ML073120083
From kanterella
Revision as of 22:18, 21 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Other | |
---|---|
Initiation
Administration | |
MONTHYEARML0713005002007-05-15015 May 2007
[Table View](Songs 2 and 3) - Request for Additional Information on the Proposed Amendment to Revise Loss of Voltage Signal Relay Replacement Project stage: RAI ML0725502572007-09-24024 September 2007 Request for Additional Information on the Proposed Amendment to Revise Loss of Voltage Signal Relay Replacement (Tac Nos. MD5112 and MD5113) Project stage: RAI ML0731200832007-11-0505 November 2007 Calculation E4C-015, Revision 0, Tlu Calculation for Loss of Voltage Relays at Class 1E 4.16 Kv Switchgear Project stage: Other ML0731200822007-11-0505 November 2007 Supplement 1 and Response to Requests for Additional Information on the Proposed Amendment for Loss of Voltage Signal (Lovs) Relay Replacement, Proposed Change Number (PCN) 577 Project stage: Supplement ML0801605092008-01-15015 January 2008 Response to Request for Additional Information on the Proposed Amendment for Loss of Voltage Signal (Lovs) Relay Replacement, Proposed Change Number (PCN-577) Project stage: Response to RAI ML0805203642008-02-19019 February 2008 Response to Request for Additional Information on the Proposed Amendment for Loss of Voltage Signal (Lovs) Relay Replacement, Proposed Change Number (PCN) Project stage: Response to RAI ML0806001622008-03-25025 March 2008 Tech Spec Pages for Amendment Nos. 216 and 208, Revise Technical Specification Surveillance Requirements 3.3.7.3.a and 3.8.1 Degraded Voltage Function Values Project stage: Other ML0806001502008-03-25025 March 2008 Issuance of Amendment Nos. 217 and 209, Revise Technical Specification Surveillance Requirements 3.3.7.3.a and 3.8.1 Degraded Voltage Function Values Project stage: Approval 2007-09-24 |
ML073120083 | |
Person / Time | |
---|---|
Site: | San Onofre |
Issue date: | 11/05/2007 |
From: | Southern California Edison Co |
To: | Office of Nuclear Reactor Regulation |
References | |
TAC MD5112, TAC MD5113 E4C-015, Rev 0 | |
Download: ML073120083 (66) | |
Similar Documents at San Onofre | |
---|---|
Category:Calculation
MONTHYEARML22062B0392021-12-16016 December 2021
[Table view]SCE Calculation SO1-207-1-C116, Revision 2, Modified Control Area Boundary ISFSI Dose Calculation ML13142A4262012-08-0909 August 2012 Enclosure 2: Revision 6 of the Offsite Dose Calculation Manual (Odcm), SO123-ODCM ML11119A2352011-04-26026 April 2011 SO123-ODCM, Rev. 4, Offsite Dose Calculation Manual Nuclear Organization ML11119A2342011-04-26026 April 2011 SO123-ODCM, Rev. 3, Offsite Dose Calculation Manual Nuclear Organization ML12118A0992011-03-17017 March 2011 SO123-ODCM, Revision 5, Offsite Dose Calculation Manual. Enclosure 2 ML0733005592007-11-15015 November 2007 Response to Requests for Additional Information on the Proposed Amendment for Degraded Voltage Setpoints, Proposed Change Number (PCN) 574 ML0731200832007-11-0505 November 2007 Calculation E4C-015, Revision 0, Tlu Calculation for Loss of Voltage Relays at Class 1E 4.16 Kv Switchgear ML0622803692006-07-11011 July 2006 Calculation No. M-DSC-354, Revision 1, Pressurizer Bottom Head Instrument Action Level Nozzle Evaluation. ML0610904792006-03-16016 March 2006 M-DSC-360, Rev. 0 - Evaluation of Half-Nozzle Repair for Pressurizer and Steam Generator Inst. Nozzles Under Long-Term Service Conditions ML0610904822006-03-16016 March 2006 M-DSC-411, Rev. 0 - Pressurizer Lower Level Nozzle Welding and Transient Analysis ML0607507582006-01-21021 January 2006 Enclosure 2, Calculation N-4072-001, Rev 6, CCN-9 Fuel Handling Accident Inside Fuel Handling Building Control Room & Offsite Doses ML0626201722005-12-23023 December 2005 Calculation No. M-DSC-412, Revision 0, SONGS 3 Pressurizer Thermowell, Nozzle Welding, and Transient Analysis ML0517902692005-06-24024 June 2005 Additional Information Regarding Proposed Change Number (PCN) 561 Degraded Voltage Set Points ML0521700552005-06-0202 June 2005 Calculation M-DSC-356, Evaluation of Modified Pressurizer Heater Sleeves ML0515300682005-05-26026 May 2005 Calculation No. E4C-090, Revision 3, Auxiliary System Voltage Regulation ML0515300642005-05-26026 May 2005 Calculation No. E4C-082, Revision 2, System Dynamic Voltages During DBA ML0515300622005-05-26026 May 2005 Calculation No. E4C-130, Revision 1, Tlu Calc for Undervoltage Relay Circuits at Class 1E 4 Ky Switchgear ML0515300612005-05-26026 May 2005 Calculation No. E4C-090, Revision 3, Auxiliary System Voltage Regulation ML0515300392005-05-26026 May 2005 Calculation No. E4C-130, Revision 1, Tlu Calc for Undervoltage Relay Circuits at Class 1E 4 Kv Switchgear ML0434101252004-12-0202 December 2004 Additional Information Supporting the Third Ten-Year Inservice Inspection (ISI) Interval Relief Requests ISI-3-11, Revision 1 and ISI-3-12 to Support Pressurizer Heater Sleeve Repairs ML0512202262004-09-0303 September 2004 Revision 22 to Unit 1 Offsite Dose Calculation Manual (ODCM) ML0512202242004-02-26026 February 2004 Revision 21 to Unit 1 Offsite Dose Calculation Manual (ODCM) ML0512202232004-02-26026 February 2004 Revision 39 to Units 2/3 Offsite Dose Calculation Manual (ODCM) ML0607506712003-09-16016 September 2003 Calculation N-6030-001 Containment Aerosol and Iodine Removal Rates. ML0607507532003-02-0606 February 2003 Enclosure 1, Calculation N-4072-001, Revision 6, Fuel Handling Accident Inside Fuel Handling Building Control Room & Offsite Doses ML0312503292002-02-28028 February 2002 Annual Radioactive Effluent Release Report for 2002 & Offsite Dose Calculation Manual, Table of Contents Through Section 6.0 2021-12-16 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML073120083&oldid=1121086"