ML18046B084
From kanterella
Revision as of 14:49, 14 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML18046B084 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 07/31/1981 |
From: | HUGHES L D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | |
Shared Package | |
ML18046B079 | List: |
References | |
ENGRES-CL1-LDH1, ENGRES-CL1-LDH17, NUDOCS 8111230525 | |
Download: ML18046B084 (30) | |
Similar Documents at Palisades | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18066A6641999-09-30030 September 1999
[Table view]Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18066A1841998-06-10010 June 1998 Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period. ML18068A3451998-04-29029 April 1998 Rev 9 to EI-9, Offsite Radiological Monitoring. ML18068A3441998-04-28028 April 1998 Rev 3 to EI-6.6, Gamma E Determination. ML18065B2271998-04-21021 April 1998 Reactor Vessel Neutron Fluence Methodology. ML20217C3101998-03-24024 March 1998 Palisades,Review of Actual Fluence Determination ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18065B2021998-03-10010 March 1998 Rev 7 to Relocated TS Per GL 89-09. ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML20197G3851997-12-17017 December 1997 Rev 17 to Palisades Nuclear Plant Suitability,Training & Qualification Plan ML18065B2321997-10-24024 October 1997 Rev 5 to Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18067A5151997-02-11011 February 1997 Rev 5 to Health Physics Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18065B2011996-12-24024 December 1996 Rev 11 to Offsite Dose Calculation Manual. ML18065B0861996-11-27027 November 1996 Corrected Pages 14 & 15 to Rev 18 to EM-09-02, Inservice Testing Program Relief Request Valve Relief Request 20. ML20134P4071996-11-19019 November 1996 Suitability,Training & Qualification Plan, Rev 16 ML20137G3871996-10-29029 October 1996 Rev 6 to Relocated TS Per NRC GL 89-09 ML18065B0331996-10-25025 October 1996 Proposed Tech Specs Change Request,Revising Administrative Controls Sections of Plant TS ML18065B0171996-10-18018 October 1996 Proposed Tech Specs,Providing Info Necessary for Completion of Review & Approval Process Re Writting Commitment Be Made That Description of Palisades Operating Requirements Manual Will Be Added to FSAR ML18065A9551996-10-0202 October 1996 Proposed Tech Specs 4.6.1 Re Safety Injection sys,4.6.2 Re Containment Spray sys,4.6.3 Re Pumps & 4.6.4 Re Valves ML18065A9111996-09-0404 September 1996 Proposed Tech Specs 3.7, Electrical Power Systems. ML20117K9581996-09-0303 September 1996 Proposed Tech Specs,Revising Administrative Control & Resolution of NRC Comments ML18065A8631996-08-14014 August 1996 Proposed TS Table 4.3.2 Re Miscellaneous Surveillance Items ML18065A7661996-06-10010 June 1996 Expired Temporary Change O-96-044 to Rev 17 to SOP-17A, Clean Radwaste Sys. ML18065A7651996-06-10010 June 1996 Cancelled Tcn O-96-045 to Rev 17 to SOP-17B, Dirty Radwaste Sys. ML18065A5861996-03-29029 March 1996 Proposed Tech Specs,Upgrading Plant TS & Bases to Emulate STS for Combustion Engineering Plants,NUREG-1432,Rev 1 ML18065A8021996-02-21021 February 1996 Rev 2 to EM-09-13, ISI Pressure Testing Program. ML20137G3631996-02-16016 February 1996 Rev 10 to Offsite Dose Calculation Manual 1999-09-30 Category:TEST REPORT MONTHYEARML18066A1841998-06-10010 June 1998
