ML083450160

From kanterella
Revision as of 16:15, 14 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
DOE/RW-0596, Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites, December 2008
ML083450160
Person / Time
Site: Haddam Neck, 06300001  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/31/2008
From:
US Dept of Energy, Office of Civilian Radioactive Waste Mgmt (OCRWM)
To:
Office of Nuclear Material Safety and Safeguards, US Congress
References
DOE/RW-0596
Download: ML083450160 (26)


Text

DOE/RW-0596 Report to Congress on th e Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites December 2008 U.S. Department of Energy Office of Civilian Radioactive Waste Management Washington, D.C.

Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel The picture on the cover is the Connecticut Yankee Independent Spent Fuel Storage Installation site in Haddam, Connecticut, with 43 dry st orage NRC-licensed dual-purpose (storage and transport) casks.

ii Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel EXECUTIVE

SUMMARY

The House Appropriations Committee Print that accompanied the Consolidated Appropriations Act, 2008, requests that the U.S. Department of Energy (the Department): -develop a plan to take custody of spent fuel currently stored at decommissioned reactor sites to both reduce costs that are ultimately borne by the taxpayer and demonstrate that DOE can move forward in the near-term with at least some element of nuclear waste policy. The Department should consider consolidation of the spent fuel from decommissioned reactors either at an existing federal site, at one or more existing operating reactor sites, or at a competitively-selected interim storage site. The Department should engage the 11 sites that volunteered to host Global Nuclear Energy Partnership facilities as part of this competitive process. The Department has reviewed its authority to accept spent nuclear fuel from decommissioned commercial nuclear power reactor sites for inter im storage and has concluded that it has no such currently exercisable authority. Legislation is required that would eliminate the limitations in the Nuclear Waste Policy Act of 1982, as amended, on taking commercial spent nuclear fuel for interim storage prior to the opening of the Yucca Mountain reposit ory. In addition, in order to undertake interim storage in a timely manner, legi slation would be needed: (1) to direct the Department to take spent nuclear fuel from decommissioned commercial nuclear power reactors as soon as possible; (2) to establish an exped ited siting process; a nd (3) to authorize the Department to construct and opera te the facility under its regulator y authority, or, if the facility were to be constructed and operated under a U.S. Nuclear Regulatory Commission license, to provide for an expedited siting and licensing process. Furthermore, such legislation should also provide for funding reform to ensure that the Department would have access each year to adequate funds from the Nuclear Waste Fund to ca rry out such activ ities. Reliable and sufficient funding is necessary for the simultaneous development of the Yucca Mountain repository, an interim storage facility, and transportation of spent nuclear fuel to both facilities. The Department has concluded that, without legislation, a demonstration could not be completed in the near term and would not reduce taxpayer costs for waste disposal. Assuming expeditious resolution of a number of complex statutory, regulatory, siting, construction, and financial issues, if development were to begin in 2009, such a facility might begin operations in 2015 at the earliest and complete operations by shipping commercial spent nuclear fuel from the interim storage facility to Yucca Mountain between 2025 to 2028 at a cost of $743 million. It would increase the total system life cycle costs of the repository program under the Nuclear Waste Policy Act of 1982, as amended.

The ongoing liability associated with the Department's delay in waste acceptance (currently $11 billion, assuming that operati on of the Yucca Mountain repository begins in 2020) would not be reduced in any significant way and could be in creased if directing the priority acceptance of spent nuclear fuel from the ten decommissioned commercial nuclear power reactors resulted in additional litigation from contract holders with operating reactors. If Congress authorizes the Department to initiate interim storage for the consolidation of the spent nuclear fuel from decommissioned commercial nuclear power reactors and amends the interim storage siting provisions provided in the Nuclear Waste Policy Act of 1982, as amended, the Department iii Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel would consider either an existing federal site, one or more existing operating commercial nuclear power reactors, or a competitively selected interim storage site, engaging the sites that have volunteered to host Global Nuclear Energy Partnership facilities as part of the competitive process. Authorization and funding by Congress to perform interim storag e would provide the Department an option in addition to Yucca Mountain to allow the Department to begin to meet its contractual obligations with the owners of commercial spent nuclear fuel. This option could prove beneficial should Yucca M ountain experience delays due to licensing, litigation, lack of funding, or other causes, but only if the enabling legislation adequately addresses the issues discussed in this report.

iv Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel CONTENTS Page EXECUTIVE

SUMMARY

...........................................................................................................iii ACRONYMS................................................................................................................................vii 1. INTRODUCTION

...................................................................................................................1

2. CURRENT COMMERCIAL SNF STORAGE

.......................................................................1

2.1 COMMERCIAL

SNF AT DECOMMISSIONED NUCLEAR POWER REACTOR SITES

...........................................................................................................1

3. STANDARD DISPOSAL CONTRACTS, LITIGATION, AND FINANCIAL LIABILITIES

...........................................................................................................................4

3.1 STANDARD

DISPOSAL CONTRACT

.........................................................................4

3.2 CURRENT

LITIGATION RELATED TO THE STANDARD CONTRACT

...............5

3.3 FINANCIAL

LIABILITIES DUE TO DELAY IN WASTE ACCEPTANCE

...............5

4. HISTORY OF INTERIM STORAGE POLICY IN THE U.S.

...............................................6 4.1 DOE AUTHORITY TO ACCEPT SNF UNDER THE ATOMIC ENERGY

ACT OF 1954

..................................................................................................................6 4.2 DOE AUTHORITY UNDER THE NUCLEAR WASTE POLICY ACT

OF 1982...........................................................................................................................7

5. PREREQUISITES FOR A LIMITED DEMONSTRATION OF INTERIM STORAGE OF SNF FROM NINE DECOMMISSIONED NUCLEAR POWER REACTOR SITES

...................................................................................................................8 5.1 AUTHORITY..................................................................................................................9

