BVY-94-132, Submits Required Rept Summarizing Licensees Evaluation for 1994 Re Bulk Chlorine Rail Shipments,Per Amend 132 to License DPR-28 | 30 December 1994 | Submits Required Rept Summarizing Licensees Evaluation for 1994 Re Bulk Chlorine Rail Shipments,Per Amend 132 to License DPR-28 | |
BVY-95-100, Forwards Vermont Yankee Nuclear Power Corp 1994 Annual Rept | 11 September 1995 | Forwards Vermont Yankee Nuclear Power Corp 1994 Annual Rept | |
BVY-95-101, Forwards Vermont Yankee Nuclear Power Station Cycle 18 COLR, Rev 2 | 12 September 1995 | Forwards Vermont Yankee Nuclear Power Station Cycle 18 COLR, Rev 2 | |
BVY-95-102, Documents Actions Taken by Util to Evaluate,W/O Immediate Code Repair,Small Leak in Svc Water Piping at Plant & Requests Relief from Requirement to Perform Immediate Code Repair,In Accordance W/Gl 90-05 & 10CFR50.55a(g)(6)(i) | 15 September 1995 | Documents Actions Taken by Util to Evaluate,W/O Immediate Code Repair,Small Leak in Svc Water Piping at Plant & Requests Relief from Requirement to Perform Immediate Code Repair,In Accordance W/Gl 90-05 & 10CFR50.55a(g)(6)(i) | |
BVY-95-107, Transmits 60 Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gates Valves | 16 October 1995 | Transmits 60 Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gates Valves | |
BVY-95-110, Forwards Missed Safety Evaluation Summaries Re Cycle 16 Operating Rept as Required by 10CFR50.59(b)(2) | 6 November 1995 | Forwards Missed Safety Evaluation Summaries Re Cycle 16 Operating Rept as Required by 10CFR50.59(b)(2) | Temporary Modification Earthquake |
BVY-95-111, Forwards Vermont Yankee Cycle 17 Operating Rept | 27 October 1995 | Forwards Vermont Yankee Cycle 17 Operating Rept | |
BVY-95-114, Provides Addl Info Re GL 88-20, IPE for Severe Accident Vulnerabilities 10CFR50.54(f) | 27 October 1995 | Provides Addl Info Re GL 88-20, IPE for Severe Accident Vulnerabilities 10CFR50.54(f) | Mission time Probabilistic Risk Assessment Temporary Modification Weak link |
BVY-95-115, Forwards Validation Rept YAEC-1926, Method for Power/Flow Exclusion Region Calculation Using LAPUR5 Computer Code, Per NRC 950330 SER Re Thermal Hydraulic Stability | 31 October 1995 | Forwards Validation Rept YAEC-1926, Method for Power/Flow Exclusion Region Calculation Using LAPUR5 Computer Code, Per NRC 950330 SER Re Thermal Hydraulic Stability | |
BVY-95-119, Submits Correction to Ltr Submitting YAEC-1926, Yankee Atomic Electric Co Application of BWROG Stability Exclusion Region Methodology for Implementation of Long Term Solution Option 1-D at Vermont Yankee Nuclear Power Plant | 3 November 1995 | Submits Correction to Ltr Submitting YAEC-1926, Yankee Atomic Electric Co Application of BWROG Stability Exclusion Region Methodology for Implementation of Long Term Solution Option 1-D at Vermont Yankee Nuclear Power Plant | |
BVY-95-120, Informs of Plans to Proceed W/Implementation of Seismic Portion of IPE of External Events,In Response to Suppl 5 to GL 88-20 | 7 November 1995 | Informs of Plans to Proceed W/Implementation of Seismic Portion of IPE of External Events,In Response to Suppl 5 to GL 88-20 | |
BVY-95-122, Confirms Intent to Proceed W/Full Conversion of Custom TSs to Improved Tss,Based on NUREG-1433,rev 1 | 13 November 1995 | Confirms Intent to Proceed W/Full Conversion of Custom TSs to Improved Tss,Based on NUREG-1433,rev 1 | |
BVY-95-123, Provides 30 Day Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode | 16 November 1995 | Provides 30 Day Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode | Temporary Modification Foreign Material Exclusion |
BVY-95-124, Responds to NRC Re Violations Noted in Insp Rept 50-271/95-22 on 950918-29.Corrective Actions:Util Will Perform Focussed & Comprehensive Review of IST Program Scope to Verify Compliance W/Asme/Ansi OMa-1988 Parts 1,6 & 10 | 16 November 1995 | Responds to NRC Re Violations Noted in Insp Rept 50-271/95-22 on 950918-29.Corrective Actions:Util Will Perform Focussed & Comprehensive Review of IST Program Scope to Verify Compliance W/Asme/Ansi OMa-1988 Parts 1,6 & 10 | Power-Operated Valves Power Operated Valves |
BVY-95-125, Responds to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity | 17 November 1995 | Responds to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity | |
