05000306/LER-1978-019, Forwards LER 78-019/03L-0 | 12 October 1978 | Forwards LER 78-019/03L-0 | |
05000306/LER-1978-024, Forwards LER 78-024/03L-0 | 25 January 1979 | Forwards LER 78-024/03L-0 | |
05000306/LER-1982-009, Forwards LER 82-009/03L-0 | 4 June 1982 | Forwards LER 82-009/03L-0 | |
05000306/LER-1982-010, Forwards LER 82-010/01T-0 | 2 July 1982 | Forwards LER 82-010/01T-0 | |
05000306/LER-1982-012, Forwards LER 82-012/03L-0 | 30 July 1982 | Forwards LER 82-012/03L-0 | |
05000306/LER-1982-013, Forwards LER 82-013/03L-0 | 18 August 1982 | Forwards LER 82-013/03L-0 | |
05000306/LER-1982-014, Forwards LER 82-014/03L-0 | 24 August 1982 | Forwards LER 82-014/03L-0 | |
05000306/LER-1982-017, Forwards LER 82-017/03L-0 | 8 October 1982 | Forwards LER 82-017/03L-0 | |
05000306/LER-1982-027, Forwards LER 82-027/03L-0 | 5 January 1983 | Forwards LER 82-027/03L-0 | |
05000306/LER-1983-002, Forwards LER 83-002/03L-0 | 18 March 1983 | Forwards LER 83-002/03L-0 | |
05000306/LER-1983-004, Forwards LER 83-004/03L-0 | 24 March 1983 | Forwards LER 83-004/03L-0 | |
05000306/LER-1995-002, Forwards LER 95-002 Re Rt While Subcritical Caused by Personnel Error | 19 July 1995 | Forwards LER 95-002 Re Rt While Subcritical Caused by Personnel Error | |
05000306/LER-1995-003, Forwards LER 95-003 Re Unplanned auto-start of AFW Pump Due to Faulty Adjustment of Circuit Breaker Cell Switch.Maint Procedure Will Be Revised to Include Taking Off Switch Cover & Performing Visual Insp of Contact Wipe | 26 July 1995 | Forwards LER 95-003 Re Unplanned auto-start of AFW Pump Due to Faulty Adjustment of Circuit Breaker Cell Switch.Maint Procedure Will Be Revised to Include Taking Off Switch Cover & Performing Visual Insp of Contact Wipe | |
05000306/LER-1997-001, Forwards LER 97-001-00 Re Transport of Heavy Load Over Irradiated Fuel or Safe SD Equipment W/O Establishing Required Conditions.Event Reported Via Emergency Emergency Notification Sys IAW 10CFR50.72 on 970207 | 17 March 1997 | Forwards LER 97-001-00 Re Transport of Heavy Load Over Irradiated Fuel or Safe SD Equipment W/O Establishing Required Conditions.Event Reported Via Emergency Emergency Notification Sys IAW 10CFR50.72 on 970207 | Safe Shutdown |
05000306/LER-1997-004, Forwards LER 97-004-00 Re Plant Shutdown Due to Greater than Allowable Leakage from Maint Airlock Per Ts.Commitment Made by Util Listed | 27 October 1997 | Forwards LER 97-004-00 Re Plant Shutdown Due to Greater than Allowable Leakage from Maint Airlock Per Ts.Commitment Made by Util Listed | |
05000306/LER-1997-005, Forwards LER 97-005-00 Re Sudden Pressure Lockout of Number 10 Transformer Which Resulted in Auto Load Rejection/ Restoration on SR Bus on 971117 | 17 December 1997 | Forwards LER 97-005-00 Re Sudden Pressure Lockout of Number 10 Transformer Which Resulted in Auto Load Rejection/ Restoration on SR Bus on 971117 | |
05000306/LER-1998-001, Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980121 | 20 February 1998 | Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980121 | |
05000306/LER-1998-002, Forwards LER 98-002-01,re Defect in Primary Sys Pressure Boundary Observed on Motor Tube Base of Part Length CRDM Housing.Commitments Made within Ltr,Encl | 22 May 1998 | Forwards LER 98-002-01,re Defect in Primary Sys Pressure Boundary Observed on Motor Tube Base of Part Length CRDM Housing.Commitments Made within Ltr,Encl | |