5.2 SITING

PROCESS

..........................................................................................................9

5.2.1 Existing

Interim Storage Siting Requirements under the NWPA.......................9

5.2.2 Possible

Expedited Siting Process....................................................................10

5.2.3 Potential

Locations............................................................................................11

5.3 LICENSING

AND ENVI RONMENTAL REVIEW

.....................................................12 5.4 CONSTRUCTION, TRANSPORTATION, AND OPERATIONS

..............................12 5.5 FUNDING......................................................................................................................13

5.5.1 Project

Cost and Schedule................................................................................13

5.5.2 Legislative

Funding Reform.............................................................................15

5.5.3 Impact

on the Adequacy of the Fee..................................................................15

6. CONCLUSION

......................................................................................................................15

7. REFERENCES

......................................................................................................................17 v

Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel TABLES Page 1. Status of Decommissioned Commercial Nuclear Power Reactor Sites in the U.S.

.............3

2. Waste Acceptance Schedule for the Acceptance of the SNF from the Nine Decommissioned Commercial Nuclear Power Reactor Sites

............................................13

3. Estimated Cost and Schedule for Interim St orage of SNF from Decommissioned Nuclear Power Reactors Sites

..........................................................................................................14 vi Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel ACRONYMS AEA Atomic Energy Act DOE U.S. Department of Energy GNEP Global Nuclear Energy Partnership HLW high-level radioactive waste MRS monitored retrievable storage MTHM metric tons of heavy metal NRC U.S. Nuclear Regulatory Commission NWF Nuclear Waste Fund NWPA Nuclear Waste Policy Act OFF oldest fuel first SNF spent nuclear fuel vii Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel INTENTIONALLY LEFT BLANK viii Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel

1. INTRODUCTION This report has been produced at the request of Congress. The House Appropriations Committee Print that accompanied the Consolidated Appropriations Act, 2008, requests that the U.S. Department of Energy (the Department): -develop a plan to take custody of spent fuel currently stored at decommissioned reactor sites to both reduce costs that are ultimately borne by the taxpayer and demonstrate that DOE can move forward in the near term with at least some element of nuclear waste policy. The Department should consider consolidation of the spent fuel from decommissioned reactors either at an existing federal site, at one or more existing operating reactor sites, or at a competitively-selected interim storage site. The Department should engage the 11 sites that volunteered to host Global Nuclear Energy Partnership facilities as part of this competitive process.

This report discusses the status of the commercial spent nuclear fuel (SNF) inventory in the United States, at both decommissioned and operating commercial nuclear power reactor sites; summarizes the contractual arrangement the government and utilities have under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961) (Standard Contract), related litigation, and the financial liabilities resulting from the Department's delay in performance under these c ontracts; provides a history of interim storage policy as it relates to commercial SNF in the United States; and identifies actions that would be necessary for the Department to develop an interim storage facility and demonstration program for commercial SNF from the decommissioned commercial nuclear power reactor sites. 2. CURRENT COMMERCIAL SNF STORAGE There are currently 104 operating and 14 permanently shutdown commercial nuclear power reactors in the United States; four of these shutdown reactors are located at sites with other operating reactors. The other ten shutdown reactors are located at nine sites with no other nuclear operations. For purposes of this report, the Department inte rprets the Congressional intent in the House Appropriations Committee Print to be the ten shutdown (decommissioned) commercial nuclear power reactors located at the nine sites with no other nuclear operations. The SNF stored at the nine sites represents a small portion of the total SNF inventory currently stored at 72 commercial sites in the United States. An interim storage facility developed solely for the SNF from the nine sites would be significantly smaller than storage faciliti es previously considered as part of the federal waste management system. 2.1 COMMERCIAL SNF AT DECOMMISSI ONED NUCLEAR POWER REACTOR SITES There are currently ten decommissioned commercial nuclear power reactors located at nine sites with no other nuclear operations. Approximately 2,800 metric tons of heavy metal (MTHM) of SNF is stored on a temporary basis at these nine sites, awaiting removal by the Department for 1 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel 2 permanent disposal. Until this SNF is removed from these nine sites, the sites cannot be fully decommissioned and made available for other purposes.

As of the end of 2007, six of the nine sites have developed independent spent fuel storage installations and placed all of their SNF into dual-purpose storage systems; one additional site is loading its SNF into dry storage during 2008. While the two remain ing sites are planning for dry storage, the facilities have not yet been developed, and over 1,000 MTHM of SNF remains in pool storage at these two sites. Table 1 provi des a summary of the nine sites, including the quantity and status of the SNF located at the sites. For the sites that have not yet implemented dry cask storage, one has already entered into a contract for dry storage, and for the other, the Department has estimated the number of storage casks. As noted in Table 1, the Department estimates that all of the SNF currently located at the nine sites will be packaged in approximately 294 storage/transport cask systems. These systems utilize a sealed stainless steel canister to contain the SNF. The SNF canister and the required overpacks will be certified by the U.S. Nuclear Regulatory Commission (NRC) for storage (under 10 CFR Part 72) and transportation (unde r 10 CFR Part 71). These canisters, when placed in an approved transportation overpack, can be shipped directly from the utility site to an interim storage facility, where the canister woul d be taken from the transportation overpack and placed into a storage overpack for interim storage.

Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel Table 1. Status of Decommissioned Commercial Nuclear Power Reactor Sites in the U.S.

