Letter to Mr. Richard Denning from Johnny Eads Initial Examination Report No. 50-150/OL-06-01, Ohio State University
ML062000155
Person / Time
Site: Ohio State University
Issue date: 07/24/2006
From: Johnny H. Eads
NRC/NRR/ADRA/DPR/PRTB
To: Denning R
Ohio State University
Doyle P, NRC/NRR/DPR/PRT, 415-1058
Shared Package
ML060410645 List:
References
50-150/OL-06-001
Download: ML062000155 (32)


Text

July 24, 2006 Mr. Richard Denning, Interim Director Nuclear Reactor Laboratory

Ohio State University

Suite 255 650 Ackerman Road

Columbus, OH 43202

SUBJECT:

INITIAL EXAMINATION REPORT NO. 50-150/OL-06-01, OHIO STATE UNIVERSITY

Dear Mr. Denning:

During the week of May 22, 2006, the NRC administered an operator licensing examination at your Ohio State University Reactor. The examination was conducted according to NUREG-1478, "Non-Power Reactor Operator Licensing Ex aminer Standards," Revision 1. Examination questions and preliminary findings were discussed with those members of your staff identified in

the enclosed report at the conclusion of the examination.

In accordance with 10 CFR 2.390 of the Commission's regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Re cords (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS

). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be

released publicly. Should you have any questions concerning this examination, please contact Mr. Paul V. Doyle Jr. at (301) 415-1058 or via internet e-mail pvd@nrc.gov.

Sincerely, /RA/Johnny Eads, Chief Research and Test Reactors Branch B

Division of Policy and Rulemaking

Office of Nuclear Reactor Regulation Docket No. 50-150

Enclosures:

1. Initial Examination Report No. 50-150/OL-06-01
2. Facility comments with NRC resolution
3. Examination and answer key (RO/SRO) cc w/encls:

Please see next page July 24, 2006 Mr. Richard Denning, Interim Director Nuclear Reactor Laboratory

Ohio State University

Suite 255 650 Ackerman Road

Columbus, OH 43202

SUBJECT:

INITIAL EXAMINATION REPORT NO. 50-150/OL-06-01, OHIO STATE UNIVERSITY

Dear Mr. Denning:

During the week of May 22, 2006, the NRC administered an operator licensing examination at your Ohio State University Reactor. The examination was conducted according to NUREG-1478, "Non-Power Reactor Operator Licensing Ex aminer Standards," Revision 1. Examination questions and preliminary findings were discussed with those members of your staff identified in

the enclosed report at the conclusion of the examination.

In accordance with 10 CFR 2.390 of the Commission's regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Re cords (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS

). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be

released publicly. Should you have any questions concerning this examination, please contact Mr. Paul V. Doyle Jr. at (301) 415-1058 or via internet e-mail pvd@nrc.gov.

Sincerely, /RA/Johnny Eads, Chief Research and Test Reactors Branch B

Division of Policy and Rulemaking

Office of Nuclear Reactor Regulation Docket No. 50-150

Enclosures:

1. Initial Examination Report No. 50-150/OL-06-01
2. Facility comments with NRC resolution
3. Examination and answer key cc w/encls:

Please see next page DISTRIBUTION w/ encls.:PUBLIC PRTB r/fJEads DHughesFacility File (EBarnhill) O-6 F-2ADAMS ACCESSION #: ML062000155TEMPLATE #:NRR-074OFFICEPRTB:CE IOLB:LAPRTB:BCNAMEPDoyle:tls*EBarnhill*JEads:tls*DATE07/13/2006 07/19/2006 07/24/2006 OFFICIAL RECORD COPY Ohio State UniversityDocket No. 50-150 cc:

Andrew Kauffman Associate Director

Nuclear Reactor Laboratory

The Ohio State University

1298 Kinnear Road

Columbus, OH 43212 Ohio Department of Health ATTN: Radiological Health Program Director P.O. Box 118

Columbus, OH 43216 Ohio Environmental Protection Agency ATTN: Zach Clayton

Division of Emergency and Remedial Response

P.O. Box 1049

Columbus, OH 43216 Kevin Herminghuysen Research Associate

Nuclear Reactor Laboratory

The Ohio State University

1298 Kinnear Road

Columbus, OH 43212 Richard Denning Director Nuclear Reactor Laboratory

The Ohio State University

1298 Kinnear Road

Columbus, OH 43212 William A. "Bud" Baeslack III Dean, College of Engineering

The Ohio State University

142 Hitchcock Hall

2070 Neil Ave.

Columbus, Ohio 43210-1278 Test, Research, and Training Reactor Newsletter

University of Florida

202 Nuclear Sciences Center

Gainesville, FL 32611 U. S. NUCLEAR REGULATORY COMMISSIONOPERATOR LICENSING INITIAL EXAMINATION REPORTREPORT NO.:50-150/OL-06-1FACILITY DOCKET NO.:50-150 FACILITY LICENSE NO.:R-75 FACILITY:Ohio State University EXAMINATION DATES:May 23, 2006 SUBMITTED BY:

/RA/____________________________ 7/13/2006Paul V. Doyle Jr., Chief ExaminerDate

SUMMARY

On May 23, 2006, the NRC administered an Operator Licensing Examination to a Senior Reactor Operator license candidate at Ohio State University. The candidate passes all

applicable portions of the examination.