[Table view]Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period. ML20217C3101998-03-24024 March 1998 Palisades,Review of Actual Fluence Determination ML18059B0641994-06-13013 June 1994 Simulator Four-Yr Test Rept & Schedule for Performance Testing for Next Four-Yr Period. ML18057A9241991-02-28028 February 1991 Reactor Containment Bldg Integrated Leak Rate Test, Feb 1991,Special Rept. ML18054A5321989-02-0303 February 1989 Reactor Containment Bldg Integrated Leak Rate Test,Nov 1988, Special Rept 13 ML18054A5521989-01-31031 January 1989 Cycle 8 Startup Physics Test Rept. W/890217 Ltr ML18052A3971986-04-30030 April 1986 Special Rept 12, Reactor Containment Bldg Integrated Leak Rate Test,Jan 1986. ML18051B2811984-12-31031 December 1984 Reactor Internals Noise Monitoring Tests. ML18051B2331984-12-31031 December 1984 Suppl to Physics Testing Rept for Cycle 6 Startup. ML18051B1031984-10-31031 October 1984 Physics Testing Rept for Cycle 6 Startup. ML18051A7921983-12-31031 December 1983 Reactor Internals Noise Monitoring Tests, 1983 ML18051A3021983-01-31031 January 1983 Reactor Internals Noise Monitoring Test, 1982 ML18047A4351982-07-31031 July 1982 Generator Tube Leak Outage Rept of Eddy Current Results. ML18047A3521982-05-31031 May 1982 Epri/Marshall Electric Motor Operated Valve (Block Valve), Interim Test Data Rept. ML18047A4611982-04-30030 April 1982 EPRI PWR Safety & Relief Valve Test Program:Safety & Relief Valve Test Rept, Interim Rept ML18047A2921982-04-14014 April 1982 Physics Testing Rept for Cycle 5 Start-up. ML18047A3531982-03-31031 March 1982 EPRI Summary Rept:Westinghouse Gate Valve Closure Testing Program, Revision 1 ML18046B3741982-02-28028 February 1982 Reactor Containment Bldg Integrated Leakage Rate Test. ML18046B3271982-02-24024 February 1982 Reactor Internals Noise Monitoring Tests,Jan-Dec 1981. ML18046B1591981-12-15015 December 1981 Lab Rept,Battery Section,Ieee 323 Qualification. ML18046B2061981-12-11011 December 1981 Control Rod Drive Mechanism Dynamic Analysis Rept. Info Re Seismic Analysis of Reactor Internals,Diesel Generator Fuel Oil Day Tanks,Essential Water Svc Pumps Safety Injection Tank & Reactor Coolant Pump Also Encl ML18046B0801981-10-31031 October 1981 Containment Bldg Post-Accident Sys 10-Yr Surveillance Rept. ML18046B0841981-07-31031 July 1981 Sheathing Filler Rept. ML18046A8531981-07-0606 July 1981 Control Rod Drive Mechanism Dynamic Analysis Rept. ML18045A5481980-07-31031 July 1980 Physics Testing Rept for Core 4 Startup. ML18045A2931980-07-0101 July 1980 Rept on Endurance Testing of Auxiliary Feedwater Pumps. ML18044A5391980-02-11011 February 1980 Results of Insp & Testing Program in Response to IE Bulletin 79-02 & Revisions (for Interim Plant Operations) for CPC Facility in South Haven,Mi, Revision 0 ML19296B0471980-02-0808 February 1980 RCS Asymmetric Loads Evaluation Program;Interim Rept. ML18044A5401980-01-31031 January 1980 Results & Evaluation of Tests on Phillips Red Head Self- Drilling Expansion Anchors for CPC Facility in South Haven, Mi. ML18045A2221979-11-30030 November 1979 Reactor Internals Noise Monitoring Tests Nov 1978-Nov 1979. ML18044A3781979-02-28028 February 1979 Rept of Seismic Vibration Testing of Various Electrical Items for B&W Under Purchase Order 033788LG. ML18043A4901979-01-31031 January 1979 Reactor Internals Noise Monitoring Tests for Period Apr- Oct 1978 (First 6 Full Months of Core 3) ML18044A3431970-11-30030 November 1970 Containment Bldg Structural Integrity Test. ML18044A3441970-10-0505 October 1970 Deformation Measurements During Containment Pressure Test. 1998-06-10 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML18046B084&oldid=1198146"