3 Plant State MTHM Stored at Site MTHM in Pool Storage MTHM in Dry Storage Number of Casks DOE Estimated Casks Total Casks (Actual Plus Estimated) Average MTHM/Cask Big Rock Point Michigan 58 0 58 7 - 7 8.3 Haddam Neck Connecticut 412 0 412 41 - 41 10.1 Humboldt Bay aCalifornia 29 0 29 5 - 5 5.8 LaCrosse bWisconsin 38 38 0 5 - 5 7.6 Maine Yankee Maine 542 0 542 60 - 60 9.0 Rancho Seco California 228 0 228 21 - 21 10.9 Trojan Oregon 359 0 359 34 - 34 10.6 Yankee Rowe Massachusetts 127 0 127 15 - 15 8.5 Zion 1 & 2 cIllinois 1,019 1,019 0 - 106 106 9.6 TOTALS 2,813* 1,057 1,756* 188 106 294 - NOTE: aDry storage underway in 2008. Holtec canister has capacity of 80 assemblies (five canisters for the 390 assemblies).

bDry storage contract entered with NAC for five NAC-MPC canisters. Dry storage schedule indicates target completion by the end of 2010. cDecommissioning contract entered with EnergySolutions. Canisters estimated using FuelSolutions W21 capacity. Target schedule for completion is 2013. DOE = U.S. Department of Energy; MPC = multipurpose canister; NAC = Nuclear Assurance Corporation.

  • Totals might differ from sums of values due to rounding.

Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel 3. STANDARD DISPOSAL CONTRACTS, LITIGATION, AND FINANCIAL LIABILITIES The Standard Contract (10 CFR Part 961) defines the terms and conditions under which the government will accept commercial SNF for disposal in a geologic repository. The Department has taken the position that, as a general matter with respect to existing reactors, it will implement the Standard Contract by taking commercial SNF in the order it was generated. If Congress enacted legislation that directed the Department to take SNF from decommissioned reactors as a limited demonstration program, the Department would assign a priority to the acceptance of the SNF from these sites, pursuant to the provision in the Standard Contract that grants the Department the discretion to take SNF from decommissioned reactors on a priority basis. As discussed in the following sections, this situ ation would be a change from the current Department position stated previously. 3.1 STANDARD DISPOSAL CONTRACT Section 302(a) of the Nuclear Waste Policy Act of 1982, as amended (NWPA), authorizes the Secretary of Energy to "enter in to contracts with any person w ho generates or holds title to high-level radioactive waste, or spent nuclear fuel." These contracts cover the acceptance of title, subsequent transp ortation, and disposal of such high-level radioactive waste (HLW) or SNF. The NWPA stipulates that the contracts provide for the payment of fees to the Secretary to offset the expenditures of provi ding these services, and specifica lly in Section 302(a)(5), it further requires that contracts entered into under this section provide that:

A. following commencement of operation of a repository [

emphasis added

], the Secretary shall take title to the high-level radioactive waste or spent nuclear fuel

involved as expeditiously as practicable upon the request of the generator or owner of such waste or spent fuel; and B. in return for the payment of fees established by this section, the Secretary, beginning not later than January 31, 1998, will dispose of the high-level radioactive waste or spent nuclear fuel involved as provided in this subtitle. In 1983, the Department promulgated the provisions in a disposal cont ract through notice and comment rulemaking. The resulting contract, know n as the Standard Cont ract, can be found at 10 CFR 961.11. Priority for Waste Acceptance-In addition to the provisions required by the NWPA, the Standard Contract also contains provisions that establish the res ponsibilities of the parties, the terms for payment, and the processes and procedures for the transfer of title and physical possession of the HLW and SNF from the utility company to the federal government. In particular, the Standard Contract establishes the process for allocating the federal government's finite waste acceptance capacity among the various utility purchasers. This waste acceptance allocation, also known as the acceptance queue, is developed in accordance with the principle of "oldest fuel first" (OFF). Under the OFF methodology, the oldest SNF, as measured from the date of permanent discharge from the reactor, is given the highest priority in the acceptance queue. This approach ensures that all SNF, regardless of 4 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel location or ownership, is afforded equal treatment in establishing waste acceptance priority. Using the OFF methodology to allocate the Department's planned waste acceptance capacity, the last SNF shipment from the ten decommissioned commercial nuclear power reactors considered in this report would be 15 years after the repository be gins operations.

The contract allows the OFF queue to be altered under certain conditions with Department consent. For instance, utility companies may, subject to Department approval, exchange places in the waste acceptance queue. Additionally, the Department may alter the queue by granting priority acceptance in cases of emergencies or by permitting priority acceptance of the SNF from reactors that have permanently ceased operations (decommissioned reactors). The Department has been asked, on numerous occasions, to exercise its discretion under the Standard Contract to allow for the priority acceptance of SNF from decommissioned reactors. In all instances, the Department has declined to grant this priority, notin g that doing so would, because of the finite nature of the federal government's planned waste acceptance capacity, adversely affect the timely removal of SNF from operating reactor sites. In other words, acceleration in waste acceptance from a decommissioned reactor site would result in a corresponding delay in removing SNF from an operating reactor site. Because of issues of equity that may result from this reallocation of waste acceptance capacity, the government has consistently advised the parties seeking such priority treatment to avail themselves of the exchange provisions of the Standard Contract that allow the utilities to exchange approved delivery commitments subject to the Department's approval. 3.2 CURRENT LITIGATION RELATED TO THE STANDARD CONTRACT Because the Department has had no facility available to receive SNF under the NWPA, it has been unable to begin accepting SNF as required by the Standard Contracts. Significant litigation has ensued as a result of this delay. The Federal Circuit Court in the cases Northern States Power Co. v. U.S., 224 F.3d 1361 (Fed. Cir. 2000) and Maine Yankee Atomic Power Company v. United States , 225 F.3d 1336 (Fed. Cir. 2000) found the Department to be in partial breach of its contracts and found that utilities are entitled to recover damages for that breach. To date, more than 70 lawsuits have been filed, and more than 50 lawsuits remain pending against the government for delay damages. Between 1998 and 2004, all ten decommissioned re actor utilities file d cases against the government for its delay. Claims for two of the decommissioned reactor utilities have been settled, and claims for the other eight decommissi oned reactor utilities remain pending either in the U.S. Court of Federal Claims (trial courts) or in the U.S. Court of Appeals for Federal Circuit (appellate court). The government has appealed trial court damage awards of approximately $226 million for five decommissioned reactors, but no final rulings have been issued in those

cases. 3.3 FINANCIAL LIABILITIES DUE TO DELAY IN WASTE ACCEPTANCE The government has settled claims with ut ilities covering 29 of the 118 operating and decommissioned reactors, nearly 25 percent of the commercial nuclear power reactors covered by Standard Contracts. If the Department begins to accept SNF by 2020, the Department 5 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel estimates that the federal government's liability for delay damages may be up to approximately $11 billion. For each additional year of delay, the Department estimates that there may be hundreds of millions of dollars of additional damages.

