Entergy Pre-Filed Hearing Exhibit ENT000381, NL-12-032, Letter from F. Dacimo, Entergy, to NRC, Correction to Previous Response Regarding Unit 1 Buried Piping (Jan. 30 2012)
ML12090A668
Person / Time
Site:  Entergy icon.png
Issue date: 01/30/2012
From:
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
SECY RAS
Shared Package
ML12090A648 List:
References
RAS 22150, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, NL-12-032
Download: ML12090A668 (2)


Text

ENT000381 Submitted:

March 30 , 2012 ---Entergy: Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P,O, Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 NL-12-032 January 30, 2012 Fred Dacimo Vice President Operations License Renewal U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

REFERENCE:

Dear Sir or Madam:

Correction to Previous Response Regarding Unit 1 Buried Piping Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 Docket Nos.50-003, 50-247 and 50-286 License Nos. DPR-5, DPR-26 and DPR-64 1. NRC Letter dated December 30, 2008, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application

-Miscellaneous Items" 2. Entergy letter (NL-09-018)," Reply to Request for Additional Information

-Miscellaneous Items," dated January 27,2009 3. NRC Letter dated May 20, 2009, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application

-Offsite Power, Refueling Cavity, and Unit 2 auxiliary Feedwater Pump Room Fire Event" 4. Entergy letter (NL-09-079)," Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event," dated June 12, 2009 Entergy Nuclear Operations, Inc is providing a correction, as shown in Attachment 1 and Attachment 2, the response provided references 2 and 4 for license renewal application 1 Entergy an to Reference 2 added components to the scope of license renewal for the auxiliary feedwater pump room fire event Reference 4 provided additional information on aging management review results for added components. In these RAI's, the portion of the Unit 1 river water system from the pump discharge to the intertie to Indian Point Unit 2 service water system was added to the scope of license renewal. The components in this portion of the river water system were added the new LRA Table 1 table identified only outdoo r as the a ENT000381 Submitted:

March 30 , 2012 ---Entergy: Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P,O, Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 NL-12-032 January 30, 2012 Fred Dacimo Vice President Operations License Renewal U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

REFERENCE:

Dear Sir or Madam:

Correction to Previous Response Regarding Unit 1 Buried Piping Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 Docket Nos.50-003, 50-247 and 50-286 License Nos. DPR-5, DPR-26 and DPR-64 1. NRC Letter dated December 30, 2008, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application

-Miscellaneous Items" 2. Entergy letter (NL-09-018)," Reply to Request for Additional Information

-Miscellaneous Items," dated January 27,2009 3. NRC Letter dated May 20, 2009, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application

-Offsite Power, Refueling Cavity, and Unit 2 auxiliary Feedwater Pump Room Fire Event" 4. Entergy letter (NL-09-079)," Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event," dated June 12, 2009 Entergy Nuclear Operations, Inc is providing a correction, as shown in Attachment 1 and Attachment 2, the response provided references 2 and 4 for license renewal application 1 Entergy an to Reference 2 added components to the scope of license renewal for the auxiliary feedwater pump room fire event Reference 4 provided additional information on aging management review results for added components. In these RAI's, the portion of the Unit 1 river water system from the pump discharge to the intertie to Indian Point Unit 2 service water system was added to the scope of license renewal. The components in this portion of the river water system were added the new LRA Table 1 table identified only outdoo r as the a is buried and line items of piping and bolting with 3.4.2-5-11-IP2.

Appendix B.1.6 of the license rer water system in the list of systems containing con Tanks Inspection Program. The buried piping in 1 management review had been included and reme established in response to the industry initiative 0 If you have any questions, or require additional in at 914-254-6710.

I declare under penalty of perjury that the foregoil 3Q) 2d 1 :z-