Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BVY-94-132, Submits Required Rept Summarizing Licensees Evaluation for 1994 Re Bulk Chlorine Rail Shipments,Per Amend 132 to License DPR-2830 December 1994Submits Required Rept Summarizing Licensees Evaluation for 1994 Re Bulk Chlorine Rail Shipments,Per Amend 132 to License DPR-28
BVY-95-100, Forwards Vermont Yankee Nuclear Power Corp 1994 Annual Rept11 September 1995Forwards Vermont Yankee Nuclear Power Corp 1994 Annual Rept
BVY-95-101, Forwards Vermont Yankee Nuclear Power Station Cycle 18 COLR, Rev 212 September 1995Forwards Vermont Yankee Nuclear Power Station Cycle 18 COLR, Rev 2
BVY-95-102, Documents Actions Taken by Util to Evaluate,W/O Immediate Code Repair,Small Leak in Svc Water Piping at Plant & Requests Relief from Requirement to Perform Immediate Code Repair,In Accordance W/Gl 90-05 & 10CFR50.55a(g)(6)(i)15 September 1995Documents Actions Taken by Util to Evaluate,W/O Immediate Code Repair,Small Leak in Svc Water Piping at Plant & Requests Relief from Requirement to Perform Immediate Code Repair,In Accordance W/Gl 90-05 & 10CFR50.55a(g)(6)(i)
BVY-95-107, Transmits 60 Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gates Valves16 October 1995Transmits 60 Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gates Valves
BVY-95-110, Forwards Missed Safety Evaluation Summaries Re Cycle 16 Operating Rept as Required by 10CFR50.59(b)(2)6 November 1995Forwards Missed Safety Evaluation Summaries Re Cycle 16 Operating Rept as Required by 10CFR50.59(b)(2)Temporary Modification
Earthquake
BVY-95-111, Forwards Vermont Yankee Cycle 17 Operating Rept27 October 1995Forwards Vermont Yankee Cycle 17 Operating Rept
BVY-95-114, Provides Addl Info Re GL 88-20, IPE for Severe Accident Vulnerabilities 10CFR50.54(f)27 October 1995Provides Addl Info Re GL 88-20, IPE for Severe Accident Vulnerabilities 10CFR50.54(f)Mission time
Probabilistic Risk Assessment
Temporary Modification
Weak link
BVY-95-115, Forwards Validation Rept YAEC-1926, Method for Power/Flow Exclusion Region Calculation Using LAPUR5 Computer Code, Per NRC 950330 SER Re Thermal Hydraulic Stability31 October 1995Forwards Validation Rept YAEC-1926, Method for Power/Flow Exclusion Region Calculation Using LAPUR5 Computer Code, Per NRC 950330 SER Re Thermal Hydraulic Stability
BVY-95-119, Submits Correction to Ltr Submitting YAEC-1926, Yankee Atomic Electric Co Application of BWROG Stability Exclusion Region Methodology for Implementation of Long Term Solution Option 1-D at Vermont Yankee Nuclear Power Plant3 November 1995Submits Correction to Ltr Submitting YAEC-1926, Yankee Atomic Electric Co Application of BWROG Stability Exclusion Region Methodology for Implementation of Long Term Solution Option 1-D at Vermont Yankee Nuclear Power Plant
BVY-95-120, Informs of Plans to Proceed W/Implementation of Seismic Portion of IPE of External Events,In Response to Suppl 5 to GL 88-207 November 1995Informs of Plans to Proceed W/Implementation of Seismic Portion of IPE of External Events,In Response to Suppl 5 to GL 88-20
BVY-95-122, Confirms Intent to Proceed W/Full Conversion of Custom TSs to Improved Tss,Based on NUREG-1433,rev 113 November 1995Confirms Intent to Proceed W/Full Conversion of Custom TSs to Improved Tss,Based on NUREG-1433,rev 1
BVY-95-123, Provides 30 Day Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode16 November 1995Provides 30 Day Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling ModeTemporary Modification
Foreign Material Exclusion
BVY-95-124, Responds to NRC Re Violations Noted in Insp Rept 50-271/95-22 on 950918-29.Corrective Actions:Util Will Perform Focussed & Comprehensive Review of IST Program Scope to Verify Compliance W/Asme/Ansi OMa-1988 Parts 1,6 & 1016 November 1995Responds to NRC Re Violations Noted in Insp Rept 50-271/95-22 on 950918-29.Corrective Actions:Util Will Perform Focussed & Comprehensive Review of IST Program Scope to Verify Compliance W/Asme/Ansi OMa-1988 Parts 1,6 & 10Power-Operated Valves
Power Operated Valves
BVY-95-125, Responds to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity17 November 1995Responds to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity
