05000341/FIN-2017010-01

From kanterella
Revision as of 15:05, 30 September 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
01
Site: Fermi DTE Energy icon.png
Report IR 05000341/2017010 Section 1R21
Date counted Jun 30, 2017 (2017Q2)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.21
Inspectors (proximate) A Dahbur
I Khan
J Robbins
M Greenleaf
M Jeffers
Violation of: 10 CFR 50 Appendix B Criterion III, Design Control
INPO aspect
'