As discussed in Section 2.1, seven of the nine decommissioned nuclear power reactor sites have already constructed interim storage facilities at the reactor sites and deployed dry cask storage systems for their entire SNF inventory. In most cases the government will be responsible for a portion of the costs incurred at these sites due to the Department's failur e to begin accepting SNF in 1998, and those costs will be paid from the Judgment Fund. Accepting SNF from decommissioned reactors is unlikely to have any effect on the amount of damages unless the legislation that established the limited demonstration program was to make the elimination or reduction of damages a condition of participation. Because most of the ten decommissioned reactors have already incurred costs for their onsite storage facilities, a limited demonstration program to remove the SNF from these sites to an interim storage facility would not significantly change the estimated overall liability of $11 billion. At the same time, directing the priority acceptance of SNF from the ten decommissioned reactors would likely result in additional litigation from contract holders with operating reactors, as well as in demands for acceptance of their SNF at an interim storage facility. 4. HISTORY OF INTERIM STOR AGE POLICY IN THE U.S.

This section provides a review of the history of interim storage policy to date. The Department has under certain circumstances accepted commercial SNF under the authority of the Atomic Energy Act of 1954 (AEA) (42 U.S.C. 2011 et seq.). The NWPA, however, severely limits the Department's authority to accept such SNF for interim storage. 4.1 DOE AUTHORITY TO ACCEPT SNF UN DER THE ATOMIC ENERGY ACT OF 1954 Prior to the enactment of the NWPA in 1982, the Department ha d authority and continues to have authority to accept SNF in certain circumstances pursuant to the AEA. Section 55 of the AEA, as amended (42 U.S.C. 2075), provides that the Department "is authoriz ed, to the extent it deems necessary to effectuate the provisions of

[the Act], to purchas e, - take, requisition, condemn, or otherwise acquire any special nuclear material or any interest therein." The authority under the AEA may be ex ercised to further any of its purposes, including international cooperation and nuclear nonprolifera tion, support of research and development in nuclear power, and management of the U.S. nuclear defense programs (42 U.S.C. 2111, 42 U.S.C. 2112, 42 U.S.C. 2013, 42 U.S.C.

2051(a), and 42 U.S.C. 2152).

Pursuant to this AEA authority, the Department has accepted and stored U.S.-supplied foreign reactor fuel at various DOE sites. The Department has also used this authority to accept small amounts of SNF for research and development purposes, such as parts of the Three Mile Island Unit 2 damaged reactor core and other damaged SNF. The Department has also accepted commercial SNF under settlement of disputes resulting from contracts that predate enactment of the NWPA. 6 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel However, the later-enacted NWPA provided a detailed statutory scheme for SNF storage and disposal and limited the Department's author ity to accept SNF unde r the AEA except in compelling circumstances such as acceptance of SNF to abate a public health risk in an emergency. For the Department to accept any commercial SNF under the AEA, the Department could do so only under certain circumstances determ ined to be identifiable exceptions in the AEA like those discussed previously. In the absence of statutory direction to accept SNF from decommissioned reactors that explicitly addressed the limitations imposed by the NWPA, the Department does not believe that the acceptance of the SNF from the ten decommissioned reactors considered in this report would be permitted under an identifiable exception in the AEA. 4.2 DOE AUTHORITY UNDER THE NUCLEAR WASTE POLICY ACT OF 1982 With enactment of the NWPA, Congress provided a detailed statutory scheme for commercial SNF storage and disposal that, by its specificity, limits the Department's commercial SNF storage and disposal options as follows. The NWPA permits the Department to undertake interim storage in two distinct instances, descriptions of which follow, neither of which can currently be exercised.

First, Section 135 of the NWPA (Subtitle B-Interim Storage Program) authorized the Department to enter into contracts to assist or provide temporary st orage, known as federal interim storage, for a limited amount of SN F under certain specified conditions (including a separate fee) until a repository was available. This authority expired in 1990. Second, Section 141 of the NWPA (S ubtitle C, Monitored Retrieva ble Storage), authorized the Department to site, construct, and operate a monitored retrievable storage (MRS) facility but restricted the ability of the Department to pursue this option by linking any activity under this section to milestones tied to progress in the development of the Yucca Mountain repository (42 U.S.C. 10155 to 42 U.S.C. 10157). For example, before the MRS can be constructed, the NRC must have issued a construction authorization for the Yucca Mountain repository; and until the Yucca Mountain repository starts accepting SNF, the quantity of SNF stored at the MRS site cannot exceed 10,000 MTHM. After the Yucca Mount ain repository starts accepting SNF, the total quantity of SNF at the MRS site cannot exceed 15,000 MTHM at any one time. Additionally, the NWPA stipulated that the MRS cannot be loca ted in the State of Nevada.

