ML070100476

From kanterella
Revision as of 05:54, 25 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Issuance of Renewed Facility Operating License No. DPR-20 for Palisades Nuclear Plant
ML070100476
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/17/2007
From: Juan Ayala
NRC/NRR/ADRO/DLR/RLRA
To: Harden P A
Nuclear Management Co
AYALA, JUAN, NRR/DLR/RLRA, 415-4063
Shared Package
ML070100449 List:
References
Download: ML070100476 (5)


Text

January 17, 2007 Mr. Paul A. Harden Site Vice President

Nuclear Management Company, LLC

27780 Blue Star Memorial Highway

Covert, MI 49043

SUBJECT:

ISSUANCE OF RENEWED FACILITY OPERATING LICENSE NO. DPR-20 FOR PALISADES NUCLEAR PLANT

Dear Mr. Harden:

The U.S. Nuclear Regulatory Commission (NRC) has issued Renewed Facility Operating License No. DPR-20 for the Palisades Nuclear Plant (PNP). The renewed facility operating

license has been issued on the basis of our review of your application dated

March 22, 2005, as supplemented by letters submitted to the NRC through July 5, 2006. The

Technical Specifications for PNP were not amended as a result of our review.

The technical basis for issuing the renewed license is set forth in NUREG-1871, "Safety Evaluation Report Related to the License Renewal of the Palisades Nuclear Plant," dated

December 2006. The results of the environmental reviews related to the issuance of the

renewed license are contained in NUREG-1437, Supplement 27, "Generic Environmental

Impact Statement for License Renewal of Nuclear Plants, Supplement 27, Regarding Palisades

Nuclear Plant," dated October 12, 2006.

Renewed Facility Operating License No. DPR-20 expires at midnight, March 24, 2031.

contains Renewed Facility Operating License No. DPR-20 with attachments:

Appendix A - Technical Specifications, and Appendix B - Environmental Protection Plan. is a copy of the Federal Register notice of issuance for the renewed license. The original has been sent to the Office of the Federal Register for publication.

Sincerely,/RA Louise Lund for/

Juan Ayala, Project Manager License Renewal Branch A

Division of License Renewal

Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1. Renewed Facility Operating License No. DPR-20
2. Federal Register notice cc w/encls (w/o Attachments to Renewed Operating License): See next page January 17, 2007 Mr. Paul A. Harden

Site Vice President

Nuclear Management Company, LLC

27780 Blue Star Memorial Highway

Covert, MI 49043

SUBJECT:

ISSUANCE OF RENEWED FACILITY OPERATING LICENSE NO. DPR-20 FOR PALISADES NUCLEAR PLANT

Dear Mr. Harden:

The U.S. Nuclear Regulatory Commission (NRC) has issued Renewed Facility Operating License No. DPR-20 for the Palisades Nuclear Plant (PNP). The renewed facility operating

license has been issued on the basis of our review of your application dated

March 22, 2005, as supplemented by letters submitted to the NRC through July 5, 2006. The

Technical Specifications for PNP were not amended as a result of our review.

The technical basis for issuing the renewed license is set forth in NUREG-1871, "Safety Evaluation Report Related to the License Renewal of the Palisades Nuclear Plant," dated

December 2006. The results of the environmental reviews related to the issuance of the

renewed license are contained in NUREG-1437, Supplement 27, "Generic Environmental

Impact Statement for License Renewal of Nuclear Plants, Supplement 27, Regarding Palisades

Nuclear Plant," dated October 12, 2006.

Renewed Facility Operating License No. DPR-20 expires at midnight, March 24, 2031.

contains Renewed Facility Operating License No. DPR-20 with attachments:

Appendix A - Technical Specifications, and Appendix B - Environmental Protection Plan. is a copy of the Federal Register notice of issuance for the renewed license. The original has been sent to the Office of the Federal Register for publication.

