water level kept at full water level since TDAFP was available (see Fig.

25) during 0 minute~8 hr. After 8hr, the FSG pump (215 gpm) injected water to SGs and FSG pump (40 gpm) injected water to RPV. Therefore, the SG water level still kept at full water level and RCS water level increased after 8 hr (shown in Fig.

25 and 26). Fig. 27 shows t he seal leakage rate result. The RCS pressure affects the seal leakage rate. Fig.

28 illustrates the water level of the accumulator. The accumulator started to inject water at about 0.2 hr. The PCT is always under 1088.7 K because the RCS water level is above the TAF (see Fig.

29).

22 Figure 24 RCS and SG Pressure of Case 3 Figure 25 SG Water Level of Case 3 23 Figure 26 RCS Water Level of Case 3 Figure 27 Seal Leakage Rate of Case 3 24 Figure 28 ACC Water Level of Case 3 Figure 29 Peak Cladding Temperature of Case 3

25 4.5 The Results of C ase 4 Figure 30~35 illustrate the TRACE analysis results for Case 4. The FLEX was simulated in Case 4. Therefore, the control depressurization w as performed in this case. In addition, the FSG pumps (at 24 hr, see Table 4) were performed in this case. In this case, the SBO occurred at 1 minute first. Then , the reactor scram and control depressurization occurred which resulted in the RCS and SG pressures dropping (see Fig.

30). The SG water level kept at full water level since TDAFP was available (see Fig.

31) before 24 hr. After 24 hr, the FSG pump (215 gpm) injected water to SGs and FSG pump (40 gpm) injected water to RPV. Therefore, the SG water level still kept at full water level and RCS water level increased after 24 hr (see Fig.

31 and 32). The seal leakage rate result is shown in Fig.

33. Fig. 34 depicts the water level of the accumulator. The accumulator began to inject water at about 0.2 hr. The PCT is always lower than 1088.7 K because the RCS water level is above the TAF (see Fig. 35). Figure 30 RCS and SG Pressure of Case 4 26 Figure 31 SG Water Level of Case 4 Figure 32 RCS Water Level of Case 4 27 Figure 33 Seal Leakage Rate of Case 4 Figure 34 ACC Water Level of Case 4 28 Figure 35 Peak Cladding Te mperature of Case 4 According to th e abov e results, it could be found that all 4 case s wit h mitigation strategy in thi s study coul d keep RCS water level above TA F, ensuring the safety function of reactor. Throug h the comparison betwee n Case1~2 and Case 3~4, RCS could cooldown effectively during transient with the action of subsequent depressurization in URG strategy. And the tim e for URG cases which reached the full RCS water level i s earlier than FLEX cases. Additionally, the URG could reduce the seal leakage rate effectively.

29 5 CONCLUSIONS By using TRACE and SNAP codes, this study has developed a method to simulate and analysis the ELAP event for Maanshan NPP. Several conclusions are as follows: Once ELAP event occurred, there were about 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> to prepare multiple means ofpower and water supply to keep Maanshan NPP in a safe condition.The action of two steps depressurization for the URG could reduce the seal leakagerate effectively but still kept RCS water level above TAF.Two-step depressurizations could extend the time available to cope with the lineup of the alternate water.The URG or FLEX can keep RCS water level above TAF for the ELAP event. These results can help the decision making of mitigation strategy for the ELAPaccident.

30 31 6 REFERENCES 1.Taiwan Power Company, Maanshan Nuclear Power Plant Ultimate Response Guideline,No. 1451 (2014).2.NEI, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, NEI 12-06 (2012).3.C. Miller, A. Cabbage, D. Dorman, J. Grobe, G. Holahan and N. Sanfilippo,Recommendations for Enhancing R eactor Safety in the 21st Century (2011)

.4.Institute of Nuclear Power Operations, Near-term Actions to Address the Effect of anExtended Loss of All AC Power in Response to the Fukushima Daiichi Event, INPO IER11-4 (2011).5.U.S. NRC, TRACE V5.840 U M anual (2014).6.J. R. Wang, H. T. Lin, Y. H. Cheng, W. C. Wang and C. Shih, TRACE Modeling and itsVerification using Maanshan PWR Start-up Tests, Annals of Nuclear Energy, Volume 36,Issue 4, pp. 527-536 (2009)

.7.Y. H. Cheng, J. R. Wang, H. T. Lin and C. Shih, Benchmark Calculations of Pressurizer Model for Maanshan Nuclear Power Plant using TRACE Code, Nuclear Engineering andDesign, Volume 239, Issue 11, pp. 2343-2348 (2009)

.8.J. H. Yang, J. R. Wang, H. T. Lin and C. Shih, LBLOCA Analysis for the Maanshan PWRNuclear Power Plant using TRACE, Energy Procedia, Volume 14, pp. 292-297 (2012).9.K. C. Huang, C. Shih and J. R. Wang, Analysis of Maanshan Station Blackout Accident and Ultimate Response Guideline using TRACE Code, National Tsing Hua University (2012).10.PWROG, Reactor Coolant System Response to the Extended Loss of AC Power Event for Westinghouse, Combustion Engineering and Babcock & Wilcox NSSS Designs,WCAP-17601-P (2012).11.H. Esmaili, D. Helton, D. Marksberry, R. Sherry, P. Appignani, D. Dube, M. Tobin, R. Buell,T.Koonce and J. Schroeder, Confirmatory Thermal-Hydraulic Analysis to Support SpecificSuccess Criteria in the Standardized Plant Analysis Risk Models - Surry and PeachBottom, NUREG-1953 (2011)

.