Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
CNL-15-158, Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor.3 August 2015Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor.Aging Management
CNL-15-163, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions5 August 2015Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions
CNL-15-164, Second Annual Update, License Renewal Application14 August 2015Second Annual Update, License Renewal ApplicationCoatings
Aging Management
Moisture barrier
License Renewal
CNL-15-171, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) - Response to Request for Additional Information11 September 2015Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) - Response to Request for Additional InformationHigh Radiation Area
Non-Destructive Examination
Coatings
VT-2
Moisture barrier
Maintenance Rule Program
CNL-15-175, Fifth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2015Fifth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Operator Manual Action
FLEX
Tornado Generated Missile
CNL-15-178, License Renewal Application - Clarifications (TAC Nos. MF0481 and MF0482)28 August 2015License Renewal Application - Clarifications (TAC Nos. MF0481 and MF0482)Aging Management
CNL-15-186, American Society of Mechanical Engineers Operation and Maintenance Code Relief Requests for Fourth Ten-Year Inservice Test Interval18 November 2015American Society of Mechanical Engineers Operation and Maintenance Code Relief Requests for Fourth Ten-Year Inservice Test IntervalBoric Acid
Stroke time
CNL-15-188, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Correction to ITS 3.3.7, Control Room Emergency Ventilation System (CREVS) Actuation Instrumentation.31 August 2015Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Correction to ITS 3.3.7, Control Room Emergency Ventilation System (CREVS) Actuation Instrumentation.Surveillance Frequency Control Program
CNL-15-197, Tenth Progress Update on Improved Flood Mitigation System Project25 September 2015Tenth Progress Update on Improved Flood Mitigation System Project
CNL-15-210, Withdrawal of Proposed Technical Specification Change, Ultimate Heat Sink (UHS) Temperature Limitations Supporting Alternate Essential Raw Cooling Water (ERCW) Loop Alignments (SQN-TS-13-01 and 13-02)22 October 2015Withdrawal of Proposed Technical Specification Change, Ultimate Heat Sink (UHS) Temperature Limitations Supporting Alternate Essential Raw Cooling Water (ERCW) Loop Alignments (SQN-TS-13-01 and 13-02)Ultimate heat sink
CNL-15-212, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)17 December 2015Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)Decommissioning Funding Plan
CNL-15-218, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information23 October 2015Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional InformationIntegrated leak rate test
Moisture barrier
CNL-15-230, Service List Update for Routine Information10 November 2015Service List Update for Routine Information
CNL-15-259, Eleventh Progress Update on Improved Flood Mitigation System Project22 December 2015Eleventh Progress Update on Improved Flood Mitigation System Project
CNL-15-260, Commitments to Maintain Severe Accident Management Guidelines30 December 2015Commitments to Maintain Severe Accident Management GuidelinesSevere Accident Management Guideline
CNL-16-001, Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)26 May 2016Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)Safe Shutdown
Fire Barrier
Stroke time
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
Overspeed trip
Water hammer
CNL-16-004, Observations on the Basis for a Non-Cited Violation Involving a Design Change to Remove a Kirk Key Mechanical Interlock8 January 2016Observations on the Basis for a Non-Cited Violation Involving a Design Change to Remove a Kirk Key Mechanical InterlockSafe Shutdown
Operator Manual Action
CNL-16-005, Guarantee of Payment of Deferred Premiums - 2015 Annual Report6 April 2016Guarantee of Payment of Deferred Premiums - 2015 Annual Report
CNL-16-006, Annual Insurance Status Report29 March 2016Annual Insurance Status Report
CNL-16-011, Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days (TS-SQN-16-01)11 March 2016Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days (TS-SQN-16-01)Safe Shutdown
Boric Acid
Ultimate heat sink
High Energy Line Break
Surveillance Frequency Control Program
Design basis earthquake
Earthquake
Fuel cladding
CNL-16-012, Radiological Emergency Revision and Central Emergency Control Center Emergency Plan Implementing Procedure Revision14 January 2016Radiological Emergency Revision and Central Emergency Control Center Emergency Plan Implementing Procedure RevisionUltimate heat sink
CNL-16-018, License Amendment Request (SQN-TS-16-03) to Change the Completion Date of Cyber Security Plan Implementation Milestone 816 May 2016License Amendment Request (SQN-TS-16-03) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8Cyber Security
Safeguards Contingency Plan
Cyber attack
CNL-16-021, Nuclear Decommissioning Trust Fund Balance - Request for Exemption10 March 2016Nuclear Decommissioning Trust Fund Balance - Request for ExemptionLicense Renewal
Exemption Request
