Finding | |
---|---|
Title | Failure to Report a Major Loss of Emergency Assessment Capability |
Description | An NRC-identified SL IV NCV of 10 CFR Part 50.72(b)(3)(xiii) was identified when Entergy failed to make a required event notification within eight hours for a major loss of assessment capability. Specifically, an unplanned loss occurred of all EAL instrumentation associated with Sea Water Bay level that resulted in an inability to evaluate all EALs for an abnormal water level condition. Entergy entered the issue into the CAP as CR-PNP-2015-00949. Compliance was restored on February 5, 2015, when Entergy reported the major loss of assessment capability under Event Notification (EN) 50790. The inspectors determined that Entergys failure to submit an event notification in accordance with 10 CFR 50.72 within the required time was a performance deficiency that was reasonably within Entergys ability to foresee and correct, and should have been prevented. Since the failure to submit a required event report impacts the regulatory process, the violation was evaluated using Section 2.2.4 of the NRCs Enforcement Policy, dated July 9, 2013, instead of the SDP. Using the example listed in Section 6.9.d.9, A licensee fails to make a report required by 10 CFR 50.72 or 10 CFR 50.73, the issue was evaluated and determined to be a SL IV violation. The inspectors reviewed the condition for reactor oversight process significance. Because this NRC-identified violation involves the traditional enforcement process and does not have an underlying technical violation that would be considered more-than-minor, the inspectors did not assign a cross-cutting aspect to this violation in accordance with IMC 0612. |
Site: | Pilgrim |
---|---|
Report | IR 05000293/2015007 Section 4OA5 |
Date counted | Mar 31, 2015 (2015Q1) |
Type: | TEV: Severity level IV |
cornerstone | Emergency Prep |
Identified by: | NRC identified |
Inspection Procedure: | IP 93812 |
Inspectors (proximate) | C Cahill D Schroeder E Burket E Dipaolo H Nieh J Lilliendahl S Pindale T Dunn |
Violation of: | 10 CFR 50.72 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness 10 CFR 50.73 |