REPORT DETAILS1.Examiner: Paul V. Doyle Jr., Chief Examiner2.Results:RO PASS/FAILSRO PASS/FAILTOTAL PASS/FAILWritten0/01/01/0Operating Tests0/01/01/0 Overall0/01/01/03.Exit Meeting:

Paul V. Doyle Jr., NRC, Examiner

Andrew Kauffman, Ohio State University, Reactor Manager During the exit meeting the examiner t hanked Mr. Kauffman for his support of the examinations. Examination comments are included in attachment 2 to this report.

ENCLOSURE 1 Comments on SRO License Exam for Kevin Herminghuysen Proctored on 05-23-2006 OSU Nuclear Reactor Lab - Docket # 50-150 Section AA.4The answer key calculates shutdown margin with the most reactive rod and the reg rodwithdrawn. Prior to administering the exam, the examiner verbally indicated that he wanted theapplicant to calculate the "actual" shutdown margin. Therefore, the correct answer should be "b"

(6.48%) instead of the answer given in the key (3.80%).A.14The figure drawn for this question appears to have been lettered backwards relative to theanswers given in the key (i.e. lettered A to E from top-to-bottom instead of bottom-to-top). Based

on the figure provided (shown below), the correct answers for parts b through d should be:b.2 (C - A) c.1 (B - A) d.5 (E - C)

Section BB.1Our Technical Specifications define a channel check as a qualitative verification of acceptable performance, including comparison to other channels, where possible. A

channel test is defined as the introduction of a signal into the channel for verification that

it is operable. The terms "Check" and "Test" appear to be switched in the answer key for

parts a, b and d.a.The stated action (placing a source near a detector, noting meter movement and alarm function) meets the definition of a channel test.b.The stated action (comparing all NI channels, ensuring they track together) meets the definition of a channel check.d.Comparing the channel reading to an expected value (-80 sec) rises above the level of a check and may be considered a channel test. (In this case, the signal

is introduced by the reactor.)B.3Based on Administrative Procedure AP-02, the answer to part "c" is SROW and the answer to part "d" is SRO. The answer key is ambiguous because it lists two answers

for part "c" and none for part "d".B.7We don't believe there is a correct answer to this question. The answer key selects "a", but there is no such Tech Spec requirement for our reactor.B.9Part "b" specifies an "aluminum clad stainless steel can". Because boration was not mentioned, the candidate correctly chose the answer of Reg Rod, the same as shown in

the answer key. However, we wanted to provide feedback for your future use that our

Reg Rod has no aluminum cladding.B.11The answers are given in units of dose rate, not dose. This did not affect the candidate's answer, but we wanted to provide feedback for your future use.

Section CC.1There is a slow scram associated with the linear level recorder. A slow scram occurswhenever power exceeds 120% of the selected scale, so "Slow" should be an acceptable

answer for "d".C.10The referenced figure is missing. Based on Figure 3.22 in the SAR, the correct answershould be "c" (go to the lead shielded receiving station). This figure in the SAR does not show that the blower pulls air through the solenoid cabinet (it does not blow it through).

Given this behavior, de-energized solenoids will result in the carrier return to the shielded

receiving station.C.12Primary pump flow is governed by the speed of the primary pump motor. Therefore, thecorrect answer is "a". The examiner's answer of "d" is correct with respect to what is stated in the SAR. However, the old primary pump was replaced with a variable-speed pump. The SAR's list of errata mentions the pump replacement, but does not give specifics about the

new system.C.14Based on Attachment C to Procedure OM-11, the following answers should be given: a.Down switch - not numbered on figure b.Drive motor - 3 c.Position indicator - 1 d.Up switch - 6 NRC Resolution: All comments accepted as written.