05000306/LER-1998-003, Forwards LER 98-003-00 Re Inadequate App R Fire Barriers & Unsealed Fire Barrier Penetrations.Licensee Made Four New Commitments,Indicated as Corrective Action Statements in Italics | 25 June 1998 | Forwards LER 98-003-00 Re Inadequate App R Fire Barriers & Unsealed Fire Barrier Penetrations.Licensee Made Four New Commitments,Indicated as Corrective Action Statements in Italics | Fire Barrier |
05000306/LER-1998-006, Forwards LER 98-006-00 Re Unplanned Actuation of ESF Equipment During Performance of Sp Due to Personnel Error. Event Was Reported Via ENS IAW 10CFR50.72 on 981219.Two New Commitments Are Indicated as C/A Statements | 18 January 1999 | Forwards LER 98-006-00 Re Unplanned Actuation of ESF Equipment During Performance of Sp Due to Personnel Error. Event Was Reported Via ENS IAW 10CFR50.72 on 981219.Two New Commitments Are Indicated as C/A Statements | |
AECM-88-0131, Forwards Summary of Completed & Planned Notification & Consultation Activities.Systemwide Communication Plan Under Development for Consolidation Effort,Including Development of New Publication to Update Employees on Progress | 29 June 1988 | Forwards Summary of Completed & Planned Notification & Consultation Activities.Systemwide Communication Plan Under Development for Consolidation Effort,Including Development of New Publication to Update Employees on Progress | |
CY-86-037, FOIA Request for IE Manual Chapter 2955 as Ref on Page 2 of Attached SECY-86-37,draft NRC Manual Chapter 0516 as Ref in from NRC to NSP & NRC Manual Chapter 0516 as Ref in NRR Ofc Ltr 44,Rev 1 | 4 October 1995 | FOIA Request for IE Manual Chapter 2955 as Ref on Page 2 of Attached SECY-86-37,draft NRC Manual Chapter 0516 as Ref in from NRC to NSP & NRC Manual Chapter 0516 as Ref in NRR Ofc Ltr 44,Rev 1 | Systematic Assessment of Licensee Performance |
ML111651195 | 11 April 1980 | Forwards Proprietary & Nonproprietary Versions of Structural Analysis of RCS for Postulated LOCA, Preliminary Issue.Applications for Withholding Encl. Proprietary Version Withheld (Ref 10CFR2.790) | |
ML112970834 | 23 October 1981 | Forwards Annual Financial Rept for 1980 & Schedule Showing Cash Flow Generated in 1980 & Projected Flow for 1981,per Reg Guide 9.4 | |
ML113190752 | 16 December 1981 | Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 1.1.2 Re notifications,1.1.4 Re Emergency Organization Records & 1.1.5 Re Startup & Operation of Emergency Offsite Facility | |
ML113190788 | 1 April 1982 | Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.5 Re Startup & Operation of Emergency Offsite Facility & EPIP 1.1.15 Re Transition to Recovery Phase | |
ML113190791 | 11 May 1982 | Forwards Public Version of Revision 4 to Corporate Emergency Response Plan,Consisting of Changes Requested in NRC 811217 Ltr Re Prairie Island Emergency Preparedness Appraisal | |
ML113190826 | 8 October 1982 | Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.1 Re Corporate Emergency Response Organization,Epip 1.1.2 Re Notifications & EPIP 1.1.3 Re Public Info | |
ML113190849 | 20 January 1983 | Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.5 Re Startup Operation of Emergency Offsite Facility & EPIP 1.1.6 Re Emergency Organization Shift Turnover | |
ML17207A179 | 8 March 1979 | Forwards Oversized Suppl Ref Drawings (Piping Isometric, Controlled Copy 1 & Piping & Instrument Controlled Copy 7), Per Reg Guide 1.70,Revision 2.These Drawings Replace All Previous Submittals | Grab sample |
ML17320A971 | 6 March 1984 | Forwards First Round Questions Following Evaluation of Exxon Rept, Steam Tube Rupture Incident at Prairie Island Unit 1, PTSPWR2 Vs Data,Preliminary Benchmark Analysis. | |