BVY-95-126, Documents Actions Taken by Util to Evaluate Small Leak in Svc Water Piping & Request Relief from Requirement to Perform Immediate Code Repair,Per GL 95-051 December 1995Documents Actions Taken by Util to Evaluate Small Leak in Svc Water Piping & Request Relief from Requirement to Perform Immediate Code Repair,Per GL 95-05
BVY-95-137, Advises of Intention to Implement Formal Industry Position on Severe Accident Mgt by 98123120 December 1995Advises of Intention to Implement Formal Industry Position on Severe Accident Mgt by 981231
BVY-95-138, Responds to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode18 December 1995Responds to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling ModeForeign Material Exclusion
BVY-95-139, Forwards Rev 3 of Cycle 18,COLR, for VT Yankee Power Station14 December 1995Forwards Rev 3 of Cycle 18,COLR, for VT Yankee Power Station
BVY-95-140, Documents Revised Submittal Date for USI A-46 Effort from 951231 to 96033129 December 1995Documents Revised Submittal Date for USI A-46 Effort from 951231 to 960331Safe Shutdown
BVY-95-141, Forwards 1995 Rept in Accordance w/10CFR50.46(a)(3)(ii) for Plant & Summary of Transition from Using GE Safe/Reflood ECCS Methodology to Using NRC Approved RELAP5YA Evaluation Methodology29 December 1995Forwards 1995 Rept in Accordance w/10CFR50.46(a)(3)(ii) for Plant & Summary of Transition from Using GE Safe/Reflood ECCS Methodology to Using NRC Approved RELAP5YA Evaluation Methodology
BVY-95-142, Documents Completion of MOV Program in Accordance W/ Requirements of GL 89-1029 December 1995Documents Completion of MOV Program in Accordance W/ Requirements of GL 89-10
BVY-95-144, Submits Response to Violations Noted in Insp Rept 50-271/95-23.Corrective Actions:Util Performed Radiography of Valves on 951105,verified Closure Capability & Compliance W/Requirements of Subsection 4.3.2.4(a) of OM-1029 December 1995Submits Response to Violations Noted in Insp Rept 50-271/95-23.Corrective Actions:Util Performed Radiography of Valves on 951105,verified Closure Capability & Compliance W/Requirements of Subsection 4.3.2.4(a) of OM-10
BVY-96-101, Forwards FFD Program at Vermont Yankee for Jan-June 1996. Evaluation & Analysis of Data,Encl29 August 1996Forwards FFD Program at Vermont Yankee for Jan-June 1996. Evaluation & Analysis of Data,EnclFitness for Duty
BVY-96-102, Forwards Revised Pp 232 of Proposed Change 187 Re Core Shutdown Margin30 August 1996Forwards Revised Pp 232 of Proposed Change 187 Re Core Shutdown MarginShutdown Margin
BVY-96-105, Provides Util Plans for Insp of RPV Shell Welds at Plant During Refueling Outage on 96090610 September 1996Provides Util Plans for Insp of RPV Shell Welds at Plant During Refueling Outage on 960906
BVY-96-107, Responds to NRC Re Violations Noted in Insp Rept 50-271/96-07.Corrective Actions:Completed Addl Training of Design Engineering Staff,Completed Review of Current Design Change & Performed Engineering Evaluation23 September 1996Responds to NRC Re Violations Noted in Insp Rept 50-271/96-07.Corrective Actions:Completed Addl Training of Design Engineering Staff,Completed Review of Current Design Change & Performed Engineering Evaluation
BVY-96-109, Provides Revised TS Pages to Change 186,indicating That New Safety Limit MCPR Valid Only for Util Cycle 1917 September 1996Provides Revised TS Pages to Change 186,indicating That New Safety Limit MCPR Valid Only for Util Cycle 19Minimum Critical Power Ratio
BVY-96-110, Informs of Intention to Inspect Core Spray Sys Internal to Rv,Per NRC Bulletin 80-1325 September 1996Informs of Intention to Inspect Core Spray Sys Internal to Rv,Per NRC Bulletin 80-13
BVY-96-111, Documents Info Provided During Re License Change Requested That We Revise P. 278 Reference to Include Word Legible in Section 6.13.A.325 September 1996Documents Info Provided During Re License Change Requested That We Revise P. 278 Reference to Include Word Legible in Section 6.13.A.3Annual Radioactive Effluent Release Report
BVY-96-117, Informs That Noted Guidance Has Been Incorporated Into Util Plans for App R Corrective Actions in Response to Violations Noted in Insp Rept 50-271/95-268 October 1996Informs That Noted Guidance Has Been Incorporated Into Util Plans for App R Corrective Actions in Response to Violations Noted in Insp Rept 50-271/95-26Exemption Request
