MONTHYEARML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0240, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link NL-24-0237, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0166, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0157, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0144, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers IR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. IR 05000321/20233012024-01-17017 January 2024 – NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 2024-09-09
[Table view] |
Text
Southern Nuclear Operating Company, Inc. Post Office Box 1295 Birmingham, Alabama 35201 -1 295 August 3, 2007 Docket No.: 50-321 COMPANY Energy to Serve Your Worldsu U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Unit 1 Response to Request for Additional lnformation Concerning Projected Fluence Values for the Limitina Circumferential Weld Ladies and Gentlemen: Pursuant to your request for additional information of July 6, 2007 Southern Nuclear Operating Company (SNC) hereby provides its response concerning the projected fluence values for the limiting circumferential weld. ISI-ALT-8 (letter NL-07-0270, dated March 8,2007) was submitted to extend the authorization for the elimination of the RPV circumferential shell weld examinations required by ASME Code through the renewed license period of extended operation (PEO) at Plant Hatch-Unit
- 1. NRC's request for additional information and SNC's response are provided in the enclosure to this letter. This letter contains no NRC commitments.
If you have any questions, please advise. B. J. ~eoj~e Manager, Nuclear Licensing
Enclosure:
Restatement of NRC Request for lnformation and SNC Response for Plant Hatch - Unit 1 Concerning Projected Fluence Values for the Limiting Circumferential Weld U. S. Nuclear Regulatory Commission NL-07-1491 Page 2 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, Vice President - Hatch Mr. D. H. Jones, Vice President - Engineering RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Hatch Mr. J. A. Hickey, Senior Resident Inspector - Hatch Edwin I. Hatch Nuclear Plant - Unit 1 Response to Request for Additional lnformation Concerning Projected Fluence Values for the Limiting Circumferential Weld Enclosure Restatement of NRC Request for lnformation and SNC Response for Plant Hatch - Unit 1 Enclosure Restatement of NRC Request for lnformation and SNC Response for Plant Hatch - Unit 1 Concerning Projected Fluence Values for the Limiting Circumferential Weld Restatement of NRC Request for Additional Information Pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) 50.55a(a)(3)(i), Request for Alternative ISI-ALT-8 proposed an alternative to extend the authorization for the elimination of the Reactor Vessel (RV) circumferential shell weld examinations required by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI through the end of the extended period of operation at Hatch 1. In its January 28, 2005 Safety Evaluation Report (SER) for your original relief request on this topic (RR-38), the NRC staff authorized the elimination of these circumferential shell weld examinations only through July 31, 2007. The staff approval of RR-38 for this limited duration was based on a finding that the neutron fluence values used in RR-38 to justify elimination of the RV circumferential weld examinations through the end of the extended period of operation were based on a fluence calculational methodology (RAMA) that had not yet been reviewed and approved by the NRC staff at that time. The use of the RAMA ,fluence methodology was subsequently reviewed and conditionally approved by the NRC in an SER dated May 13, 2005. The conditions for the application of the RAMA fluence methodology to the RV fluence calculations at Hatch 1 have been met. The staff requests that you confirm whether the projected fluence value for the limiting circumferential weld at the end of the extended period of operation at Hatch 1 (i.e., the fluence intended for use as a basis for the current request, ISI- ALT-08) is the same as that reported for Hatch 1 in Enclosure 1 of RR-38 for the period corresponding to 54 effective full power years (EFPY) of facility operation.
If the 54 EFPY fluence for Request ISI-ALT-8 is different than what was originally reported in Enclosure 1 of RR-38 for 54 EFPY, please provide an updated mean RTNDT value for the limiting Hatch 1 circumferential shell weld and compare it to the acceptance criterion for the circumferential weld RTNDT value specified for Combustion Engineering fabricated RVs in Table 2.6-5 of the July 28, 1998, NRC SER for the Boiling Water Reactor Vessel and lnternals Project (BWRVIP)-05 report, "BWR Vessel and lnternals Project, BWR Reactor Pressure Vessel Shell Weld Inspection Recommendations (BWRVIP-05)."
Enclosure Restatement of NRC Request for Information and SNC Response for Plant Hatch - Unit 1 Concerning Projected Fluence Values for the Limiting Circumferential Weld SNC Response for Plant Hatch - Unit 1 The projected fluence value calculated by RAMA for the limiting circumferential weld at the end of the period of extended operation (PEO) at Hatch 1 is higher than that previously reported for Hatch 1 in Enclosure 1 of Relief Request 38 (RR-38). As noted in the request for additional information (RAI), Relief Request RR-38, which used GE fluence methodology, was approved on a limited time basis (through July 2007) pending review and approval by the NRC of the RAMA fluence methodology. ISI-ALT-8 proposed a code alternative to examination of the circumferential welds that would extend through the PEO based on calculations using the RAMA methodology.
As shown in the table below, the fluence at the end of the PEO was previously stated in RR-38 as 0.236 x 10 n/cm2 while the RAMA calculated fluence used in ISI-ALT-8 at the end of the PEO is 0.296 x 10" n/cm2. 'The end of the PEO for Plant Hatch Unit 1 in RR-38 was based on an assumed 90% capacity factor, or 54 EFPY (effective full power years of operation).
For the RAMA calculations, a more detailed evaluation of the capacity factor was performed, which resulted in the end of the PEO being defined at 49.3 EFPY.
For comparison purposes, updated values for the limiting Hatch 1 circumferer~tial shell weld at the end of the PEO and the values specified for Combustion Engineering (CE) fabricated RVs in Table 2.6-5 of the July 28, 1998, NRC SER are shown in the below table. Also included for comparison are the values used as the basis for RR-38. As demonstrated in the table, the increase in projected fluence using the RAMA methodology has resulted in a slight increase in mean RTNDT at the end of the PEO (53.3 vs. 48.5).
However, the Hatch 1 RTNDT is still bounded by the mean RTNDT calculated using either CE(VIP) or CE(CE0G) chemistry data as provided in the 1998 NRC SER for BW RVl P-05.
Group Cu% Ni% CF Fluence (1 0 n/cm2) ARTNDT (OF) RTNDT(U) (OF) Mean RTNDT (OF) P(F/E) NRC P(F/E) BWRVIP CE(VIP) 64 EFPY (Table 2.6-5) 0.13 0.71 151.7 0.40 1 13.2 0 1 13.2 1.99E-4 --- CE(CE0G) 64 EFPY (Table 2.6-5) 0.183 0.704 172.2 0.40 128.5 0 128.5 4.38E-4 --- Hatch 1 End of PEO 54 EFPY (RR-38) (G E) 0.197 0.060 91 .O 0.236 48.5 -1 0 38.5 --- --- Hatch 1 End of PEO 49.3 EFPY (RAMA) 0.197 0.060 91 .O 0.296 53.3 -1 0 43.3 --- ---