OPERATOR LICENSING EXAMINATION With Answer Key OHIO STATE UNIVERSITY May 23, 2006 Section A:

L Theory, Thermodynamics & Facility Operating CharacteristicsPage 1QUESTIONA.01[1.0 point]

Which ONE of the following describes the characteristics of good moderators and reflectors?a.High scattering cross-section and low absorption cross-section.

b.Low scattering cross-section and high absorption cross-section.

c.Low scattering cross-section and low absorption cross-section.

d.High scattering cross-section and high absorption cross-section.A.01a REF:xQUESTIONA.02[1.0 point]You enter the control room and note that all nuclear instrumentation show a steady neutron level, and no rods are in motion. Which ONE of the following conditions CANNOT be true?a.The reactor is critical.

b.The reactor is subcritical.

c.The reactor is supercritical.

d.The neutron source has been removed from the core.A.02c REF:QUESTIONA.03[2.0 points, 1/2 each]A fissile material is one which will fission upon the absorption of a THERMAL neutron. A fertile material is onewhich upon absorption of a neutron becomes a fissile material. Identify each of the listed isotopes as either fissile or fertile.a.Th 232b.U 233c.U 235d.Pu 239A.03a, fertile;b, fissile;c, fissile;d, fissile REF:

Section A:

L Theory, Thermodynamics & Facility Operating CharacteristicsPage 2QUESTIONA.04[1.0 point]A reactor is xenon free, with no experiments in the core. Given the following reactivity worths, calculate the

Shutdown Margin.

worth worth

%K/K%K/KShim-Safety Blade #1:2.41Shim-Safety Blade #2:2.32 Shim-Safety Blade #3:2.49Shim-Safety Blade #4:2.60 Regulating rod:0.084Excess Reactivity:3.42a.9.90%

b.6.48%

c6.40%

d.3.80%A.04db Question clarified by examiner during administration on purpose requiring an answer change.

  • REF:SDM (cold/clean) = Total Rod worth - Kexcess - Most reactive blade - Reg Rod SDM = (2.41 + 2.32 + 2.49 + 2.60 + 0.084) - 3.42 - 2.60 - 0.084 = 3.80%QUESTIONA.05[1.0 point]The reactor is operating at 100 KW. The reactor operator withdraws the Regulating Rod allowing power toincrease. The operator then inserts the same rod to its original position, decreasing power. In comparison

to the rod withdrawal, the period due to the rod insertion will be -a.longer due to long lived delayed neutron precursors.

b.shorter due to long lived delayed neutron precursors.

c.same due to equal amounts of reactivity being added.

d.same due to equal reactivity rates from the rod.A.05a REF:QUESTIONA.06[1.0 point]Which of the following power manipulations would take the longest to complete assuming the same period is maintained?a.1 Kilowatt: from 1 kW to 2 kW b.1.5 Kilowatts: from 2 kW to 3.5 kW c.2 Kilowatts: from 3.5 kW to 5.5 kW d.2.5 Kilowatts: from 5.5 kW to 8 kWA.06a REF:P = P 0 e t/T Section A:

L Theory, Thermodynamics & Facility Operating CharacteristicsPage 3QUESTIONA.07[1.0 point]After shutdown, the reactor will stabilize at a -80 second period. Which ONE of the following is the main contributor to this period?a.The amount of negative reactivity introduced to the core.

b.The decay constant of the longest lived delayed neutron precursor.

c.The degree of neutron absorption by the fission products in the core.

d.The level of the prompt neutron population.A.07b REF:QUESTIONA.08[1.0 point]Suppose the source strength in the core is 250 neutrons per second (N/sec) and the effective multiplication factor is 0.80. Select the closest stable neutron count rate from the list below:a.313 N/sec b.750 N/sec c.1250 N/sec d.1500 N/secA.08c REF:Count = S/(1 - Keff) = 250/(1 - 0.8) = 250/0.2 = 1250QUESTIONA.09[1.0 point]What is the approximate amount of time that it will take the amount of Xenon being produced to reach a peakafter the reactor is shut down? On the attached Xenon r eactivity curve it is not ed as the difference between time T SD and T Peak.a.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> b.15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> c.24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> d.33 hour3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br />sA.09b REF:QUESTIONA.10[1.0 point]

During a fuel loading of the core, as the reac tor approaches criticality, the value of 1/M:a.Increases toward one b.Decreases toward one c.Increases toward infinity d.Decreases toward zeroA.10d REF:

Section A:

L Theory, Thermodynamics & Facility Operating CharacteristicsPage 4QUESTIONA.11[1.0 point]The reactor supervisor tells you that the Keff for the reactor is 0.955. How much reactivity must you add to the reactor to reach criticality?a.+0.0471 b.+0.0450 c.-0.0471 d.-0.0450A.11a REF:= (Keff1 - Keff2) ÷ (Keff1

  • Keff2) = (0.9550 - 1.0000) ÷ (0.9550
  • 1.0000) = -0.0450 ÷ 0.9550 = -0.0471QUESTIONA.12[2.0 points, 1/2 each]

Match each term in column A with the correct definition in column B.