BVY-95-126, Documents Actions Taken by Util to Evaluate Small Leak in Svc Water Piping & Request Relief from Requirement to Perform Immediate Code Repair,Per GL 95-05 | 1 December 1995 | Documents Actions Taken by Util to Evaluate Small Leak in Svc Water Piping & Request Relief from Requirement to Perform Immediate Code Repair,Per GL 95-05 | |
BVY-95-137, Advises of Intention to Implement Formal Industry Position on Severe Accident Mgt by 981231 | 20 December 1995 | Advises of Intention to Implement Formal Industry Position on Severe Accident Mgt by 981231 | |
BVY-95-138, Responds to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode | 18 December 1995 | Responds to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode | Foreign Material Exclusion |
BVY-95-139, Forwards Rev 3 of Cycle 18,COLR, for VT Yankee Power Station | 14 December 1995 | Forwards Rev 3 of Cycle 18,COLR, for VT Yankee Power Station | |
BVY-95-140, Documents Revised Submittal Date for USI A-46 Effort from 951231 to 960331 | 29 December 1995 | Documents Revised Submittal Date for USI A-46 Effort from 951231 to 960331 | Safe Shutdown |
BVY-95-141, Forwards 1995 Rept in Accordance w/10CFR50.46(a)(3)(ii) for Plant & Summary of Transition from Using GE Safe/Reflood ECCS Methodology to Using NRC Approved RELAP5YA Evaluation Methodology | 29 December 1995 | Forwards 1995 Rept in Accordance w/10CFR50.46(a)(3)(ii) for Plant & Summary of Transition from Using GE Safe/Reflood ECCS Methodology to Using NRC Approved RELAP5YA Evaluation Methodology | |
BVY-95-142, Documents Completion of MOV Program in Accordance W/ Requirements of GL 89-10 | 29 December 1995 | Documents Completion of MOV Program in Accordance W/ Requirements of GL 89-10 | |
BVY-95-144, Submits Response to Violations Noted in Insp Rept 50-271/95-23.Corrective Actions:Util Performed Radiography of Valves on 951105,verified Closure Capability & Compliance W/Requirements of Subsection 4.3.2.4(a) of OM-10 | 29 December 1995 | Submits Response to Violations Noted in Insp Rept 50-271/95-23.Corrective Actions:Util Performed Radiography of Valves on 951105,verified Closure Capability & Compliance W/Requirements of Subsection 4.3.2.4(a) of OM-10 | |
BVY-96-101, Forwards FFD Program at Vermont Yankee for Jan-June 1996. Evaluation & Analysis of Data,Encl | 29 August 1996 | Forwards FFD Program at Vermont Yankee for Jan-June 1996. Evaluation & Analysis of Data,Encl | Fitness for Duty |
BVY-96-102, Forwards Revised Pp 232 of Proposed Change 187 Re Core Shutdown Margin | 30 August 1996 | Forwards Revised Pp 232 of Proposed Change 187 Re Core Shutdown Margin | Shutdown Margin |
BVY-96-105, Provides Util Plans for Insp of RPV Shell Welds at Plant During Refueling Outage on 960906 | 10 September 1996 | Provides Util Plans for Insp of RPV Shell Welds at Plant During Refueling Outage on 960906 | |
BVY-96-107, Responds to NRC Re Violations Noted in Insp Rept 50-271/96-07.Corrective Actions:Completed Addl Training of Design Engineering Staff,Completed Review of Current Design Change & Performed Engineering Evaluation | 23 September 1996 | Responds to NRC Re Violations Noted in Insp Rept 50-271/96-07.Corrective Actions:Completed Addl Training of Design Engineering Staff,Completed Review of Current Design Change & Performed Engineering Evaluation | |
BVY-96-109, Provides Revised TS Pages to Change 186,indicating That New Safety Limit MCPR Valid Only for Util Cycle 19 | 17 September 1996 | Provides Revised TS Pages to Change 186,indicating That New Safety Limit MCPR Valid Only for Util Cycle 19 | Minimum Critical Power Ratio |
BVY-96-110, Informs of Intention to Inspect Core Spray Sys Internal to Rv,Per NRC Bulletin 80-13 | 25 September 1996 | Informs of Intention to Inspect Core Spray Sys Internal to Rv,Per NRC Bulletin 80-13 | |
BVY-96-111, Documents Info Provided During Re License Change Requested That We Revise P. 278 Reference to Include Word Legible in Section 6.13.A.3 | 25 September 1996 | Documents Info Provided During Re License Change Requested That We Revise P. 278 Reference to Include Word Legible in Section 6.13.A.3 | Annual Radioactive Effluent Release Report |
BVY-96-117, Informs That Noted Guidance Has Been Incorporated Into Util Plans for App R Corrective Actions in Response to Violations Noted in Insp Rept 50-271/95-26 | 8 October 1996 | Informs That Noted Guidance Has Been Incorporated Into Util Plans for App R Corrective Actions in Response to Violations Noted in Insp Rept 50-271/95-26 | Exemption Request |
BVY-96-118, Forwards Rept Re Core Spray Sys Insp Conducted at Util During 1996 Refueling Outage | 9 October 1996 | Forwards Rept Re Core Spray Sys Insp Conducted at Util During 1996 Refueling Outage | |
