ML18033B584

From kanterella
Revision as of 23:20, 3 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NPDES Discharge Monitoring Rept for Browns Ferry Units 1,2 & 3 for Nov 1990.
ML18033B584
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/30/1990
From:
TENNESSEE VALLEY AUTHORITY
To:
References
NUDOCS 9012260141
Download: ML18033B584 (16)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM~s 7~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR: 9012260141 DOC.DATE: 90/11/30 NOTARIZED:

NO FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry, Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION

  • Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000259 05000260 05000296

SUBJECT:

"NPDES Discharge Monitoring Rept for Browns Ferry Units 1,2 3 for Nov 1990." DISTRIBUTION CODE: IE48D COPIES RECEIVED:LTR I9 ENCL t SIZE: TITLE: 50.36a(a)(2)

Semiannual Effluent Release Reports NOTES:1 Copy each to: B.Wilson,S.

BLACK 1 Copy each to: S.Black,B.WILSON 1 Copy each to: S.Black,B.WILSON D 05000259 A 05000260 05000296 RECIPIENT ID CODE/NAME KREBS,M.ROSS,T.'NTERNAL:

ACRS IRM-V RE FI 01 RGN2 DRSS/RPB EXTERNAL: BNL TICHLER,J03 NRC PDR NOTES: COPIES LTTR ENCL RECIPIENT ID CODE/NAME HEBDON,F AEOD/DSP/TPAB NRR/DREP/PRPB11 RES BROOKSgB RGN2 FILE 02 EG&G SIMPSON~F COPIES LTTR ENCL IlJ a D D NOTE TO ALL"RIDS" RECIPIENTS:

D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR~ENCL 24 Date of Report Page 1 of DISCHARGE HONITORING REPORT NPDES NUHBER: AL0022080 PERHITTEE INFORHATION'AHE:

TENNESSEE VALLEY AUTHORITY ADDRESS: PSC 1E 50E-C FACILITY HAHE: BROWNS FERRY NUCLEAR PLANT FACILITY CONTACT: HAHE: Abraham Loudermilk PHONE: 632-6656 REPORTING PERIOD.November 1 November 30, 1990 I certify under penalty of law that this discharge monitoring report, required by HPDES Permit Number AL0022080 for the reporting period of November 1 through NovŽe~, 990 and consisting of pages numbered 1 through 9 and which are dated was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

SIGNATURE OF RESPONSIBLE INDIVIDUAL DATE OF SIGNATURE 0052c 90i226014i 90ii30 PDR ADOCK 05000259'PDR ATTACHMENT I ADEH DISCHARGE NN I TOR I NG REPORT l COMPANY: TVA-Brown's Ferry Nuclear Plant DSNOOI)Q MONTHLY LOCATION: U.S.Highway 72 Athens, Alabama 35611 6 Hr Houri MONTH: November, 19 90 EFFECT VE: NPDES NO.AL0022080 MAJOR UN mn//w s+uo oa on asure men r n our s n Uenc 63.0..9 14 63.6~4 8.0.1 8.20 633.6 8.0.6 0.4 57.8<0.0 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Signature of Responsible Official 1663m/2 Date ADEM FORM 261 (8)I/88 ADEN DISCHARGE MONITORING REPORT lKI MONTHLY INNTH: November, 19 90 COMPANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 356II NPDES NO.AL0022080 MAJOR PARAM DSNOOla (Formerl 103)low.0 EFFECT VE: UNITS I/wk/wk e na sIs 0.0 20 28 I certify under penalty of lew that this document end all attachments-wore prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gether and evaluate the Informat'Ion submitted.

Based on my inquiry of the person or persons who menage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge end belief, true, accurate, end complete.I em aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Signature of Responsible Official l663m/4 Date ADEH FORM 26I (B)I/88 ADEM DISCHARGE MONITORING REPORT IKI MONTHLy MONTH: November, I 9 90 COI4'ANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 356II NPDES NO.AL0022080 MAJOR DSNOO b ow.0 2/2/so u ons ca e on are use.e EFFECT VE: IO/en cern ca me a ce res o ca e n erm 5/89 an n I S/R N/R/R l6.028368<5 N//R.0 I certify under penalty of law that this document and al I attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Signature of Responsible Official 1663m/5 Date ADEM FORM 26I (B)I/88

~~

ADEH DISCHARGE MONITORING REPORT IEI MONTHLY MONTH: November, I 9 90 COMPANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 356ll NPDES NO.AL0022080 MAJOR DSNOOIc (Formerl 107).0 I/wk I/wk I/wk EFFECT VE: 44 ca e na sis 28 NO FLOW A G.00144 4 (5 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and Imprisonment for knowing violations.

