ML18036A479
ML18036A479 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 11/30/1991 |
From: | TENNESSEE VALLEY AUTHORITY |
To: | |
References | |
NUDOCS 9112300032 | |
Download: ML18036A479 (18) | |
Text
ACCELERATED DI UTION DEMON TION SYSTEM 0~'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9112300032 DOC.DATE: 91/11/30 NOTARIZED:
NO DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION
- Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
"ADEM Discharg'e Monitoring Rept for Nov 1991 for Browns Ferry Nuclear Plant." DISTRIBUTION CODE: A048D COPIES RECEIVED:LTR
~ENCL g SIZE: TITLE: OR/Licensing Submittal:
Equipment Qualify'.cation NOTES D RECIPIENT ID CODE/NAME SANDERS,M.
ROSS,T.INTERNAL: ACRS NRR/DET/ESGB 8D OGC/HDS3 RES/DSIR/EIB EXTERNAL: NRC PDR CO PIES TR ENCL 0 1 RECIPIENT ID CODE/NAME HEBDON,F WILLIAMS,J.
NRR/DET/EMEB 7E OC/~EMB"EXILE 01 NSIC COPIES LTTR ENCL D D R D NOTE TO ALL"RIDS" RECIPIENTS:
D D PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:'LTTR
~ENCL 15 Qi(
gt 0">~~'
ATTACHHENT 1 ADEH DISCHARGE HONITORING REPORT]Xi HONTHLY HONTH: November ,19 91 COHPANY TVA-Brown's Ferry Nuclear Plant DSNOO LOCATION: U.S.Highway 72 Athens, Alabama 35611 6 Hr Houri NPDES NO.AL0022080 HAJOR EFFECTIVE.
10/15/89 PARAH AVG Flow Hon Hon Cl TA Amb RT-DRT N/A 90 F 6.0 min N/A N/A 730 Hon 9.0 Tem R Tee N/A N/A N/A N/A 10 F 92 F 93 F 001 6/-Re 2/5/-ort Vi olation s Onl Measure ment Fr e uenc in our ermi t.FRE UNITS Cont HGD 835 1/wk 6/PPD 2/5/1/da oF 67.8 69.7 1/da oF 1.9 1/da oF 1/da oF 70.7 1/wk m/1 835.67.2 69.1 2.4 67.9 835 63.6" 66.0 2.5 65.0 835 62.1 63.6 4.2 64.3 835 7.7 57.3 61.4 4.6 61.6<0.01 835 57 1 60.9 4.1 61.8 835 835 7.8 57.7 61.6 57.7 61.5 4.1 4.0 62.1 61.6<0.01 10 12 13 14 835 835 835 835 835.835 7.9 55.8 53.7 53.1 52 53.0 53.5 59.9 57.9 56.9 56.1 56.0 56.2 4.2 4.4 3.3 3.2 3.0 58.6 58.5 56.5 56.5<0.01 56.3 57.3 15 835 54.2 56.5 2.6 57.1 16 835 5.4 56.9 2.3 59.3 17 835 56.2 58.6 2.3 60.3 18 19 20 835 835 835 7.8 57.3 57 58.3 59.8 60.7 60 2.9 2.8 2.8 61.3 62.0<0.01 63.1 21 22 23 24 835 835 835 835 58.4 60.8 58.3 60.3 57.6 59.4 56.5 58.6 2.4 2.0 2.3 2.3 61.0 60.1 5.6 57.8 25 26 27 835 835 835 7.8 54.1 52.7 56.4 55.5 3.7 3.8 3.2 56.2 55.6<0.01 56.2 835 53.0 55.7 2.7 56.8 29 835 53.7 56.6 3.1 57.30 31 835.55.4 58.0 2.8 60.7 HO AVG 835 7.8 56.8 59.5 3.1 60.1<0.01 835.7 9 67.8 6.7 4.6 70.7<0.01 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system.or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Signature P'lfi63m/2 of Responsible Official 9ii2300032 9iii30 PDR ADOCK 05000259 MR 1 PDR JEST Date ADEN FORH 261 (B)1/88.o'I J l~1 P 1$
ADEH DISCHARGE MONITORING REPORT IXI HONTHLY HONTH: November,19~1 COHPANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 35611 NPOES NO.AL0022080 HA30R OSNODla Form rl 103 EFFECT VE: 10/15/89 PARAH Flow 0&G TSS AVG Mon HAX Mon FRE 1 wk UNITS HGO.00864 15.0 30.0 20.0 100.0 1/wk 1 wk m/1 m/1 22 10 12 13 14 15 16 17.1008.0960<5<5 9 11<5 REPL CATE AN LYSIS 20 21 22 23 24 25 26 27 28.100.0480<5<5 13 HO AVG 0.070 MAX 0.100<5<5 11.2 22 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry manage the system, or those persons directly responsible for gathering the information, the information submitted is, to belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, fine and imprisonment for knowing violations.