Column A Column Ba.Prompt Neutron1.A neutron in equilibrium with its surroundings.

b.Fast Neutron2.A neutron born directly from fission.

c.Thermal Neutron 3.A neutron born due to decay of a fission product.

d.Delayed Neutron4.A neutron at an energy level greater than its surroundings.A.12a, 2; b, 4; c, 1; d, 3

REF:QUESTIONA.13[1.0 point]

INELASTIC scattering is the process by which a neutron collides with a nucleus and -a.recoils with the same kinetic energy it had prior to the collision b.recoils with a lower kinetic energy than it had prior to the collision, with the nucleus emitting a gamma ray.

c.Is absorbed, with the nucleus emitting a gamma ray.

d.recoils with a higher kinetic energy than it had prior to the collision, with the nucleus emitting a gamma ray.A.13b REF:

Section A:

L Theory, Thermodynamics & Facility Operating CharacteristicsPage 5QUESTIONA.14[2.0 points, 1/2 each]Using the drawing of the Integral Rod Worth Curve provided, identify each of the following reactivity worths.a.Total Rod Worth1.B - A b.Actual Shutdown Margin2.C - A c.Technical Specification Shutdown Margin Limit3.C - B d.Excess Reactivity4.D - C5.E - C 6.E - D 7.E - AA.14a, 7;b, 52;c, 61;d, 25 Answers changed per facility comment.

  • REF:QUESTIONA.15[1.0 point]

What is the kinetic energy range of a thermal neutron?a.> 1 MeV b.100 KeV - 1 MeV c.1 eV - 100 KeV d.< 1 eVA.15d REF:QUESTIONA.16[1.0 point]A thin foil target of 10% copper and 90% aluminum is in a thermal neutron beam. Given a Cu = 3.79 barns,a Al = 0.23 barns, s Cu = 7.90 barns, and s Al =1.49 barns, which ONE of the following reactions has thehighest probability of occurring? A neutron -a.scattering reaction with aluminum b.scattering reaction with copper c.absorption in aluminum d.absorption in copperA.16a REF:

Section A:

L Theory, Thermodynamics & Facility Operating CharacteristicsPage 6QUESTIONA.17[1.0 point]When performing rod calibrations, many facilities pull the rod out a given increment, then measure the time for reactor power to double (doubling time), then calculate the reactor period. If the doubling time is 42 seconds, what is the reactor period?a.29 sec b.42 sec c.61 sec d.84 secA.17c REF:ln (2) = -time/ = time/(ln(2)) = 60.59 61 seconds Section B Normal, Emergency and Radiological Control Procedures Page 7QUESTIONB.1[2.0 points, 1/2 each]

Identify each of the following actions as either a channel CHECK , a channel TEST , or a channel CAL ibration.a.Prior to startup you place a radioactive source near a radiation detector, noting meter movement and alarm function operation.b.During startup you compare all of your nuclear instrumentation channels ensuring they track together.c.At power, you perform a heat balance (calorimetric) and det ermine you must adjust Nuclear Instrumentation readings.d.During a reactor shutdown you note a -80 second period on Nuclear Instrumentation.B.1a, Check or Test; b, Test Check; c, Cal; d, CheckAnswers changed per facility comment.

  • REF:Technical Specifications § 1.0 DefinitionsQUESTIONB.2[2.0 points, 1/2 each]

Match the type of radiation in column A with its associated Quality Factor (10CFR20) from column B.

Column A Column Ba.alpha1 b.beta2 c.gamma5 d.neutron (unknown energy)10 20B.2a, 20;b, 1;c, 1;d, 10 REF:10CFR20.1004QUESTIONB.3[2.0 points, 1/2 each]Identify the minimum level of permission required for each of the following. Reactor Operator on Duty (RO), Senior ReactorOperator on Duty (SROD), any Senior Reactor Operator (SRO) or written permission from any Senior Reactor Operator (SROW).a.Installation or removal of an experiment from the reactor or an experimental facility, while the reactor is operating.

b.Entering the control room area, you are NOT the Reactor Operator on duty.

c.Bringing pyrotechnic material into the NRL.

d.Transporting corrosive material beyond the chains of either pool.B.3a, RO;b, SROD;c, SRO SROW;c, SROW SRO Answers changed per facility comment

  • REF:Admin Procedures AP-02, General Rules, Section B Normal, Emergency and Radiological Control Procedures Page 8QUESTIONB.4[1.0 point]A survey instrument with a window probe was used to measure an irradiated experiment. The results were 100 millirem/hr window open and 60 millirem/hr window closed. What was the gamma dose?a.100 millirem/hr
b. 60 millirem/hr
c. 40 millirem/hr d.140 millirem/hrB.4b REF:Standard NRC Health Physics QuestionQUESTIONB.5[1.0 point]

Which ONE of the following is the definition of Emergency Action Level

?a.a condition that calls for immediate action, beyond the scope of normal operating procedures, to avoid an accident or to mitigate the consequences of one.b.Specific instrument readings, or observations; radiation dose or dose rates; or specific contamination levelsof airborne, waterborne, or surface-deposited radioactive materials that may be used as thresholds for

establishing emergency classes and initiating appropriate emergency methods.c.classes of accidents grouped by severity level for which predetermined emergency measures should be taken or considered.d.a document that provides the basis for actions to cope with an emergency. It outlines the objectives to be met by the emergency procedures and defines the authority and responsibilities to achieve such objectives.B.5b REF:Emergency Plan, § 2.0 Definitions, p. 6.QUESTIONB.6[2.0 points, 1/2 each]Match the 10CFR55 requirements for maintaining an active operator license in column A with the corresponding

time period from column B.

