Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc | 31 March 2011 | Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc | Decommissioning Funding Plan |
CNRO-2011-00002, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) | 31 March 2011 | Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) | |
GNRO-2011/00002, Response to Request for Additional Information on GGNS Cyber Security Plan (Public Version) | 15 February 2011 | Response to Request for Additional Information on GGNS Cyber Security Plan (Public Version) | Cyber Security |
GNRO-2011/00005, Core Operating Limits Report Cycle 18 Mid-Cycle Revision | 8 February 2011 | Core Operating Limits Report Cycle 18 Mid-Cycle Revision | |
GNRO-2011/00007, Request for Additional Information Regarding Extended Power Uprate | 23 February 2011 | Request for Additional Information Regarding Extended Power Uprate | Safe Shutdown Ultimate heat sink Fire Barrier Operator Manual Action Fire Protection Program |
GNRO-2011/00011, Request for Additional Information Regarding Extended Power Uprate | 23 February 2011 | Request for Additional Information Regarding Extended Power Uprate | Finite Element Analysis Flow Induced Vibration |
GNRO-2011/00012, Request for Additional Information Regarding Extended Power Uprate | 23 February 2011 | Request for Additional Information Regarding Extended Power Uprate | Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report |
GNRO-2011/00013, Request for Additional Information Regarding Extended Power Uprate | 23 February 2011 | Request for Additional Information Regarding Extended Power Uprate | Earthquake |
GNRO-2011/00014, Spent Fuel Storage Radioactive Effluent Release Report for 2010 | 28 February 2011 | Spent Fuel Storage Radioactive Effluent Release Report for 2010 | Annual Radioactive Effluent Release Report |
GNRO-2011/00016, Request for Additional Information Regarding Extended Power Uprate | 9 March 2011 | Request for Additional Information Regarding Extended Power Uprate | Post Accident Monitoring Emergency Lighting Power Uprate |
GNRO-2011/00017, Request for Additional Information Regarding Extended Power Uprate | 9 March 2011 | Request for Additional Information Regarding Extended Power Uprate | Coatings |
GNRO-2011/00018, Request for Additional Information Regarding Extended Power Uprate | 30 March 2011 | Request for Additional Information Regarding Extended Power Uprate | Finite Element Analysis Liquid penetrant |
GNRO-2011/00019, Request for Additional Information Regarding Extended Power Uprate | 22 March 2011 | Request for Additional Information Regarding Extended Power Uprate | Probabilistic Risk Assessment |
GNRO-2011/00021, Response to Request for Additional Information Regarding Extended Power Uprate | 31 March 2011 | Response to Request for Additional Information Regarding Extended Power Uprate | Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake |
IR 05000416/2010005 | 10 February 2011 | NRC Integrated Inspection Report Number 05000416-10-005 and Notice of Violation | Internal Flooding Probabilistic Risk Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Fire Protection Program Hourly Fire Watch Siren |
IR 05000416/2010501 | 10 January 2011 | IR 05000416-10-501, on 12/31/2010, Grand Gulf Nuclear Station, NRC Emergency Preparedness Annual Inspection (Cover Letter) | |
IR 05000416/2011001 | 4 March 2011 | Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2011001) | |
IR 05000416/2011405 | 4 March 2011 | NRC Material Control and Accounting Program Inspection Report 05000416-11-405 | Affidavit |
ML103420096 | 25 February 2011 | Request for Withholding Information from Public Disclosure, 8/20/10 Affidavit Executed by E. Schrull, GEH, for NEDC-33477P | |
ML103470586 | 5 January 2011 | Request for Withholding Information from Public Disclosure, 11/19/10 Affidavit Executed by E. Schrull, GE-Hitachi, Regarding NEDC-33621P | |
ML110050513 | 5 January 2011 | Generic Fundamentals Section of the Written Operator Licensing Examination | Generic Fundamentals Examination |
ML110060651 | 6 January 2011 | Generic Fundamentals Examination Results | Generic Fundamentals Examination |
ML110260281 | 26 January 2011 | E-mail, Request for Additional Information Instrument and Controls, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt | |
ML110260287 | 26 January 2011 | E-mail, Request for Additional Information Fire Protection, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt | Safe Shutdown Fire Barrier Operator Manual Action Fire Protection Program |
ML110270187 | 27 January 2011 | Request for Additional Information, Emcb Non-Steam Dryer Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt | Finite Element Analysis |
ML110280044 | 27 January 2011 | Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000416-11-007 and Request for Information | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Emergency Lighting Severe Accident Management Guideline B.5.b Mitigating Strategies Maintenance Rule Program Fire Protection Program |
ML110310390 | 31 January 2011 | E-mail, Request for Additional Information, Vessels and Internal Integrity Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt | Hydrostatic |
ML110390173 | 8 February 2011 | Email, Request for Additional Information, Nrr/Dci/Csgb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt | |
ML110460487 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades | |
ML110480054 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades | |
ML110540377 | 10 January 2011 | FEMA, Submittal of Radiological Emergency Preparedness Final Report for Grand Gulf, Medical Services Re-demonstration Drill Evaluated on 12/16/10 | |
ML110540705 | 23 February 2011 | E-mail, Request for Additional Information, Nrr/Dirs/Ihpb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt | |
ML110540712 | 23 February 2011 | E-mail, Request for Additional Information, Nrr/Dra/Apla Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt | Probabilistic Risk Assessment |
ML110550670 | 22 February 2011 | G20110127/EDATS: OEDO-2011-0156 - Michael Mulligan E-mail 2.206 - Palisades, Request Emergency Shutdown | Boric Acid Offsite Dose Calculation Manual Enforcement Discretion VT-2 Aging Management Fire Protection Program Affidavit |
ML110600717 | 1 March 2011 | Email Request for Additional Information, Round 2, Nrr/Dci/Cvib Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt | |
ML110600746 | 28 February 2011 | CFR Part 26, Subpart I - Managing Fatigue, for Period Ending 2010 | |
ML110610383 | 24 February 2011 | Annual Reporting Form for Drug and Alcohol Tests, for Period Ending 2010 | |
ML110610386 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 01/27/2010 | |
ML110610389 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 03/25/2010 | |
ML110610391 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 03/29/2010 | |
ML110610412 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 03/31/2010 | |
ML110610420 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/05/2010 | |
ML110610422 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/07/2010 | |
ML110610424 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/07/2010 | |
ML110610426 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/12/2010 | |
ML110610433 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/12/2010 | |
ML110610437 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/12/2010 | |
ML110610438 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/14/2010 | |
ML110610440 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/14/2010 | |
ML110610443 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/17/2010 |