ML18037A343 | 20 May 1981 | Notifies That Participation of Licensees W/Oswego County Officials Re Fullscale & Medical Exercise Will Be on Rotational Basis Due to Proximity of Facilities | |
ML18043A874 | 27 July 1979 | Forwards Fee for Steam Generator Tube Surveillance Tech Spec Change,Inadvertently Omitted from 790726 Submittal | |
ML18044A546 | 15 February 1980 | Informs That Dp Hoffman Replaces DA Bixel as Nuclear Licensing Administrator,Effective 791101 | |
ML18044A620 | 7 March 1980 | Forwards Annual Rept to Shareholders,1979. | |
ML18044A776 | 18 April 1980 | Forwards Util 800318 News Release Indicating Changes in Project,Engineering & Const Organization.Will Submit Revisions to QA Program by 800430 to Incorporate Organizational Changes | |
ML18044A839 | 1 May 1980 | Forward CPC-1-A, QA Program Manual for Nuclear Power Plants, Vol 1 - Policies,Revision 9.Revision Incorporates Organization Changes | |
ML18045A289 | 27 June 1980 | Discusses Proposed Change to 10CFR50 Adding Requirement for Fire Protection Plan at Facilities.Forwards Comments on Rule,Supplementing Consultant Comments.Questions Appropriateness of Rule,Since Rule Reopens Resolved Issues | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Emergency Lighting Fire Protection Program |
ML18046A372 | 9 February 1981 | Forwards Vol 1,Revision 10,to QA Program | |
ML18046A509 | 16 March 1981 | Confirms Telcon Re 810320 Meeting W/Ofc of Nuclear Reactor Regulation to Discuss Items Re Upgrading Licensee QA Topical Rept | |
ML18046B304 | 19 February 1982 | Forwards Palisades Emergency Info Brochure,Portraying How Emergency Info Program Is Evolving & Being Utilized as Guide for Establishing Midland Program,Per NRC 811027 Request | |
ML18047A349 | 1 June 1982 | Forwards EPRI PWR Safety & Relief Valve Test Program,Power Operated Relief Valve Block Valve Info Package, in Response to NUREG-0737,Item II.D.1.B,as Discussed at 810717 Meeting W/Nrc | |
ML18051A264 | 7 January 1983 | Submits Comments on Draft Final Rept for Value Impact Analysis of Recommendations Re Steam Generator Tube Degradations & Rupture Events,Per Generic Ltr 82-32 | |
ML18059A650 | 30 December 1993 | Requests to Review Environ Documentation NRC Used to Determine Action,W/Regard to Proposed Dry Cask Storage Proposal for Palisades & Prairie Island Nuclear Power Plants Not Having Significant Impact on Human or Natural Environ | |
ML18139C135 | 1 December 1982 | Notifies That Neither Facility Has Addl Tech Specs to Be Submitted,In Response to Generic Ltr 82-16 Re Status of NUREG-0737 Items | |
ML19207A314 | 13 August 1979 | Forwards Monthly Operating Rept for Jul 1979 | |
ML19207A380 | 29 June 1979 | Urges NRC to Reject 790618 Request of Mn Pollution Control Agency to Reopen Record of Spent Fuel Pool Mod Proceeding. Matter Can Be Resolved by Generic Rulemaking Rather than Piecemeal Adjudication | |
ML19207A929 | 12 July 1979 | Notifies That Exemptions Are Approved in Amend Fee Classes I-III as Result of Upgraded STS Program.All Amends Under Program Expected to Fall in Fee Classes I-III.Exemptions Should Provide Addl Incentive for Program | |
ML19207B807 | 31 August 1979 | Notifies of RO 79-25:on 790829,during Review of Walkdown Insp Repts for IE Bulletin 79-14,Unit 2 Auxiliary Feedwater Piping Hangar 2AFWH-34 Was Found Not Completely Installed. Unit Shutdown Initiated & Hangar Made Operable | |
ML19207B812 | 31 August 1979 | Notifies That B&W Test Spec Revised to Require Continuity Check of Reactor Protection Sys Cabinets to Assure That No Loss of Grounding Has Occurred & to Obtain Baseline Data. Next Rept Due by 800111 |