Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20024C816 | 15 November 1978 | Informs That Toledo Edison Needs to Reduce Auxiliary Feedwater Setpoints for Natural Circulation.Suggestion to Resolve Impasse Provided.Further Analytical Effort Required to Confirm 10 Ft Level Setpoint Adequate | |
ML20054E923 | 10 June 1982 | Board Notification:Notifying of Drywell to Wetwell Vacuum Breakers Which Can Be Subj to air-clearing Load Resulting from Pool Swell Following Postulated Loca.Components Can Be Overstressed by Impact Load | |
ML20054G582 | 15 June 1982 | Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components | |
ML20054G587 | 12 May 1982 | Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful | |
ML20054H139 | 17 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054H412 | 18 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054J024 | 17 June 1982 | Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program | |
ML20054J579 | 24 June 1982 | Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use | |
ML20054J856 | 23 June 1982 | Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures | |
ML20054K369 | 26 January 1982 | Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201 | Scram Discharge Volume |
ML20054K671 | 25 June 1982 | Releases Public Version of Administrative Memo Re Emergency Duty Officer & Other Emergency Duties | |
ML20054K958 | 15 June 1982 | Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology | |
ML20054M214 | 9 November 1981 | Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works | |
ML20054M330 | 6 July 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedure | |
ML20054M362 | 2 July 1982 | Releases Public Version of Revision to Emergency Plan | |
ML20055A262 | 21 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl | |
ML20055A263 | 21 January 1981 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A269 | 27 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline | |
ML20055A270 | 28 January 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A275 | 10 February 1982 | Forwards Info Re Current Status of Exemption Requests for Alert & Notification Sys | Exemption Request |
ML20055A277 | 12 February 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline | Exemption Request |
ML20055B241 | 13 July 1982 | Releases Public Version of Temporary Mod Request for Emergency Plan Supporting Procedure | |
ML20055C352 | 26 February 1990 | Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility | |
ML20057F131 | 7 October 1993 | Notification of 931020 Meeting W/Util in Rockville,Md to Discuss Davis-Besse Implementation of Reg Guide 1.97 for Steam Generator Pressure Instruments | |
ML20058B378 | 6 July 1982 | Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA | |
ML20059D271 | 6 August 1990 | Discusses Review of State of Oh & Local Radiological Emergency Response Plans.Determined That No Issues Identified During 890809-09 Exercise to Prevent Finding of Reasonable Assurance for Site | Earthquake Chernobyl |
ML20059H836 | 19 January 1994 | Notification of 940201 Meeting W/Util in Rockville,Md to Discuss Pending Davis-Besse Licensing Actions | |
ML20062A060 | 28 July 1982 | Releases Public Version of Revised Emergency Plan Administrative Procedure | |
ML20062B307 | 28 July 1982 | Releases Public Version of Revised Emergency Plan Administrative Procedure | |
ML20062B565 | 30 July 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedures | |
ML20062D329 | 29 July 1982 | Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA | |
ML20062D472 | 2 August 1982 | Releases Public Version of Revision to Emergency Plan Administrative Procedure | |
ML20062E042 | 2 August 1982 | Releases Public Version of Revision to Emergency Plan Supporting Procedures Administrative Memo | |
ML20062E062 | 2 August 1982 | Releases Public Version of Revision to Emergency Plan Administrative Procedure | |
ML20062E079 | 29 July 1982 | Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEA | Reserve Station Service Transformer |
ML20062E162 | 20 July 1982 | Board Notification 82-70:notifies of Differing Prof Opinion Re Sensitization of BWR Stainless Steel Weldments | |
ML20062F120 | 5 August 1982 | Releases Public Version of Revision to Administrative Memo | |
ML20062F826 | 15 December 1978 | Responds to 781011 Memo Requesting Quantitative Comparison of Advantages Provided by Addl Relief Valves for Subj Facil. Forwards Memo Which Finds Enhanced Cooldown Is Worthwhile | |
ML20062F834 | 12 December 1978 | Forwards Eval by Gs Lellouche of EPRI Using WASH-1400 Methodology Which Concludes That Addition of Relief Valves in Pwr'S to Relieve Pressure Surges from ATWS May Increase Risk to Public | |
ML20062P044 | 10 January 1980 | Discusses B&W Overfeed Transient Analysis Using IRT Deck Simulating Facilities.Figures 1-9 Re Computed Transient Results Encl | Coast down |
ML20071F192 | 9 June 1981 | Forwards 810602 Rept Re Feedwater Pump Trip Compiled by F Witkowsky & J Daugherty.Handwritten Notes on Various Subjs Encl | |
ML20072L699 | 27 September 1982 | Discusses March Analysis of Hydrogen Burn During Degraded Core Accidents for Facilities.Detailed Comparisons of Facility Design Parameters W/Gessar & Grand Gulf Encl | |
ML20072T350 | 3 June 1982 | Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117).Proposed Resolutions Listed.Notice of Violation & Excavation Plan Encl | Nondestructive Examination Liquid penetrant |
ML20072T360 | 16 April 1982 | Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117),per 820415 Meeting.Proposed Resolutions Listed.Related Info Encl | Nondestructive Examination Liquid penetrant |
ML20079R085 | 15 March 1978 | Forwards Feb Project Status Repts |