Column A Column Ba.Renew License1 year b.Medical Exam2 years c.Pass Requalification Written Examination4 years d.Pass Requalification Operating Test6 yearsB.6a, 6;b, 2;c, 2;d, 1 REF:10CFR55.

Section B Normal, Emergency and Radiological Control Procedures Page 9QUESTIONB.7[1.0 point]

Question Deleted per facility comment.

  • Which ONE of the following statements is TRUE with respect to Technical Specifications?a.The neutron source shall be positioned vertically between the grid plate and the top of the fuel elements during startup.b.A minimum of four channels of nuclear instrumentation shall be on scale, providing meaningful information through all power ranges.c.During a critical experiment, subcritical multiplication plots shall be obtained from at least four instrumentation channels.d.The maximum reactivity worth of any single independent experiment shall not exceed 0.5% in reactivity.e.The reactor shall be operated only when all lattice positions internal to the active fuel boundary are occupied by either a standard or control fuel element.B.7aa.Trueb.Falsec.Falsed.False e.FalseREF:Technical Specifications 4.4.1, 5.4, 10.1, 6.2.3, 7.4, also EQBQUESTIONB.8[1.0 point, 1/2 each]

Match the control rod indicating lights for the shim-safety rods with their respective color.

a.Jam1.Green b.Up2.Orange c.Bottom3.Red d.Engage4.White B.8a, 3;b, 2;c, 1;d, 4 REF:Old EQB questionQUESTIONB.9[1.0 point]Identify each of the listed cotrol element attributes as being applicable to either the reg rod (reg) shim-safety rods (SS) or both rods (Both)a.magnet engage light b.aluminum clad stainless steel can*

  • c.borated stainless steel can d.grooved.B.9a, SS;b, reg;c, SS;d, SS REF:OSURR Hazard Summary Report, sec. 1.8.2
  • Correction made for next question use per facility comment.
  • Section B Normal, Emergency and Radiological Control Procedures Page 10QUESTIONB.10[1.0 point]Which ONE of the following operations requires at a minimum a licensed Senior Reactor Operator, a licensed

Reactor Operator and a third person?a.Normal reactor operation.

b.First startup of the day.

c.Startup following an unplanned shutdown.

d.Fuel handlingB.10d REF:OSU AP-13, Personnel Required for Reactor Operations, pgs. 1 and 2QUESTIONB.11[1.0 point]While working in a radiation area, you note that your pocket dosimeter reads off-scale and immediately leave thearea. You had been working for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 8 feet from a source reading 2400 mr/hr at a foot. Which one of the

following is the estimated dose you received?a.600 mr/hrb.300 mr/hrc.75 mr/hrd.371/2 mr/hr

    • B.11cREF:NRC question administered Jan. 1987 D 1 d 1 2 = D 2 d 2 2 (D is Dose rate, d is distance)

D 1 (82) = 2400 (12) D 1 = 2400/64 = 371/2 mr/hr DOSE = Dose Rate x time371/2 mr/hr 2 hr = 75 mr

  • Corrections made for next question use per facility comment.
  • QUESTIONB.12[1.0 point]Consider two point sources, each having the SAME curie strength. Source A's gammas have an energy of 0.5MeV, while Source B's gammas have an energy of 1.0 MeV. Using a Geiger-Müller detector the reading from

source B will be - (NOTE: Ignore detector efficiency.)a.four times that of source A.

b.twice that of source A.

c.the same.

d.half that of source A.B.12c REF:Standard NRC Health Physics Question. G-M detector is not sensitive to incident energy levels.

Section B Normal, Emergency and Radiological Control Procedures Page 11QUESTIONB.13[1.0 point]10CFR50.54(x) states: "A licensee may take reasonable action that departs from a license condition or a technical specification(contained in a license issued under this part) in an emergency when this action is immediately needed to protect the public health and safetyand no action consistent with license conditions and technical specifications that can provide adequate or equivalent protection is immediately apparent."