Sincerely,/RA Louise Lund for/

Juan Ayala, Project Manager License Renewal Branch A

Division of License Renewal

Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1. Renewed Facility Operating License No. DPR-20
2. Federal Register notice cc w/encls (w/o Attachments to Renewed Operating License): See next page Distribution: See next page ADAMS Nos: Pkg: ML070100449; Ltr: ML070100476; Encl 1: ML070100469; Encl 2: ML070100463* Concurred via e-mailDocument Name: C:\MyFiles\Copies\Letter to Paul A. Harden.wpdOFFICELA:RLRAPM:RLRATech ED*PM:REBBBC:REBBNAMEYEdmondsJAyalaCBladeyBPhamRFranovichDATE12/20/0612/20/0612/13/0612/27/0612/27/06 OFFICEPM:LPL3(A)BC:LPL3OGCBC:RLRA(A)D:DLR NAMEMChawlaPMilanoSUttalLLundPTKuo DATE01/09/0701/10/0701/03/0701/04/0701/11 /07 OFFICED:NRRPM:RLRA NAMEJDyerLLund for JAyala DATE01/15/0701/17/07 OFFICIAL RECORD COPY Letter to P. Harden, from J. Ayala, dated January 17, 2007

SUBJECT:

ISSUANCE OF RENEWED FACILITY OPERATING LICENSE NO. DPR-20 FOR PALISADES NUCLEAR PLANT DISTRIBUTION:

HARD COPY DLR R/F E-MAIL: RWeisman GGalletti DShum SSmith (srs3)

SDuraiswamy

RidsNrrDlr

RidsNrrDlrRlra

RidsNrrDlrRlrb

RidsNrrDlrRlrc

RidsNrrDlrReba

RidsNrrDlrRebb

RidsNrrDci

RidsNrrDra

RidsNrrDe RidsNrrDeEemb

RidsNrrDeEeeb

RidsNrrDeEqvb

RidsNrrDss

RidsOgcMailCenter

RidsNrrAdes


M. Chawla P. Lougheed, RIII

J. Ellegood, RIII

J. Giessner,, RIII

A. Stone, RIII

L. Raghavan

OPA Palisades Nuclear Plant cc: Robert A. Fenech, Senior Vice President Nuclear, Fossil, and Hydro Operations

Consumers Energy Company

1945 Parnall Road

Jackson, MI 49201 Arunas T. Udrys, Esquire Consumers Energy Company

1 Energy Plaza

Jackson, MI 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Commission

2443 Warrenville Road, Suite 210

Lisle, IL 60532-4351 Supervisor Covert Township

P.O. Box 35

Covert, MI 49043 Office of the Governor P.O. Box 30013

Lansing, MI 48909 U.S. Nuclear Regulatory Commission Resident Inspector's Office

Palisades Plant

27780 Blue Star Memorial Highway

Covert, MI 49043 Michigan Department of Environmental Quality Waste and Hazardous Materials Division

Radiological Protection and Medical Waste

Section Nuclear Facilities Unit - Lou Brandon

Constitution Hall, Lower-Level North

525 West Allegan Street

P.O. Box 30241

Lansing, MI 48909-7741 Laurie A. Lahti, Manager Regulatory Affairs Nuclear Management Company, LLC Palisades Nuclear Plant

27780 Blue Star Memorial Highway

Covert, MI 49043 Stephen T. Wawro, Director of Nuclear Assets Consumers Energy Company

Palisades Nuclear Plant

27780 Blue Star Memorial Highway

Covert, MI 49043 Michael Sellman President and Chief Executive Officer

Nuclear Management Company, LLC

700 First Street

Hudson, WI 54016 Jonathan Rogoff, Esquire Vice President, Counsel & Secretary

Nuclear Management Company, LLC

700 First Street

Hudson, WI 54016 Douglas E. Cooper Senior Vice President - Group Operations

Palisades Nuclear Plant

Nuclear Management Company, LLC

27780 Blue Star Memorial Highway

Covert, MI 49043 Robert A. Vincent License Renewal Project Manager

Palisades Nuclear Plant

27780 Blue Star Memorial Highway

Covert, MI 49043 Mr. James Ross Nuclear Energy Institute

1776 I Street, NW, Suite 400

Washington, DC 20006-3708 Secretary Federal Energy Regulatory Commission

888 First Street, NE, Room 1A

Washington, DC 20426 Chairperson Michigan Public Service Commission

P.O. Box 30221

Lansing, MI 48909-7721 David Lewis Pillsbury Winthrop Shaw Pittman, LLP

2300 N Street, NW

Washington, DC 20037