In 1994, in an effort to consider all available avenues to accept commercial SNF, the Department issued a Notice of Inquiry on Waste Acceptance Issues seeking public comment on, among other issues, whether the Department had statutory authority under the NWPA to provide interim storage of SNF (59 FR 27007). In the subse quent 1995 final report responding to public comments, the Department determined again that the NWPA explicitly contemplated interim storage in only two instances: interim storage under Section 135 of the NWPA and an MRS under Section 141 of the NWPA (O ffice of Civilian Radioactive Waste Management; Nuclear Waste Acceptance Issues, 60 FR 21793).

However, the report also noted that the interim storage provision had expired and the MRS provisions we re unusable because of the required linkages to repository development. The report concluded that because neither of the NWPA's explicit interim storage authorities applied and becau se the NWPA precluded the Secretary from spending Nuclear Waste Fund (NWF) monies for cons truction or expansion of a facility without 7 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel express authorization from Congress, the Department lacked authority at that time to provide interim storage under existing law. Specifi cally, the report stated the following: Interim storage by DOE was contemplated by the Act in only two situations, neither of which currently applies. Under the Act, DOE had authority to offer a limited interim storage option. See 42 U.S.C.

10156. However, that authority has, by its express terms, expired. Under the Act, DOE also has the authority to provide for interim storage in an MRS. That authority also is inapplicable, however, because the Act ties construction of an MRS to the schedule for development of a repository. See 42 U.S.C. 10165, 10168.

Because these are the only interim storage authorities provided by the Act, and because the Act expressly forbids use of the Nuclea r Waste Fund to construct or expand any facility without express congressional authorization (42 U.S.C. 10222(d)), DOE lacks authority under the Act to provide interim st orage services under present circumstances. (60 FR 21793; emphasis added) In addition, whether or not the Department can begin accepting SNF from commercial utilities prior to receiving construction authorization for the Yucca Mountain repository has been one of the issues litigated by contract holders. No court has found that the Department has authority under the NWPA to accept SNF from commercial utilities at this time. For these reasons, the Department believes that any statutory direction to begin accepting SNF from decommissioned reactors would also need to address the limitations on the current exercise by the Department of its authority under the AEA to accept commercial SNF, as discussed earlier in this section. 5. PREREQUISITES FOR A LIMITED DEMONSTRATION OF INTERIM STORAGE OF SNF FROM NINE DECOMMISSIONED NUCLEAR POWER REACTOR SITES The Department has identified a number of issues that would need to be addressed in any legislation that would direct the Department to begin accepting SNF from decommissioned reactors in order for the Department to have the ability to implement such direction in a timely and efficient manner. As noted previously, the limitations in the NWPA on the current exercise by the Department of its authority under the AEA to accept commercial SNF would need to be rendered inapplicable to SNF from decommissioned reactors. In addition, the Department has concluded that the existing provisions in the NWPA relating to interim storage would not result in the timely and efficient implementation of statutory direction to begin accepting SNF from decommissioned reactors because of the length of time and the potential of the state to veto the site under the existing provision of the NWPA. To proceed in a timely manner, the Department would require legislation to (1) direct the Department to take SNF from decommissioned reactors as soon as possible under its AEA authority; (2) establish an expedited siting process; and (3) authorize the Department to construct and operate the facility under its own regulatory

authority, or, if the facility we re to be constructed and operated under an NRC license, to provide for an expedited licensing process. Moreover, to be effective, any legislation would need to include funding reform to ensure that the Department has prompt access to the annual fees and interest paid into the NWF so that the Departme nt could undertake its ob ligations to construct both the interim storage facility and the Yucca Mountain repository in a timely and efficient manner and thereby fulfill its commitments to all contract holders. 8 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel 5.1 AUTHORITY Because of the limitations on the current exercise of the Department's authority under the AEA, any legislation would need to make those limita tions inapplicable to SNF from decommissioned commercial nuclear power reactors. In addition, to minimize the potential for further litigation from other contract holders, the legislation would likely need to expressly direct the Department to exercise its discretionary authority under the Standard Contract to take SNF from the decommissioned reactors on a priority basis as part of a statutorily mandated limited demonstration program. 5.2 SITING PROCESS The Department has concluded that timely and efficient implementation of a limited demonstration program would also require establishment of a new statutorily mandated expedited siting process, rather than use of the existing siting processes in Subtitles B and C of the NWPA. 5.2.1 Existing Interim Storage Siti ng Requirements under the NWPA Under Subtitle B, Interim Storage Program, the Department was authorized to (1) assist or provide temporary interim storage at government facilities, (2) provide for the acquisition of temporary storage casks for federal or civilian nuclear sites, or (3) construct storage capacity at any civilian nuclear power site.

This subtitle expired in 1990. Under Subtitle C, Monitored Retrievable Storage, the Department is author ized to site, design, and license a storage facility. The Department cannot construct the facility, however, until the Department has received a construction author ization from the NRC for the Yucca Mountain repository. In addition, Section 145 of the Act al so prohibits the Secretary from selecting a site that is located in the State of Nevada. The MRS Commission was es tablished pursuant to Section 143 of the NWPA and delivered its report to Congress in 1989. The Department recommended the Yucca Mountain site for the development of a repository in 2002. The Department could proceed with the siting of an interim storage facility in accordance with the requirements of Sections 144 through 146 of the NWPA.

