ML18046B078

From kanterella
Jump to navigation Jump to search
Forwards Containment Bldg Post-Accident Sys 10-Yr Surveillance Rept & Surveillance Procedure 12447-006-TSFT- 2(Q),Revision 4, Ten-Yr Tendon Surveillance & Palisades Nuclear Plant Sheathing Filler Rept
ML18046B078
Person / Time
Site: Palisades 
Issue date: 11/17/1981
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML18046B079 List:
References
NUDOCS 8111230488
Download: ML18046B078 (1)


Text

consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Ml 49201 * (517) '788-0550 November 17, 1981 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief Operating Reactors Branch No 5 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET. 50-255 - LICENSE DPR PALISADES PLANT - 10 YEAR TENDON SURVEILLANCE REPORT Attached is the report for Palisades Ten (10) Year Tendon Surveillance.

This report is in compliance with Palisades Technical Specification 4.5.4 (Surveillance for Prestressing Systems) which requires a final report on tendon surveillance to be submitted within 90 days of completion of testing.

The final lab report in conjunction with this surveillance was received August 19, 1981 resulting in a Novemb!=r 17, 1981 due date for the final report.

Brian D Johnson Senior Licensing Engineer CC JGKeppler, USNRC NRC Resident Inspector - Palisades

  • Attachm!=nt 1

\\

~I s

1/lfo