Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
05000440/FIN-2016009-01Failure to Implement a Periodic Replacement Program for FLEX Hoses
05000440/FIN-2016009-02Failure to Establish a Periodic Maintenance Program for Communications Equipment Associated with FLEX
IR 05000440/201500411 February 2016NRC Integrated Inspection Report 05000440/2015004
IR 05000440/20150051 September 2015Mid-Cycle Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2015005)
IR 05000440/20150062 March 2016Annual Assessment Letter for Perry, Unit 1 (Inspection Report 05000440/2015006)
IR 05000440/201600531 August 2016Mid-Cycle Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2016005)
IR 05000440/201600914 September 2016NRC Temporary Instruction 2515/191, Mitigation Strategies, Spent Fuel Pool Instrumentation and Emergency Preparedness Inspection Report 05000440/2016009
IR 05000440/20170083 January 2018NRC Design Bases Assurance Inspection (Teams) Inspections Report 05000440/2017008 (DRS-N.Feliz-Adorno)
L-12-121, Answer to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)29 March 2012Answer to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)
L-12-341, Firstenergy Nuclear Operating Co'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)26 October 2012Firstenergy Nuclear Operating Co'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
L-13-057, Overall Integrated Plan in Response to March 12, 2012 Commission Order Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)27 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)
L-13-213, Response to Request for Additional Information Regarding Overall Integrated Plan in Response to March 12, 2012 Commission Order Issuance of Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2 July 2013Response to Request for Additional Information Regarding Overall Integrated Plan in Response to March 12, 2012 Commission Order Issuance of Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
L-13-244, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)26 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)
L-14-024, Firstenergy Nuclear Operating Company'S (Fenoc'S) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2014Firstenergy Nuclear Operating Company'S (Fenoc'S) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2014Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
L-15-001, Firstenergy Nuclear Operating Company'S (Fenoc'S) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool.26 February 2015Firstenergy Nuclear Operating Company'S (Fenoc'S) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool.
L-15-012, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2 June 2015Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation
ML12054A67912 March 2012Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
ML12056A04412 March 2012Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML12118A54127 April 2012Joint Answer Opposing Hearing Requests Regarding Sufficiency of Order EA-12-051 Modifying Licenses with Regard to Spent Fuel Pool Instrumentation
ML13155A53910 June 2013Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation
ML13176A33325 June 2013NRR E-mail Capture - Order EA-12-051, Reliable Spent Fuel Pool Instrumentation - Request for Additional Information
ML13340A65311 December 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation
ML14083A62026 March 2014Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051
ML14245A3172 September 2014Mid-Cycle Assessment Letter for Perry Nuclear Power Plant
ML14321A05719 November 2014Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
ML15062A6044 March 2015Annual Assessment Letter for Perry Nuclear Power Plant (Report 050003440/2014001)
ML15098A0561 June 2015Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051
ML16056A56016 May 2016Unit No.1 - Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051
ML16134A19811 May 2016Information Request to Support Upcoming Temporary Instruction 191 Inspection at Perry Nuclear Power Plant
ML16158A33114 September 2016Issuance of Amendment Concerning Revision to the Perry Nuclear Power Plant Emergency Plan
ML20219A12917 August 2020Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident
NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status12 March 2012Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status