Section 144 require s the Secretary to survey and evaluate potentially suitable sites. From a technical standpoint, such a facility could be successfully developed virtually anywhere in the nation, other than Nevada; however, as specifically stated in Section 144, the NWPA limits the Secretary's consideration stating that the Secretary shall consider the extent to which siting an MRS facility would: 1. Enhance the reliability and flexibility of the system for the disposal of spent nuclear fuel and high-level radioactive waste established under this Act; 2. Minimize the impacts of transportation and handling of such fuel and waste; 3. Provide for public confidence in the ability of such system to safely dispose of the fuel and waste; 4. Impose minimal adverse effects on the local economy and the local environment; 9 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel 5. Provide a high probability that the facility will meet applicable environmental, health, and safety requirements in a timely fashion; 6. Provide such other benefits to the system for the disposal of spent nuclear fuel and high-level radioactive waste as the Secretary deems appropriate; and 7. Unduly burden a State in which significant volumes of high-level radioactive waste resulting from atomic energy defense activities are stored. Upon completion of the site surveys, the Secretary can select a site in accordance with the provisions of Section 145 of the NWPA. The Secretary may select a site from the sites evaluated under Section 144 that the Secretary determines on the basis of available information to be the most suitable for the development of an interim storage facility that is an integral part of the system for the disposal of SNF and HLW. The Secretary shall also prepare an environmental assessment with respect to such a selection and shall submit the environmental assessment to Congress at the time the site is selected. Additionally, at least six months before selecting a site, the S ecretary must notify the governor and legislature of the state in which the site is located (or the governing body of the affected Indian tribe where such site is located) of the potential selection and the basis for such selection. At least one public meeting must be held in the vicinity of the potential site to solicit input from interested parties. Section 145 also prohibits the Secretary from sele cting a site that is located in the State of Nevada.

Once the Secretary notifies Congress of the selection of a site, the selection is effec tive at the end of 60 calendar days from the da te of Congressional no tification, unless th e governor and state legislature (or the governing body of the affected Indian tribe if the site is located on a reservation) have submitted to Congress a notice of disapproval with respect to the site. If a notice of disapproval is received, the selection of the site is not effective unless Congress overrides the notice of disapproval as provided under Section 115(c) of the NWPA. The NWPA also stipulates the amount of financial assistance (grants, technical assistance, and other financial assistance) that the Department can provide the host state of the interim storage facility. This amount includes benefit payments of $5 million per year prior to the start of storage facility operations and

$10 million per year thereafter. 5.2.2 Possible Expedited Siting Process The Department has concluded that in order to allow for the timely implementation of an interim storage facility, the siting process for the interim storage facility for the demonstration program, to a very large extent, would need to follow the process that would be utilized for siting a commercial away-from-reactor storage facility. That is, there should be (1) no special provisions that link the siting, construction, or operation to events related to the Yucca Mountain repository; (2) no provisions for Presidential or Congressional involvement in appr oval of the site; and (3) no provisions for a veto. In addition, the siting process would be facilitated if substantial benefit payments were potentially available to the host state. 10 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel 5.2.3 POTENTIAL LOCATIONS As requested by Congress, the Department has considered the consolidation of the SNF from decommissioned reactors at an existing federal site, at one or more existing operating reactor sites, or at a competitively selected interim storage site, including sites that volunteered to host Global Nuclear Energy Partnership (GNEP) facilities as part of this competitive process. It is likely that state or local governments at or around the host site would impose limitations on the interim storage facility, such as a capacity limit to prevent the site from future expansion beyond an agreed-upon capacity or a financial penalty if the SNF is left in place and not removed to the Yucca Mountain repository within a specified time period. 5.2.3.1 Existing Federal Site An interim storage facility could be developed at a DOE site or at many other federal sites. The Department's sites at Savannah River, Hanf ord, and Idaho possess existing infrastructures, including security programs for SNF, operati onal and regulatory expertise, fully developed environmental baselines, and rail access that would facilitate acceptance. The Idaho National Engineering Laboratory site may present some unique issues due to prior agreements between the Department and the State of Idaho regarding the acceptance of commercial SNF. 5.2.3.2 One or More Existing Operating Reactor Sites The Department could solicit expressions of interest for the consolidation of SNF from decommissioned reactors at one or more operating reactor sites. If an existing NRC-licensed site were chosen, it would be necessary to develop the interim storage facility under NRC licensing requirements. Under current NRC regulations, the reactor operators are licensed to possess quantities of SNF only as required to operate their reactors. Accepting SNF from decommissioned reactors at an operating reactor site would require a modification to the

operating reactor's NRC license. This process may require heari ngs that could be contentious, thus delaying acceptance. Like the Department's sites, existing reactor sites have fully developed nuclear infrastructures and environmental baselines. 5.2.3.3 Competitively Selected Interim Storage Site The Department could broadly solicit expressions of interest for the development an interim storage site for the SNF from the decommissioned reactors. This effo rt could build upon recent Department efforts in developing site characterization reports for elev en potential sites as part of the Department's GNEP program and other industry initiatives. As with the GNEP siting effort, the competitive process for selection of an interim storage facility should have the benefit of identifying a willing and supportive host. The sites may or may not have an existing nuclear infrastructure, and they could require more time for development and establishment of an environmental baseline. It shou ld be noted, however, that local willingness and support for a site initially does not ensure continued support for th e facility during the long timeframe needed to license and build su ch a facility. 11 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel 5.3 LICENSING AND ENVIRONMENTAL REVIEW Under Section 202 of the Energy Reorganization Act of 1972, any Department facility used primarily for the interim storage of commercial SNF must be licensed by the NRC. Information obtained from the NRC Web site indicates that the development of SNF storage facilities at nuclear power reactor sites typically takes up to three years from the decision to implement through operation.