10CFR50.54(y) states that the minimum level of management which may authorize this action is -a.any Reactor Operator licensed at the facility.

b.any Senior Reactor Operator licensed at the facility.

c.Facility Manager (or equivalent at facility).

d.NRC Project ManagerB.13b REF:10CFR50.54(y).QUESTIONB.14[1.0 point]

Which ONE of the following correctly describes a Safety Limit?a.Limits on important process variables which are found to be necessary to reasonably protect the integrity of certain physical barriers which guard against the uncontrolled release of radioactivity.b.The Lowest functional capability of performance levels of equipment required for safe operation of the facility.

c.Settings for automatic protective devices related to those variables having significant safety functions. d.a measuring or protective channel in the reactor safety system.B.14a REF:Technical Specifications § 1.3 DefinitionsQUESTIONB.15[1.0 point]You place a radiation monitor neat to the demineralizer during reactor operation. If you were to open the window on the detector you would expect the meter reading to -(Assume no piping leaks)a.increase, because you would now be receiving signal due to H 3 and O 16 betas.b.remain the same, because the Quality Factors for gamma and beta radiation are the same.

c.increase, because the Quality Factor for betas is greater than for gammas.

d.remain the same, because you still would not be detecting beta radiation.B.15d REF:BASIC Radiological Concept (Betas don't make it through piping.)

Section B Normal, Emergency and Radiological Control Procedures Page 12QUESTIONB.16[1.0 point]Which ONE of the following is the maximum Keff allowed (per Technical Specifications) for a fuel storage rack fully loaded with fuel and flooded with water?a.0.8 b.0.85 c.0.9 d.0.95B.16c REF:Technical Specification §5.4.

QUESTIONC.1[2.0 points, a each]Designate the system response (Fast Scram (FAST), Slow Scram (SLOW), Alarm Only (ALARM) or Not in Service (NIS)] associated with each of the conditions listed below.a.Low count rate 2 counts/second (Stratup Channel)b.Indicated Dose above setpoint (ARM system detectors) c.Reactor Overpower 120% full scale (Safety Channel 1)d.Reactor Power Above Setpoint (Linear Level Channel) e.High Voltage Failure on CICs or UICs f.Fast reactor period 5 secondsC.01a. SLOWb. ALARMc. FASTd. NIS or SLOW 2 nd answer added per facility comment.

  • e. SLOWf. SLOWREF:OSURR Hazards Summary Report § 3.6.3, Table 3.2 pp. 74 - 76.QUESTIONC.2[1.0 point]Which ONE of the following supplies the primary protection for reactor equipment against disturbances in

the building power supply?a.The auxiliary back-up power system.

b.The input line capacitors.

c.The isolation transformers.

d.The individual circuit power supplies.C.2c REF:SAR §3.3.7QUESTIONC.3[1.0 point]

A leak from which ONE of the following would result in the lowest reactor coolant level?a.Primary cooling pump discharge piping.

b.Rabbit tube rupture.

c.Beam Port #1 rupture.

d.Beam Port #2 rupture.C.3d REF:SAR § 8.4.2.2 Section C Facility and Radiation Monitoring Systems Page 14QUESTIONC.4[1.0 point]

Which ONE of the following is the feature designed to minimize dose due to N 16 at the top of the pool?a.Downward flow of warm water from the core into the coolant piping.

b.Flow through the delay tank in the coolant piping.

c.Balanced suction flow from the plenum cap.

d.Return flow from the process syst em across the pool above the plenum cap.C.4d REF:SAR § 3.2.2.1QUESTIONC.5[1.0 point]During a core loading experiment, you notice that the Start-up Channel monitor is indicating less than 2counts/second. Which ONE of the following actions would be used to allow withdrawal of shim-safety rods?a.Temporarily raise the gain of the start-up count rate amplifier.

b.Manually position the pointer on the start-up count rate channel recorder to greater than 2 count/second.

c.Place the number 1 bypass keylock switch to the ON position.

d.Place the start-up count rate amplifier to the OFF position.C.5c REF:SAR § 3.3.14QUESTIONC.6[1.0 point]

Which ONE of the following detectors is used primarily to measure Ar 41 release to the environment?a.NONE, Ar 41 has too short a half-life to require environmental monitoring.b.Reactor Building Gaseous Effluent Monitor c.Rabbit Blower Effluent Monitor d.Area Monitor above the poolC.6b REF:

Section C Facility and Radiation Monitoring Systems Page 15QUESTIONC.7[1.0 point]

What is the purpose of the small hole in the return leg of the primary coolant loop? The hole providesa.a method for priming the primary pump.

b.a connection for an RTD to perform Reactor Power Calibrations.

c.a swirling motion of the return coolant to reduce N 16 concentrations at the pool surface.d.siphoning protection in the case of a primary loop leak.C.7d REF:SAR § 3.2.2.1QUESTIONC.8[1.0 point]

What is the purpose of the Dash Pot Cylinder in the Shim-Safety Control Rod Assembly?a.To provide indication of the control rod at the top of the core.

b.To provide indication of the control rod at the bottom of the core.

c.To minimize reactivity addition during a rod withdrawal accident.

d.To minimize the mechanical stress of a rod drop.C.8d REF:SAR § 3.1.2.3, p. 33; OM-15 Figure from Attachment C.QUESTIONC.9[1.0 point]Which ONE of the following correctly describes how gamma radiation is compensated for in the Log-N

channel?a.A compensating current equal and opposite to the signal due to gammas is generated by the detector.

