ML18009A865

From kanterella
Revision as of 01:55, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Retyped Tech Specs 3.1.2.2,3.1.2.4 & 3.7.1.1 Re Flow Paths Operating,Charging Pumps Operating & Safety Valves
ML18009A865
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/10/1991
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18009A864 List:
References
NUDOCS 9104170017
Download: ML18009A865 (4)


Text

S~~SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 RETYPED TECHNICAL SPECIFICATION PAGES LIMITING CONDITION FOR OPERATION ACTION REQUIREMENTS 9i04i700i7 9i04l0 PDR ADOCK 05000400 P PDR REACTIVITY CONTROL SYSTEMS FLOW PATHS-OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.2 At least two of the'following three boron injection flow paths shall be OPERABLE: a.The flow path from the boric acid tank via a boric acid transfer pump and a charging/safety injection pump to the Reactor Coolant System (RCS), and b.Two flow paths from the refueling water storage tank via charging/safety injection pumps to the RCS.APPLICABILITY:

MODES 1, 2, and 3~ACTION: With only one of the above required boron injection flow paths to the RCS OPERABLE, restore at least two boron injection flow paths to the RCS to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN as required by Figure 3.1-1 at 200'F within the next 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />s>restore at least two flow paths to OPERABLE status within the next 7 days or be in HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE RE UIREMENTS 4.1.2.2 At least two of the above required flow paths shall be demonstrated OPERABLE: a.At least once per 7 days by verifying that the temperature of, the flow path between the boric acid tank and the charging/safety injec-tion pump suction header tank is greater than or equal to 65'F when a flow path from the boric acid tank is used;b.At least once per 31 days by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position', C~At least once per 18 months during shutdown by verifying that each automatic valve in the flow path actuates to its correct position on a safety injection test signal>and d.At least once per 18 months by verifying that the flow path required by Specification 3.1.2.2a.delivers at least 30 gpm to the RCS.SHEARON HARRIS-UNIT 1 3/4 1-8 Amendment No.

REACTIVITY CONTROL SYSTEMS CHARGING PUMPS-OPERATING LIMITING CONDITION FOR OPERATION 3.1;2.4 At least two charging/safety injection pumps shall be OPERABLE.APPLICABILITY:

MODES 1, 2, and 3.ACTION: With only one charging/safety injection pump OPERABLE, restore at least two charging/safety injection pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN as required by Figure 3.1-1 at 200'F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />;restore at least two charging/safety injection pumps to OPERABLE status within the next 7 days or be in HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE RE UIREMENTS 4.1.2.4 At least two charging/safety injection pumps shall be demonstrated OPERABLE by verifying, on recirculation flow or in service supplying flow to the Reactor Coolant System and reactor coolant pump seals, that a differential pressure across each pump of greater than or equal to 2446 psid is developed when tested pursuant to Specification 4.0.5.SHEARON HARRIS-UNIT 1 3/4 1-10 Amendment No.

3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITING CONDITION FOR OPERATION 3.7.1.1 All main steam line Code safety valves associated with each steam generator shall be OPERABLE with lift settings as specified in Table F 7-2~APPLICABILITY:

MODES 1, 2, and 3.ACTION: a.b.With one or more main steam line Code safety valves inoperable, operation may proceed provided, that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoperable valve is restored to OPERABLE status or the Power Range Neutron Flux High Trip Setpoint is reduced per Table 3.7-1;otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE RE UIREMENTS 4.7.1.1 No additional requirements other than those required by Specification 4.0.5.SHEARON HARRIS-UNIT 1 3/4 7-1 Amendment No.