CNL-16-022, Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-527 May 2016Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5Nondestructive Examination
Dissimilar Metal Weld
CNL-16-026, Completion of Required Action for Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) March 12, 201211 February 2016Completion of Required Action for Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) March 12, 2012Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Time to boil
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
FLEX
B.5.b
Fukushima Dai-Ichi
Operability Determination
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Earthquake
CNL-16-049, Withdrawal of Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04)19 September 2016Withdrawal of Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04)
CNL-16-051, Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)13 March 2017Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
Overspeed
CNL-16-052, Service List Update for Routine Information25 March 2016Service List Update for Routine Information
CNL-16-083, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestones22 June 2016Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestones
CNL-16-085, Bellefonte, Browns Ferry, Sequoyah, and Watts Bar - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A10 May 2016Bellefonte, Browns Ferry, Sequoyah, and Watts Bar - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-AFitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
B.5.b
Process Control Program
Commercial Grade
Fire Protection Program
Grace period
Loss of condenser vacuum
CNL-16-086, Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System31 May 2016Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water SystemUltimate heat sink
Surveillance Frequency Control Program
Operability Determination
CNL-16-099, Radiological Emergency Plan Revision20 June 2016Radiological Emergency Plan RevisionSafe Shutdown
CNL-16-102, Thirteenth Progress Update on Improved Flood Mitigation System Project30 June 2016Thirteenth Progress Update on Improved Flood Mitigation System Project
CNL-16-106, Nuclear Decommissioning Trust Fund Balance - Revised Request for Exemption24 June 2016Nuclear Decommissioning Trust Fund Balance - Revised Request for ExemptionLicense Renewal
Exemption Request
CNL-16-111, Capsule Withdrawal Schedule Revision23 December 2016Capsule Withdrawal Schedule Revision
CNL-16-115, Notification of Change in Completion Schedule Regarding the Improved Flood Mitigation System Project15 July 2016Notification of Change in Completion Schedule Regarding the Improved Flood Mitigation System ProjectFLEX
CNL-16-121, Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days22 July 2016Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 DaysUltimate heat sink
CNL-16-123, Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-528 July 2016Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5
CNL-16-128, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 143 August 2016Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14
CNL-16-136, Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ000000201600004120 September 2016Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041
CNL-16-144, Use of Encryption Software for Electronic Transmission of Safeguards Information28 October 2016Use of Encryption Software for Electronic Transmission of Safeguards Information
CNL-16-158, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions28 September 2016Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
CNL-16-163, Tennessee Valley Authority Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools3 November 2016Tennessee Valley Authority Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel PoolsB.5.b Mitigating Strategies
License Renewal
Power Uprate
CNL-16-174, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update27 December 2016Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update
CNL-16-180, Application to Request an Alternative to the ASME Code OMN-20 (RV-04)27 February 2017Application to Request an Alternative to the ASME Code OMN-20 (RV-04)Incorporated by reference
Operability Determination
CNL-16-194, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid23 December 2016Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
CNL-16-196, Revised Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools19 December 2016Revised Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel PoolsB.5.b
License Renewal
Power Uprate
CNL-16-197, Submittal of Radiological Emergency Plan Revision and Central Emergency Control Center Emergency Plan Implementing Procedure Revision14 December 2016Submittal of Radiological Emergency Plan Revision and Central Emergency Control Center Emergency Plan Implementing Procedure Revision
CNL-16-204, Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 3328 December 2016Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 33Fitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Cyber Security
B.5.b
Process Control Program
Commercial Grade
Fire Protection Program
Grace period
Cyber attack
Loss of condenser vacuum
CNL-17-006, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions10 January 2017Central Emergency Control Center Emergency Plan Implementing Procedure Revisions