BVY-96-119, Forwards Rev 2 to Calculation YAEC-25Q-301, Flaw Evaluation for UT Indication Using Appenda Program | 9 October 1996 | Forwards Rev 2 to Calculation YAEC-25Q-301, Flaw Evaluation for UT Indication Using Appenda Program | |
BVY-96-121, Responds to Concerns Expressed Re Util EOP Program as Identified in Insp Rept 50-271/96-05 | 16 October 1996 | Responds to Concerns Expressed Re Util EOP Program as Identified in Insp Rept 50-271/96-05 | |
BVY-96-123, Forwards Summary of Evaluation of Intention to Redesignate Several Core Spray & Residual Heat Removal Sys Containment Isolation Valves at Vermont Yankee | 15 October 1996 | Forwards Summary of Evaluation of Intention to Redesignate Several Core Spray & Residual Heat Removal Sys Containment Isolation Valves at Vermont Yankee | |
BVY-96-126, Forwards Revised TS Pages 89,89a & 90 to Incorporate Changes from Amends 148 & 149 to License DPR-28,as Discussed W/Nrc | 17 October 1996 | Forwards Revised TS Pages 89,89a & 90 to Incorporate Changes from Amends 148 & 149 to License DPR-28,as Discussed W/Nrc | Shutdown Margin |
BVY-96-128, Reports Status of Efforts & Provides Update of Commitment to Achieve Compliance W/Inservice Test Requirements by 961001 | 18 October 1996 | Reports Status of Efforts & Provides Update of Commitment to Achieve Compliance W/Inservice Test Requirements by 961001 | |
BVY-96-129, Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4 | 21 October 1996 | Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4 | |
BVY-96-130, Submits App R Fire Area Matrix,Specifying Station Shutdown Methods,Capabilities & Compensatory Actions for pre-outage | 22 October 1996 | Submits App R Fire Area Matrix,Specifying Station Shutdown Methods,Capabilities & Compensatory Actions for pre-outage | Continuous fire watch Fire Watch |
BVY-96-133, Informs NRC of Addl App R Compensatory Measures | 28 October 1996 | Informs NRC of Addl App R Compensatory Measures | Exemption Request Fire Watch |
BVY-96-134, Submits Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode | 31 October 1996 | Submits Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode | |
BVY-96-135, Responds to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs. Provides Info Requested Re Actions Taken to Reduce Potential for ECCS Strainer Clogging | 31 October 1996 | Responds to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs. Provides Info Requested Re Actions Taken to Reduce Potential for ECCS Strainer Clogging | Foreign Material Exclusion |
BVY-96-136, Advises That Results of Evaluation Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days | 30 October 1996 | Advises That Results of Evaluation Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days | |
BVY-96-139, Forwards Response to RAI Re 10CFR50,Appendix R Exemptions | 4 November 1996 | Forwards Response to RAI Re 10CFR50,Appendix R Exemptions | |
BVY-96-140, Advises to Remove J Thayer from List of Recipients of NRC Correspondence & to Add Re Mccullough.Addresses,Listed | 8 November 1996 | Advises to Remove J Thayer from List of Recipients of NRC Correspondence & to Add Re Mccullough.Addresses,Listed | |
BVY-96-143, Provides Requested Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Mov | 15 November 1996 | Provides Requested Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Mov | |
BVY-96-144, Forwards 10CFR50.59 Evaluation Re Core Spray & RHR Containment Isolation Valves at Plant | 15 November 1996 | Forwards 10CFR50.59 Evaluation Re Core Spray & RHR Containment Isolation Valves at Plant | Abnormal operational transient |
BVY-96-145, Responds to RAI Re Request for Exemption from Requirement of 10CFR50,App R,Section Iii.G to Permit Use of Rockbestos Firezone | 15 November 1996 | Responds to RAI Re Request for Exemption from Requirement of 10CFR50,App R,Section Iii.G to Permit Use of Rockbestos Firezone | Safe Shutdown Fire Barrier Exemption Request |
BVY-96-151, Informs That Installation of Improved Fire Protection Sys Will Be Completed by 961231 Instead of 961130 | 27 November 1996 | Informs That Installation of Improved Fire Protection Sys Will Be Completed by 961231 Instead of 961130 | |
BVY-96-152, Responds to RAI Re Request for Exemption for 10CFR50,App R, Section Iii.G | 27 November 1996 | Responds to RAI Re Request for Exemption for 10CFR50,App R, Section Iii.G | Safe Shutdown Fire Barrier Exemption Request Fire Watch |