Pages that link to "ML20215C523"
Jump to navigation
Jump to search
The following pages link to ML20215C523:
Displayed 8 items.
- ML20211N663 (← links)
- PNO-III-87-044C, on 870405,unit Completed Testing Activities at 30% Level & Increased Power at 45% for Further Testing & Review.Power Held at 45% for Repair of Valve in Cooling Tower Sys & Oil Flow in Main Feedwater Pump Bearing (← links)
- PNO-III-87-044B, on 870403,unit Tied to Util Electrical Grid for First Time Since 860519 Reactor Trip.Licensee Began Plant Startup on 870327 But Returned to Cold Shutdown to Replace Failed Nuclear Instrument (← links)
- PNO-III-87-044, on 870326,licensee Formally Requested Region III to Allow Restart of Unit.On 870327,region Issued Confirmatoru Action Ltr Permitting Restart & Power Ascension Program.Instrument Channel Malfunctioned During Preparation (← links)
- PNO-III-87-044A, on 870327,after Attempted Critical Approach, Plant Taken Back to Cold Shutdown to Replace Nuclear Instrument Detector Which Did Not Indicate Properly.Work Should Be Completed by 870401 (← links)
- PNO-III-83-098A, on 831116 Licensee Informed That eddy-current Exam of All Tubes in Both SG Using New High Sensitivity Probe W/Continued Identification of Crack Indications Essentially Completed (← links)
- PNO-III-86-049A, on 860519,reactor Trip Occurred Resulting in Multiple Equipment Failures Which Hindered Operator Response Due to Previous Equipment Problems.Augmented Investigation Team Completed Review on 860525 (← links)
- ML20059G207 (← links)