accordance with a system of the person or persons who the best of my knowledge and including the possibility of Signature of Responsible Official 1663m/4 Date AOEH FORM 261 (8)1/88 0 t'I ir I J ADEH DISCiiARGE lSNITORING REPORT iXi HONTHLY HONTH: November,19 91 COHPANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 35611 NPDES NO.AL0022080 HAJOR DSNOO b PARAH Flow 0&G TSS 15.0 30.0 AVG Hon Cu T N/A Fe T N/A 2 2 2/Mill be a 1 icable onl wh en chem EFFECT VE: 10/ical me al cle 5/89 anin HAX H n 20.0 100.0 1.0 1.0 ol u ions ar d.The rest lo cated in Perm FRE 1 Ba 2/wk 2 wk 1/Ba 1/Bat UNIT HGD m/1 m/1 m/1 m/1 1.030912 2 NO FLOM 3.014642<5 4.016270 5 NO FLOW 6.031124<5 7 NO FLOW<5<5 8.040216 12.024685 10.00643 11.021454<5 12.008252 13 NO FLOW 14.028346<5 15.002566 16.018077 17.011629 18 NO FLOW 19.0 0458<5 20 NO FLOW 21.025234<5 22.005678 23 NO FLOW 24.031105<5 25 NO FLOW 26 NO FLOW 27.031124<5 28 NO FLOW NO FLOM 30.0012 16 17 10 10 REPLI YSIS ATE ANAL HO AVG.021533<5.6 13.7 HAX.040216 12 29 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Signature of Responsible Official Date ADEH FORH 261 (8)1/88 1663in/5 0'A I 0 ADEH DISCHARGE HONITORING REPORT IXI HONTHLY HONTH: November, 19 91 COHPANY: TVA-Brown's Ferry Nuclear Plant DSNOOlc Formerl 107 LOCATION: U.S.Highway 72 Athens, Alabama 35611 NPDES NO.AL0022080 HAJOR EFFECT VE: 10/15/8 PARAH Flow 0&G TSS AVG Hon Hon 15.0 20.0 30.0 100.0 FRE UNITS 1/wk 1 wk m/1 1 wk m/1.00 24<5<5 5 4 REPLICA E ANALY 10 12 13 14.00540<5 13 20 21 22 23 24 25 26 27 28 30.00270<5.001 6<5 28 HO AVG 0 38<5 11.2.00540<5 28 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Signature of Responsible Official Date AOEH FORH 261 (8)1/88 1663IA/7 0 J%I ADEH DISCHARGE HONITORING REPORT iXi HONTHLY HONTH: November ,19 91 COHPANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 35611 NPDES NO.AL0022080 HARBOR DSNODld Formerl 110 EFFECT VE: 10/15/89 PARAM Flow 0&G TSS AVG Hon Hon 15.0 20.0 30.0 100.0 FRE 1/wk 1/wk 1 wk UNIT MGD m 1.000534<5<5 8 2 REPLI ATE ANALYSIS 10 12 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 30 HO AVG 0144.0021.00180 00148.00216<5<5<5<5 5.2 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Signature of Responsible Official Date ADEH FORH 261 (8)1/88 1663m/8 4,~i I ADEH DISCHARGE HONITORING REPORT COHPANY: TVA-Brown's Ferry Nuclear Plant DSN002 Formerl 102 IXI HONTHLY LOCATION: U.S.Highway 72 Athens, Alabama 35611 HONTH: November ,19 91 NPDES NO.AL0022080 HARBOR EFFECTIVE:
10/15/89 PARAH Fl ow AVG Hon 6.0 min 0&G 15.0 TSS 30.0 H d N/A HAX Mon FRE 1 8 tch 1/Ba 20.0 1 Ba 100.0 0.01 1 Ba 2 Ba UNITS HGD s.u.m/1 m/1 m/1 10 12 13 14 15.303867 16.303867 17.03867 18 20 21 22 23 24 25 26 27 28 29 30 HO AVG.303867 HAX.303867 7.5 7.7 7.9<5<5<5<5 3 3 15 15 REPLICA TE ANALY IS I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Signature of Responsible Official Date ADEH FORH 261 (8)1/88 166301/3
,~I g C~%P*r>>4f ADEH DISCHARGE MONITORING REPORT IX I HONTHLY HONTH: November, 19~1 COHPANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 35611 NPDES NO.AL0022080 HA30R DSN005 PARAH Flow Tem EFFECT VE: 10/15/89 AVG Hon MAX Hon Mon Hon FRE 1/wk 1 wk UNITS HGD oF NOT IN SERVICE FOR TH ENTIRE HO NTH 10 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 30 HO AVG I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Signature of Responsible Official Date AOEH FORM 261 (8)1/88 166301/6
'I I,P E~
ADEH DISCI lARGE HONITORING REPORT IXI HONTHLY HONTH: November ,19~1 COHPANY: TVA-Brown's Ferry Nuclear Plant LOCATION: U.S.Highway 72 Athens, Alabama 35611 NPDES NO.AL0022080 HARBOR PARAH DSN011 Fl w BOD 5 TSS EFFECT VE: 10 15/89 AVG Hon 30.0 0.0 Hon 45.0 135.0 FRE UNITS 5 wk 2/mo HGD m 1.008712 2/mo m/1 10 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 30 HO AVG.005515.005515 005515.005515.008712.005515.005515.005515 14 005515.005515 005515.008712.0 7856.0 7856 26 1248 012802 017856.012802.012802.008712.010225 20.031248 26 15 24 19 24 I certify under penalty of law that this document and all attachments were prepared under my direction or.supervision in designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry manage the system, or those persons directly responsible for gathering the information, the information submitted is, to belief, true, accurate, and complete.I am aware that there are significant penalties for submitting false information, fine and imprisonment for knowing violations.
accordance with a system of the person or persons who the best of my knowledge and including the possibility of Signature of Responsible Official Date ADEH FORH 261 (8)1/88 1663 al/9
~t L