ENT000381 Submitted: March 30, 2012
--- Entergy:
Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P,O, Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 NL-12-032 January 30, 2012 Fred Dacimo Vice President Operations License Renewal U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
REFERENCE:
Dear Sir or Madam:
Correction to Previous Response Regarding Unit 1 Buried Piping Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 Docket Nos.50-003, 50-247 and 50-286 License Nos. DPR-5, DPR-26 and DPR-64
- 1. NRC Letter dated December 30, 2008, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application - Miscellaneous Items"
- 2. Entergy letter (NL-09-018)," Reply to Request for Additional Information - Miscellaneous Items," dated January 27,2009
- 3. NRC Letter dated May 20, 2009, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application - Offsite Power, Refueling Cavity, and Unit 2 auxiliary Feedwater Pump Room Fire Event"
- 4. Entergy letter (NL-09-079)," Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event," dated June 12, 2009 Entergy Nuclear Operations, Inc is providing a correction, as shown in Attachment 1 and,
the response provided references 2 and 4 for license renewal application 1
Entergy an to Reference 2 added components to the scope of license renewal for the auxiliary feedwater pump room fire event Reference 4 provided additional information on aging management review results for added components. In these RAI's, the portion of the Unit 1 river water system from the pump discharge to the intertie to Indian Point Unit 2 service water system was added to the scope of license renewal. The components in this portion of the river water system were added the new LRA Table 1
table identified only outdoor as the a
ENT000381 Submitted: March 30, 2012
--- Entergy:
Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P,O, Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 NL-12-032 January 30, 2012 Fred Dacimo Vice President Operations License Renewal U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
REFERENCE:
Dear Sir or Madam:
Correction to Previous Response Regarding Unit 1 Buried Piping Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 Docket Nos.50-003, 50-247 and 50-286 License Nos. DPR-5, DPR-26 and DPR-64
- 1. NRC Letter dated December 30, 2008, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application - Miscellaneous Items"
- 2. Entergy letter (NL-09-018)," Reply to Request for Additional Information - Miscellaneous Items," dated January 27,2009
- 3. NRC Letter dated May 20, 2009, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application - Offsite Power, Refueling Cavity, and Unit 2 auxiliary Feedwater Pump Room Fire Event"
- 4. Entergy letter (NL-09-079)," Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event," dated June 12, 2009 Entergy Nuclear Operations, Inc is providing a correction, as shown in Attachment 1 and,
the response provided references 2 and 4 for license renewal application 1
Entergy an to Reference 2 added components to the scope of license renewal for the auxiliary feedwater pump room fire event Reference 4 provided additional information on aging management review results for added components. In these RAI's, the portion of the Unit 1 river water system from the pump discharge to the intertie to Indian Point Unit 2 service water system was added to the scope of license renewal. The components in this portion of the river water system were added the new LRA Table 1
table identified only outdoor as the a
is buried and line items of piping and bolting with 3.4.2-5-11-IP2. Appendix B.1.6 of the license rer water system in the list of systems containing con Tanks Inspection Program. The buried piping in 1 management review had been included and reme established in response to the industry initiative 0 If you have any questions, or require additional in at 914-254-6710.
I declare under penalty of perjury that the foregoil
- rc..~\\.tt\\.,,'n 3Q ) 2d 1 :z-