BVY-95-111, Forwards Vermont Yankee Cycle 17 Operating Rept

From kanterella
Jump to navigation Jump to search
Forwards Vermont Yankee Cycle 17 Operating Rept
ML20094B417
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/27/1995
From: Duffy J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094B418 List:
References
BVY-95-111, NUDOCS 9511010031
Download: ML20094B417 (1)


Text

. . - . -

VERMONT YANKEE l

NUCLEAR POWER CORPORATION

- Ferry Road, Brattleboro, VT 05301-7002 REPLY TO ENGINEERING OFFICE 580 MAIN STREET BoLToN, MA 01740 (608) 779-6711 October 27,1995 l BVY 95-111 l

United States Nuclear Regulatory Commission l ATTN: Document Control Desk j Washington, DC 20555 l

References:

a. License No. DPR-28 (Docket No. 50-271)

Subject:

Vermont Yankee Cycle 17 Operating Report Enclosed please fm' d one copy of the Vermont Yankee Cycle 17 Operating Report, submitted in accordance with 10CFR50.59(b)(2) and 10CFR50.4. This report describes the facility changes, tests, and experiments, including a summary of the safety evaluation of each, which were conducted during this time period without prior NRC approval and which constituted a change in the facility as described in the Final Safety Analysis Report (FSAR).

In accordance with 10CFR50.59(b)(2), this submittal is being made concurrent with a revision to the Final Safety Analysis Report (FSAR), being submitted under separate cover.

We trust this information is acceptable; however, should you have any questions, please contact this office.

Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION James J. Duffy f

Licensing Engineer cc: USNRC Region I Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager - VYNPS C

' 9511010031 951027 /

PDR P

ADOCK 05000271 PDR

/ I i