b.The detector is positioned in towards and out away from the core to compensate for gammas.

c.The output of the detector is put through a discriminator circuit which passes only pulses caused by neutron interactions.d.Lead shielding around the detector decreases the signal due to gammas low enough such that compensation is not required.C.9a REF:Standard NRC Question Section C Facility and Radiation Monitoring Systems Page 16QUESTIONC.10[1.0 point]While irradiating a sample using the rabbit system, the rabbit control panel fails causing ALL of the solenoidsto reposition to their deenergized positions (the fan remains energized). Using the figure provided, the rabbit

will...a.stay at the reactor core position.

b.go to the intermediate send position.

c.go to the lead shielded receiving station.

d.go to the "T" connection just outside the core.C.10a c Answer changed per facility comment.

  • REF:SAR figure 3.19.QUESTIONC.11[2.0 points, 1/2 each]

Match the radiation detection equipment in column A, with its primary use in column B.

Column A: Radiation Equipment Column B: Primary use a.Ion Chamber portable radiation detector 1.To measure total dose received by a visitor.

b.Geiger-Müller portable radiation detector 2.To detect the presence of contamination.

c.Film Badge/TLD 3.To measure radiation field strength.

d.Pocket Dosimeter.4.To measure total dose received by a radiation worker.C.11a, 3;b, 2;c, 4;d, 1 REF:Standard NRC question.QUESTIONC.12[1.0 point]

Primary Pump flow is adjusted by:a.speed of the centrifugal pump motor.

b.chamber size of the positive displacement pump.

c.level in the delay tank (submergence control of the centrifugal pump).

d.position of the modulating valve upstream of the heat exchanger.C.12d a Answer changed per facility comment.

  • REF:Facility supplied notes on primary system.

Section C Facility and Radiation Monitoring Systems Page 17QUESTIONC.13[1.0 point]

Which ONE of the following is the reason for the surge tank in the secondary system?a.To accommodate changes in pressure in the secondary.

b.To minimize changes in temperature c.To allow addition of chemicals into the secondary system.

d.To allow addition of water to fill the secondary system.C.13a REF:Facility supplied notes on secondary system.QUESTIONC.14[2.0 point]

Using the figure provided, identified each of the components listed.a.Down switch b.Drive motor c.Position indicator transmitter (fine or course) d.Up switchC.14a, 7b, 23c, 1d, 4 6 Answers changed per facility comment.

  • REF:OM-11 attachment C QUESTIONC.15[1.0 point]Due to a weather phenomenon, your Area Radiation Monitors alarm due to off-gas from Davis-Besse. TheReactor Supervisor tells you to silence the alarms. Which ONE of the following is the correct method to

silence the ARM units?a.Place the operate switch at the local unit in the SILENCE position.

b.Raise the setpoint at the remote unit.

c.Increase the deadband setting on the local unit.

d.Reduce the proportional gain setting on the remote unit.C.15b REF:SAR § 3.7.3 Section C Facility and Radiation Monitoring Systems Page 18QUESTIONC.16[1.0 point]

What is the purpose of the small hole in the return leg of the Primary coolant loop? The hole provides -a.a method for priming the pump.

b.a connection for an RTD to perform Reactor Power Calibrations.

c.a swirling motion of the return coolant to reduce N 16 concentrations at the pool surface.d.siphoning projection in the case of a primary loop leak.C.16d REF:SAR § 3.2.2.1QUESTIONC.17[1.0 point]

Which ONE of the recorders listed below does NOT have a Reactor Trip associated with it?a.Linear Power Monitoring Channel Recorder b.Period Monitoring Channel Recorder c.Logarithmic Power (Log-N) Recorder d.Startup Channel RecorderC.17c REF:SAR §§ 3.3.12-3.3.15

U. S. NUCLEAR REGULATORY COMMISSIONNON-POWER INITIAL REACTOR LICENSE EXAMINATION

FACILITY:Ohio State University REACTOR TYPE:Pool DATE ADMINISTERED:2006/05/23 CANDIDATE:

INSTRUCTIONS TO CANDIDATE:Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination.Points for each question are indicated in brackets for each question. A 70% in each section is required to

pass the examination. Examinations will be pick ed up three (3) hours after the examination starts.

% ofCategory% ofCandidatesCategory Value Total Score Value Category 20.00 33.3 A.Reactor Theory, Thermody namics and Facility Operating Characteristics 20.00 33.3 B.Normal and Emergency Operating Procedures and Radiological Controls 20.00 33.3 C.Facility and Radiation Monitoring Systems 60.00

%TOTALS FINAL GRADE All work done on this examination is my ow

n. I have neither given nor received aid.

