Finding | |
---|---|
Title | Untimely Corrective Action |
Description | The team identified a non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to effectively correct deficient procedures regarding the use of clearance orders. A number of clearance-related problems revealed several deficiencies in procedures to ensure that safe tag-out of equipment occurred prior to the start of work, that independent reviews of qualified individuals were being completed during clearance order preparation, and that effective training was being conducted where performance gaps were identified. The licensee failed to correct these deficiencies in a timely manner. The licensee entered this finding in its corrective action program as condition report 53451. The team determined that the failure to correct an adverse trend in the use of clearance orders was a performance deficiency. This finding was more than minor because if left uncorrected, it could lead to a more significant safety concern. Specifically, continued failure to establish the correct clearance order boundaries could result in the loss of configuration control for systems required to maintain nuclear safety. Using Manual Chapter 0609.04, Phase 1 Initial Screening and Characterization of Findings, the team determined that this finding was of very low safety significance (Green) because it was not a design or qualification deficiency, did not represent a loss of system safety function, and did not screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. The team determined that this finding has a cross-cutting aspect in the resources component of the human performance cross-cutting area because the licensee failed to ensure complete, accurate and up-to-date design documentation, procedures, and work packages were available and adequate to support nuclear safety |
Site: | Wolf Creek |
---|---|
Report | IR 05000482/2012007 Section 4OA2 |
Date counted | Jun 30, 2012 (2012Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | C Peabody D Powers K Martin L Willoughby M Williams S Makor T Farina |
CCA | H.7, Documentation |
INPO aspect | WP.3 |
' | |
Finding - Wolf Creek - IR 05000482/2012007 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Wolf Creek) @ 2012Q2