Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
CP-200801015, Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 21 August 2008Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 2
CP-200900262, License Amendment Request (LAR) 09-001, Administrative Revision to Operating Licenses and Technical Specifications11 February 2009License Amendment Request (LAR) 09-001, Administrative Revision to Operating Licenses and Technical Specifications
CP-201000212, Technical Specifications Bases for Comanche Peak Steam Electric Station, Units 1 and 215 February 2010Technical Specifications Bases for Comanche Peak Steam Electric Station, Units 1 and 2
CP-201101038, License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled1 August 2011License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled
CP-201101065, Comanche Peak Units 1 & 2 Final Safety Analysis Report (Fsar), Amendment 104, Technical Specifications Bases1 August 2011Comanche Peak Units 1 & 2 Final Safety Analysis Report (Fsar), Amendment 104, Technical Specifications Bases
CP-201200552, License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-112 July 2012License Amendment Request (LAR) 2012-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-1
CP-201201253, Supplement to License Amendment Request (LAR) 12-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-1, Post Accident Monitoring Instrumentation.23 October 2012Supplement to License Amendment Request (LAR) 12-001, Revision to Technical Specification 5.7, High Radiation Area and Technical Specifications Table 3.3.3-1, Post Accident Monitoring Instrumentation.
CP-201300130, Comanche Peak, Units 1 & 2, Technical Specification Bases, Revision 674 February 2013Comanche Peak, Units 1 & 2, Technical Specification Bases, Revision 67
CP-201301214, Response to Request for Additional Information Regarding Closure Options for Generic Safety Issue 19131 October 2013Response to Request for Additional Information Regarding Closure Options for Generic Safety Issue 191
CP-201500668, License Amendment Request 15-003 for Revision to Units 1 & 2 Emergency Action Levels30 June 2015License Amendment Request 15-003 for Revision to Units 1 & 2 Emergency Action Levels
CP-201600048, Response to Request for Additional Information Regarding License Amendment Request 15-003 for Revision to Emergency Action Levels27 January 2016Response to Request for Additional Information Regarding License Amendment Request 15-003 for Revision to Emergency Action Levels
CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-00221 November 2022Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002
CPSES-200402431, License Amendment Request 04-011, Revision to Technical Specification (TS 3.3.3) Post Accident Monitoring Instrumentation and 3.6.8 Hydrogen Recombiners28 October 2004License Amendment Request 04-011, Revision to Technical Specification (TS 3.3.3) Post Accident Monitoring Instrumentation and 3.6.8 Hydrogen Recombiners
CPSES-200600635, License Amendment Request (LAR) 06-004 Revision to Technical Specification 5.0, Administrative Controls.31 March 2006License Amendment Request (LAR) 06-004 Revision to Technical Specification 5.0, Administrative Controls.
IR 05000445/200500327 July 2005IR 05000445-05-003, 05000446-05-003; 03/25/2005-06/23/2005; Comanche Peak Steam Electric Station, Units 1 and 2; Licensed Operator Requalification and Event Follow-Up
IR 05000445/20110059 February 2012IR 05000445/2011005, 05000446/2011005; 9/18/2011 - 12/31/2011; Comanche Peak Nuclear Power Plant, Units 1 and 2; Refueling and Other Outage Activities, Exercise Evaluation, Radiological Hazard Assessment and Exposure Controls, Identificatio
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units23 March 1990Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown25 February 1992Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization8 April 1993Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels10 August 1993Thermal Stratification of Water in BWR Reactor Vessels
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications26 November 1993Potential Problems with BWR Level Instrumentation Backfill Modifications
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System24 May 1994Undetected Accumulation of Gas in Reactor Coolant System
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 115 July 1994Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel18 January 1996Partial Bypass of Shutdown Cooling Flow from Reactor Vessel
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown18 June 1996Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves5 August 1996Unexpected Opening of Multiple Safety Relief Valves
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power22 October 1996Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown11 December 1996Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown5 December 1997Recent Events Involving Reactor Coolant System Inventory Control During Shutdown
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick5 May 1999Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick
ML03115058529 January 1985Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations
ML0407701223 February 2004Draft Information Inputs Corrected TS Pages 3.0-2 Attachment 1
ML05122005621 April 2005Technical Specification Pages Hydrogen Recombiners
ML05123043125 March 200503-2005-Final-Written Exam
ML05125049028 March 200503-2005-Draft-Written Exam
ML06044060313 February 2006IR 05000445-05-005, 05000446-05-005; 09/24/2005-12/31/2005; Comanche Peak Steam Electric Station, Units 1 and 2; Inservice Inspection Activities, Event Follow-up, and Other Activities
ML0806704197 March 2008CDBI Findings
ML0823212781 August 2008Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 2
ML09295055126 February 2010Issuance of Amendment Nos. 150 and 150, Administrative Revision to the Operating License to Change Plant Name, Reissue Technical Specifications to Remove Ts/Tables No Longer Applicable to Operation
ML10117036715 February 2010Technical Specifications Bases for Comanche Peak Steam Electric Station, Units 1 and 2
ML11237A1271 August 2011Comanche Peak Units 1 & 2 Final Safety Analysis Report (Fsar), Amendment 104, Technical Specifications Bases
ML12067A24429 June 2012Issuance of Amendment Nos. 156 and 156, Adoption of TSTF-425-A, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specifications Task Force (RITSTF) Initiative 5b
ML13043A0394 February 2013Technical Specification Bases, Revision 67
ML13071A39121 February 2013Technical Specifications Bases
ML13156A24811 July 2013Issuance of Amendment Nos. 159 and 159, Revise Technical Specification (TS) 5.7, High Rad Area, and TS Table 3.3.3-1, Post Accident Monitoring Instrumentation
ML15191A16324 June 2015EPP-201, Emergency Action Level Technical Bases Document(Clean Version)
ML15191A16424 June 2015Emergency Action Level Technical Bases (Redline and Strikeout Version)
ML16180A4371 February 2016FSAR Amendment 107, Text - TMI
ML19256E8367 November 1979Responds to 790927 Ltr Re Followup Actions Resulting from NRC Review of Tmi.Forwards Info Re Facility Emergency Planning & Preparedness,Operator Training,Procedures & Operations Review & Interim Response to Lessons Learned
ML19316A95325 August 1979Submits Intervenor First Informal Request for Info Per 790717 Conversation,Re NRC in-house Projects,Acrs activities,TMI-2 Lessons Learned Task Force & IE Communications