______________________________________

Candidate's Signature NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this ex amination the following rules apply: 1.Cheating on the examination means an automatic denial of your application and could result in moresevere penalties. 2.After the examination has been completed, you must sign the statement on the cover sheet indicatingthat the work is your own and you have neither received nor given assistance in completing theexamination. This must be done after you complete the examination. 3.Restroom trips are to be limited and only one candidate at a time may leave. You must avoid allcontacts with anyone outside the examination room to avoid even the appearance or possibility of cheating. 4.Use black ink or dark pencil only to facilitate legible reproductions. 5.Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet. 6.Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE. 7.The point value for each question is indi cated in [brackets] after the question. 8.If the intent of a question is unclear, ask questions of the examiner only. 9.When turning in your examination, assemble the completed examination with examination questions,examination aids and answe r sheets. In addition turn in all scrap paper.10.Ensure all information you wish to have evaluated as part of your answer is on your answer sheet.

Scrap paper will be disposed of immediately following the examination.11.To pass the examination you must achieve a gr ade of 70 percent or greater in each category.12.There is a time limit of three (3) hours for completion of the examination.13.When you have completed and turned in you examination, leave the examination area. If you areobserved in this area while the examination is still in progress, your license may be denied or revoked.

EQUATION SHEET 444444444444444444444444444444 444444444444444444444 4444444444444444444444444444444444444444444444 DR - Rem, Ci - curies, E - Mev, R - feet 1 Curie = 3.7 x 10 10 dis/sec1 kg = 2.21 lbm1 Horsepower = 2.54 x 10 3 BTU/hr1 Mw = 3.41 x 10 6 BTU/hr1 BTU = 778 ft-lbf°F = 9/5 °C + 32

1 gal (H 2 O) 8 lbm°C = 5/9 (°F - 32) c P = 1.0 BTU/hr/lbm/°Fc p = 1 cal/sec/gm/°C Section A L Theory, Thermo, and Facility Characteristics Page 22A.1a b c d ___A.11a b c d ___A.2a b c d ___A.12a1 2 3 4 ____

A.3afertile fissile ___A.12b1 2 3 4 ____

A.3bfertile fissile ___A.12c1 2 3 4 ____

A.3cfertile fissile ___A.12d1 2 3 4 ____

A.3dfertile fissile ___A.13a b c d ___

A.4a b c d ___A.14a1 2 3 4 5 6 7 ___

A.5a b c d ___A.14b1 2 3 4 5 6 7 ___

A.6a b c d ___A.14c1 2 3 4 5 6 7 ___

A.7a b c d ___A.14d1 2 3 4 5 6 7 ___

A.8a b c d ___A.15a b c d ___

A.9a b c d ___A.16a b c d ___

A.10a b c d ___A.17a b c d ___

Section B Normal/Emerg. Procedures & Rad Con Page 23B.1aCHECK TEST CAL ___B.6d1 2 4 6 ___B.1bCHECK TEST CAL ___B.7a b c d ___

B.1cCHECK TEST CAL ___B.8a1 2 3 4 ___

B.1dCHECK TEST CAL ___B.8b1 2 3 4 ___

B.2a1 2 5 10 20 ___B.8c1 2 3 4 ___

B.2b1 2 5 10 20 ___B.8d1 2 3 4 ___

B.2c1 2 5 10 20 ___B.9a SS REG BOTH

___B.2d1 2 5 10 20 ___B.9b SS REG BOTH

___B.3a RO SROD SROW ___B.9c SS REG BOTH

___B.3b RO SROD SROW ___B.9d SS REG BOTH

___B.3cRO SROD SROW ___B.10a b c d ___

B.3dRO SROD SROW ___B.11a b c d ___

B.4a b c d ___B.12a b c d ___

B.5a b c d ___B.13a b c d ___

B.6a1 2 4 6 ___B.14a b c d ___

B.6b1 2 4 6 ___B.15a b c d ___

B.6c1 2 4 6 ___B.16a b c d ___

Section C Facility and Radiation Monitoring Systems Page 24 C.1aALARMFASTNISSLOW ___C.10a b c d ___

C.1bALARMFASTNISSLOW ___C.11a1 2 3 4 ___

C.1cALARMFASTNISSLOW ___C.11b1 2 3 4 ___

C.1dALARMFASTNISSLOW ___C.11c1 2 3 4 ___

C.1eALARMFASTNISSLOW ___C.11d1 2 3 4 ___

C.1fALARMFASTNISSLOW ___C.12a b c d ___C.2a b c d ___C.13a b c d ___

C.3a b c d ___C.14a1 2 3 4 5 6 7 ___

C.4a b c d ___C.14b1 2 3 4 5 6 7 ___

C.5a b c d ___C.14c1 2 3 4 5 6 7 ___

C.6a b c d ___C.14d1 2 3 4 5 6 7 ___

C.7a b c d ___C.15a b c d ___

C.8a b c d ___C.16a b c d ___

C.9a b c d ___C.17a b c d ___

Section C Facility and Radiation Monitoring Systems Page 25