Signai.ure of Responsible Official l66'5m/7 Date ADEN FORM 261 (B)I/88

~~ai~

ADEH D I SCHARK HON I TOR I NG REPORT gj HONTHLY HONTH: November, I 9 90 COHPANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 356II NPDES NO.AL0022080 HAJOR$%F UNI S DSNOOld (Formerl IIO)ow I w EFFECT VE:.OOOI5<5 l5 T6 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that'ualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitled is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false Information, Including the possibility of fine and imprisonment for knowing violations.

Signature of Responsible Official l663m/8 Date ADEH FORH 26I (8)I/88

~~

ADEH DISCHARGE NNITORING REPORT IKI NNTHLY 7.~1 HONTH: November, l9 90 CO%'ANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 356II NPDES NO.AL0022080 HAJOR DSN002 (Formerl 102)EFFECT VE: mn 0.2 s u l2 e n re ease was s ar on--.e on s re u r or erm na on o re ease s e n.va ue.e s.and 0 K G were taken on IO-3l-90 an re r e on e r I certify under penalty of law that this document and al I attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and bel'Iefp true, accurate, and canplete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Signature of Responsible Official Date ADEN FORH 26I (8)I/88 0'4 s ADEH D I SCHARGE MON ITOR I NG REPORT IKI MONTHLY MONTH: November, l9 90 COMPANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 356ll NPDES NO.AL0022080 MAJOR DSN005 PARAM low EFFECT VE: I wk I wk l4 29 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledae and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Signature of Responsible Official l66>m/6 Date ADEM FORM 26l (B)I/88 ADEH DISCHARGE HONITORING REPORT JEI HONTHLY HONTH: November, I 9 90 COMPANY: TVA-Brown's Ferry Nuclear Plant DSNOII'LOCATION:

U.S.Highway 72 Athens, Alabama 556ll NPDES NO.AL0022080 NAJOR EFFECT VE: Hon 45.0 i%5..0.0.0 5.0 I certify under penalty of Iaw that this document and all attachments were prepared under my direction or supervision ln accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, Including the possibility of fine and imprisonment for knowing violations.

Signature of Responsible Official 1665m/9 Date ADEH FORH 26I (8)I/88 ATTACHMENT 2 NONCOMPLIANCE NOTIFICATION Descri tion of Dischar e and Cause of Noncom liance: The discharge covered by this notification is discharge serial number (DSN)Oll, Permit fP AL002280, Treated Domestic Mastewater Effluent to the Tennessee River from the Browns Ferry Nuclear Plant (BFN).The cause of the noncompliance was thought to be due to unseasonably warm weather followed by a sharp cold spell which led to an algae bloom and subsequent die-off in the lagoon system.Such algae bloom/die-off cycles will affect biochemical oxygen demand (BOD)5 sampling results.This was confirmed through discussions with the laboratory analyst who reported a significant algae bloom in the samples during the five day incubation required for the BOD analysis.Period of Nonco liance: The sewage lagoon was sampled on 10/24/90 and BOD 5 results of 29 and 28 mg/l (duplicate sample)were reported.On 11/14/90 the first sample in November was collected which showed a BOD 5 of 46 mg/l which exceeds the permitted limit of 45 mg/1.BFN was notified of the results of this analysis on 11/20/90 and immediately isolated the discharge from the lagoon.The lagoon was reopened on 11/26/90 to allow collection of the second sample for the month of November as required by the permit and again isolated immediately upon completion of sample collection.

The results of the 11/26/90 sample were 25 mg/1.Because of the time interval between samples and the length of the BOD 5 test, the exact duration of noncompliance cannot be determined, however the maximum duration would be 27 days (10/24-11/20).

Ste s Taken to Eliminate the Noncom liance and Prevent Reocurrence:

Discharge from the lagoon was stopped on 11/20/90 and the lagoon remains isolated, The lagoon will remain isolated until weather conditions stabilize the algae populations in the ponds.Non-operational samples will be collected each two weeks to track BOD 5 levels in the pond, and these results will be plotted over time to attempt to identify BOD 5 trends.Identification of a rising trend in BOD 5 results will allow the pond to be isolated before exceedances of the permit limit.occur.Page 1 of 1 0020N

/