1 The NRC review of the Private Fuel Storage license application for a proposed interim storage facility in Utah, which encountered significant public opposition, took over eight years. Since the SNF currently in storage at the nine decommissioned reactor sites is stored in six different types of storage systems, the license application for the interim storage facility would have to address the use of all these types of storage systems, and would be, therefore, more complex than the license application for existing facilities, which each use only one type of storage system. Construction and operation of the interim storage facility would be expedited if the Department were authorized to use its authority under the AEA to regulate the facility. Alternatively, if the NRC were to license the facility, the NRC should be directed to use an expedited licensing process such as making use of the existing general license for certain interim SNF storage facilities. In additi on, the NRC should be directed by statute to adopt DOE National Environmental Policy Act of 1969 (42 U.S.C. 4321) documents for the interim storage facility in a manner similar to the current approach in the NWPA, with respect to the environmental impact statement for the Yucca Mountain repository. Furthermore, as in the case for SNF that will be transported to the Yucca Mountain repository, the Department and not the NRC should be

responsible for regulating the transportation of SNF to the interim storage facility. 5.4 CONSTRUCTION, TRANSPORT ATION, AND OPERATIONS Construction of the interim storage facility would be expedited if the interim storage facility were located at a site with existing nuclear infrastructure, rail tran sportation, and security services. At such a site, the re quired facilities would include a simplified canister receipt facility that could be utilized to remove the storage canisters from the transportation cask system and place them in appropriate onsite storage overpacks, an overpack fabrication facility for the onsite fabrication of the storage overpacks, an onsite transporter for transporting the loaded storage systems from the canister receipt facility to the st orage pads, and one or more reinforced concrete storage pads. Based on experience at commerci al nuclear facilities, the construction of these facilities could be completed in 12 to 24 months, assuming adequate funding, the issuance of all necessary permits, no linkage of construction to events related to the Yucca Mountain repository, and the absence of litig ation-related delays.

Transportation-For the purpose of this report, the Department has developed an illustrative waste acceptance schedule for the acceptance of the SNF from the nine decommissioned reactor

1 http://www.nrc.gov/waste/spent-fuel-storage/s f-storage-licensing/license-considerations.html 12 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel 13 sites. To expedite acceptance in the near term, the Department has developed this schedule based on an approach that focuses on efficiency in transporting the SNF to the interim storage facility and does not follow the notification and scheduling requirements contained in the Standard Contracts. As shown in Table 2, the schedule presumes that all the SNF is removed from the nine decommissioned reactor sites in a period of four years. Table 2. Waste Acceptance Schedule for the Acceptance of the SNF from the Nine Decommissioned Commercial Nuclear Power Reactor Sites Shipping Schedule MTHM Shipments/Year Year 1 400 46 Year 2 600 57 Year 3 794 85 Year 4 1,019 106 TOTAL 2,813 294 NOTE: The waste acceptance schedule does not consider technical attributes, such as the condition of the commercial SNF, that could affect the order and timing in which the Department could accept SNF for disposal. SNF = spent nuclear fuel. To implement transportation in accordance with this schedule, the Department would need to acquire more than 20 NRC-certified transportation casks and associated equipment, including rail rolling stock. While the number of casks required may appear high for such a small inventory of SNF, it is because the SNF at the seven decommissioned reactor sites with existing dry storage facilities is stored in six different types of SNF storage systems, each requiring a specific type of transportation cask system.

Operations-It is anticipated that the Department would store the SNF in NRC-approved storage systems in the same manner that the SNF is currently stored at the decommissioned reactor sites. As noted previous ly, this action would require the acquisition of six different types of storage systems and associated handling equipment. If the site is adjacent to an existing nuclear facility, utilization of the existing operational infrastructure would minimize cost and time before start-up. 5.5 FUNDING 5.5.1 Project Cost and Schedule The Department has developed a preliminary cost estimate and schedule for the development and operation of an interim storage facility, if authorized by Congress, designed to accept and store the approximately 2,800 MTHM of SNF from the nine decommissioned reactor sites (Table 3).

Table 3 shows that if successfully developed, under the assumptions discussed previously, such an interim storage facility could be developed to begin operations in 2015 at the ea rliest and to operate through 2028 at a cost of $743 million. The schedule and estimate assume that the site selected has a preexisting nuclear infrastructure, adequate fundi ng, adequate rail access and an expedited site selection process with no opposition or litigation. Once accepted at the interim storage facility, the SNF would remain on site until it could be delivered to the Yucca Mountain repository without adversely impacting the acceptance of SNF from operating reactors.

Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel Table 3. Estimated Cost and Schedule for Interim Storage of SNF from Decommissioned Nuclear Power Reactors Sites 14 Shutdown Storage Time Estimate 2009 2010 201120122013201420152016201720182019 20202021202220232024202520262027 Siting NWPA Amendment

EIS License Application Licensing Construction Transportation Plan Acquire Operations Ship to Repository Storage Facility Operations Shutdown Storage Cost Estimate 2009 2010 201120122013201420152016201720182019 20202021202220232024202520262027Total Siting $10 $10 EIS/LA/ Licensing

$4 $6 $4 $4 $2 $0 $20 Storage Facility Construction

$4 $6 $10 $20 Storage Overpacks

$12 $19 $25 $32 $88 Transportation Equipment

$72 $72 $144Transportation Operations

$12 $19 $25 $32 $29 $29 $29 $176Storage Facility Operations

$10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $130Site Benefits NWPA Sec.171 $5 $5 $5 $5 $5 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $10 $155 Total $10 $9 $11 $13 $15 $101$123$64 $77 $52 $20 $20 $20 $20 $20 $20 $49 $49 $49 $743NOTE: The waste acceptance schedule does not consider technical attributes, such as the condition of the commercial SNF, that could affect the order and timing in which the Department could accept it for disposal. This estimate also assumes enactment of all necessary legislation, optimal project funding, the issuance of all necessary authorizations and permits, and the absence of litigation-related delays. EIS = environmental impact statement; LA = license application; NWPA = Nuclear Waste Policy Act of 1982, as amended; SNF = spent nuclear fuel.

Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel 5.5.2 Legislative Funding Reform In the absence of statutory language that authorizes the use of the NWF, the Department expects that the use of any funds from the NWF for a limited demonstration program would be subject to challenge. Thus, any legislation should make clear that construction and operation of the interim storage facility is an authorized use of the NWF. In addition, in order to provide for the timely and efficient construction and operation of both the interim storage facility and the Yucca Mountain repository, any legislation should include funding reform that ensures that the Department has prompt access to annual fees and interest deposited in the NWF. In the absence of funding reform, interim storage costs would be part of the Department's budget allocation, which would exacerbate the existing problem of competing for limited resources within the Department's budget allocation. Without funding reform, Congressional appropriators and the administration would need to prioritize each year between other Department activities, Yucca Mountain repository efforts, and the development of an interim storage facility for the acceptance of SNF from the nine decommissioned reactor sites.

Legislation providing direction for interim storage without funding reform would further jeopardize the Yucca Mountain project and increase taxpayer liability. Regardless of whether direction is given to begin accepting SNF from decommissioned reactors, the liability costs incurred by the Department's dela y under the Standard Contract will increase for every year that the repository is delayed. 5.5.3 Impact on the Adequacy of the Fee The inclusion of the development and operations of an interim storage facility for the SNF from decommissioned reactors would increase the total system life cycle costs of the repository program under the NWPA. A new fee adequacy assessment would need to be conducted to assess whether the additional near-term costs of an estimated $743 million would have an impact on the nuclear waste disposal fee. The program would be required to construct both an interim storage facility and a repository simultaneously, resulting in significantly higher near-term expenditures. The adequacy of the fee is based on sufficient investment accumulation for the repository

out-year needs after fee revenue is no longer provided to the government. Near-term increases in funding requirements could result in a negative impact on the adequacy of the 1 mill per kilowatt hour fee currently paid by utilities. 6. CONCLUSION The Department has reviewed its authority to accept SNF from decommissioned nuclear power reactor sites for interim storage and has concl uded that it has no such currently exercisable authority. Legislation is required that would eliminate the limitations in the NWPA on taking commercial SNF for interim storage prior to the opening of the Yucca Mountain repository. In addition, in order to undertake interim storage in a timely and efficient manner, legislation would be needed (1) to direct the Department to take SNF from decommissioned nuclear power reactors as soon as possible; (2) to establish an exped ited siting process; a nd (3) to authorize the Department to construct and opera te the facility under its regulator y authority, or, if the facility 15 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel were to be constructed and operated under an NRC license, to provide for an expedited siting and licensing process. Furthermore, legislation should also provide for funding reform to ensure the Department access each year to the additions to the NWF from fees and interest. Reliable and sufficient funding is necessary for the simultaneous development of the Yucca Mountain repository and an interim storage facility. While moving the SNF from the nine decommissioned commercial nuclear power reactor sites would demonstrate that the Department can move forward prior to the opening of the repository, any reduction in the Department's liability for failing to begin accepting commercial SNF in 1998 would be minimal. The ongoing liability associated with the Department's delay in waste acceptance (currently $11 billion, assuming that operation of the Yucca Mountain repository

begins in 2020) would not be reduced in any sign ificant way and could be increased if providing priority acceptance of the SNF from the nine decommissioned commercial nuclear power reactor sites resulted in additional litigation from contract holders with operating reactors, as well as in demands for acceptance of their SNF at the interim storage facility.

If Congress authorizes the Department to initiate interim storag e for the consolidation of the spent nuclear fuel from decommissioned commercial nuclear power reactors and amends the interim storage siting provisions provided in the Nuclear Waste Policy Act of 1982, as amended, the Department would consider either an exis ting federal site, one or more existing operating commercial nuclear power reactors, or a competitively selected interim storage site, engaging the sites that have volunteered to host Global Nuclear Energy Partnership facilities as part of the competitive process. Authorization and funding by Congress to perform interim storag e would provide the Department an option in addition to Yucca Mountain to allow the Department to begin to meet its contractual obligations with the owners of commercial spent nuclear fuel. This option could

prove beneficial should Yucca M ountain experience delays due to licensing, litigation, lack of funding or other causes, but only if the enabling legislation adequately addresses the issues discussed in this report.

16 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel 7. REFERENCES 10 CFR (Code of Federal Regulations) Part 71.

Energy: Packaging a nd Transportation of Radioactive Material. 10 CFR Part 72. Energy: Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class C Waste.

10 CFR Part 961. Energy: Standa rd Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste.

59 FR 27007. Notice of Inquiry on Waste Acceptance Issues.

60 FR 21793. Office of Civilian Radioactive Waste Management; Nuclear Waste Acceptance Issues. Atomic Energy Act of 1954. 42 U.S.C. 2011 et seq. Atomic Energy Act of 1954, as amended. 42 U.S.C. 2075 et seq.

Consolidated Appropriations Act, 2008.

Public Law No. 110-161. 121 Stat. 1844.

Construction Authorization. 42 U.S.C. 10168 et seq. Domestic Distribution.

42 U.S.C. 2111 et seq.

Energy Reorganization Act of 1972.

Findings and Purposes.

42 U.S.C. 10131 et seq.

Foreign Distribution of Byproduct Ma terial. 42 U.S.C. 2112 et seq. Interim Storage Fund. 42 U.S.C. 10156 et seq. National Environmental Policy Act of 1969. 42 U.S.C. 4321 et seq. Nuclear Waste Fund. 42 U.S.C. 10222 et seq. Nuclear Waste Policy Act of 1982. 42 U.S.C. 10101 et seq.

Policies Contained in International Arrangements. 42 U.S.C. 2152 et seq.

Purpose of Chapter. 42 U.S.C. 2013 et seq.

Research and Development Assistance. 42 U.S.C. 2051 et seq.

Site Selection. 42 U.S.C. 10165 et seq.

Storage of Spent Nuclear Fuel. 42 U.S.C. 10155 et seq. 17 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel Transportation. 42 U.S.C. 10157 et seq. U.S. Congress. House. Committee on Appropriations.

Consolidated Appropriations Act, 2008. 110 th Cong., 1 st sess., 2008. Committee Print.