BVY-96-118, Forwards Rept Re Core Spray Sys Insp Conducted at Util During 1996 Refueling Outage9 October 1996Forwards Rept Re Core Spray Sys Insp Conducted at Util During 1996 Refueling Outage
BVY-96-119, Forwards Rev 2 to Calculation YAEC-25Q-301, Flaw Evaluation for UT Indication Using Appenda Program9 October 1996Forwards Rev 2 to Calculation YAEC-25Q-301, Flaw Evaluation for UT Indication Using Appenda Program
BVY-96-121, Responds to Concerns Expressed Re Util EOP Program as Identified in Insp Rept 50-271/96-0516 October 1996Responds to Concerns Expressed Re Util EOP Program as Identified in Insp Rept 50-271/96-05
BVY-96-123, Forwards Summary of Evaluation of Intention to Redesignate Several Core Spray & Residual Heat Removal Sys Containment Isolation Valves at Vermont Yankee15 October 1996Forwards Summary of Evaluation of Intention to Redesignate Several Core Spray & Residual Heat Removal Sys Containment Isolation Valves at Vermont Yankee
BVY-96-126, Forwards Revised TS Pages 89,89a & 90 to Incorporate Changes from Amends 148 & 149 to License DPR-28,as Discussed W/Nrc17 October 1996Forwards Revised TS Pages 89,89a & 90 to Incorporate Changes from Amends 148 & 149 to License DPR-28,as Discussed W/NrcShutdown Margin
BVY-96-128, Reports Status of Efforts & Provides Update of Commitment to Achieve Compliance W/Inservice Test Requirements by 96100118 October 1996Reports Status of Efforts & Provides Update of Commitment to Achieve Compliance W/Inservice Test Requirements by 961001
BVY-96-129, Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.421 October 1996Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4
BVY-96-130, Submits App R Fire Area Matrix,Specifying Station Shutdown Methods,Capabilities & Compensatory Actions for pre-outage22 October 1996Submits App R Fire Area Matrix,Specifying Station Shutdown Methods,Capabilities & Compensatory Actions for pre-outageContinuous fire watch
Fire Watch
BVY-96-133, Informs NRC of Addl App R Compensatory Measures28 October 1996Informs NRC of Addl App R Compensatory MeasuresExemption Request
Fire Watch
BVY-96-134, Submits Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode31 October 1996Submits Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode
BVY-96-135, Responds to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs. Provides Info Requested Re Actions Taken to Reduce Potential for ECCS Strainer Clogging31 October 1996Responds to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs. Provides Info Requested Re Actions Taken to Reduce Potential for ECCS Strainer CloggingForeign Material Exclusion
BVY-96-136, Advises That Results of Evaluation Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days30 October 1996Advises That Results of Evaluation Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days
BVY-96-139, Forwards Response to RAI Re 10CFR50,Appendix R Exemptions4 November 1996Forwards Response to RAI Re 10CFR50,Appendix R Exemptions
BVY-96-140, Advises to Remove J Thayer from List of Recipients of NRC Correspondence & to Add Re Mccullough.Addresses,Listed8 November 1996Advises to Remove J Thayer from List of Recipients of NRC Correspondence & to Add Re Mccullough.Addresses,Listed
BVY-96-143, Provides Requested Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Mov15 November 1996Provides Requested Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Mov
BVY-96-144, Forwards 10CFR50.59 Evaluation Re Core Spray & RHR Containment Isolation Valves at Plant15 November 1996Forwards 10CFR50.59 Evaluation Re Core Spray & RHR Containment Isolation Valves at PlantAbnormal operational transient
BVY-96-145, Responds to RAI Re Request for Exemption from Requirement of 10CFR50,App R,Section Iii.G to Permit Use of Rockbestos Firezone15 November 1996Responds to RAI Re Request for Exemption from Requirement of 10CFR50,App R,Section Iii.G to Permit Use of Rockbestos FirezoneSafe Shutdown
Fire Barrier
Exemption Request
BVY-96-151, Informs That Installation of Improved Fire Protection Sys Will Be Completed by 961231 Instead of 96113027 November 1996Informs That Installation of Improved Fire Protection Sys Will Be Completed by 961231 Instead of 961130
BVY-96-152, Responds to RAI Re Request for Exemption for 10CFR50,App R, Section Iii.G27 November 1996Responds to RAI Re Request for Exemption for 10CFR50,App R, Section Iii.GSafe Shutdown
Fire Barrier
Exemption Request
Fire Watch