Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
TSTF-03-02, Traveler - August 12, 2003 Transmits TSTF-423, Technical Specifications End States, NEDC-32988-A.12 August 2003Traveler - August 12, 2003 Transmits TSTF-423, Technical Specifications End States, NEDC-32988-A.Safe Shutdown
Stroke time
Recently irradiated fuel
Offsite Circuit
TSTF-03-06, Transmittal Letter - Withdrawal of Travelers from NRC Review31 October 2003Transmittal Letter - Withdrawal of Travelers from NRC Review
TSTF-03-09, Traveler - November 10, 2003 - Transmits TSTF-430, R.1, AOT Extension to 7 Days for LPI and Containment Spray (BAW-2295-A, Rev. 1)10 November 2003Traveler - November 10, 2003 - Transmits TSTF-430, R.1, AOT Extension to 7 Days for LPI and Containment Spray (BAW-2295-A, Rev. 1)
TSTF-03-10, Traveler - November 10, 2003, Transmits Response to June 23, 2003 Request for Additional Information on TSTF-422, R.1, Change in Technical Specifications End States (CE NPSD-1186).10 November 2003Traveler - November 10, 2003, Transmits Response to June 23, 2003 Request for Additional Information on TSTF-422, R.1, Change in Technical Specifications End States (CE NPSD-1186).
TSTF-03-11, Traveler - November 17, 2003, Transmits TSTF-372, R.3 Addition of LCO 3.0.8, Inoperability of Snubbers17 November 2003Traveler - November 17, 2003, Transmits TSTF-372, R.3 Addition of LCO 3.0.8, Inoperability of SnubbersProbabilistic Risk Assessment
Earthquake
TSTF-03-12, Traveler - November 10, 2003, Transmits TSTF-429, R.3 Ice Mass Determination Surveillance Requirements.10 November 2003Traveler - November 10, 2003, Transmits TSTF-429, R.3 Ice Mass Determination Surveillance Requirements.Condition Adverse to Quality
TSTF-04-03, TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers.23 April 2004TSTF-372, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers.Probabilistic Risk Assessment
Earthquake
TSTF-04-04, TSTF-467, Revision 0, Add Restriction for Lowest Loop T(Ave) During Mode 2 Physics Testing.28 June 2004TSTF-467, Revision 0, Add Restriction for Lowest Loop T(Ave) During Mode 2 Physics Testing.
TSTF-04-05, TSTF-468, Revision 0, Declare Systems Inoperable Due to an Inoperable MCC or Distribution Panel in Lieu of ITS 3.8.9.30 August 2004TSTF-468, Revision 0, Declare Systems Inoperable Due to an Inoperable MCC or Distribution Panel in Lieu of ITS 3.8.9.Safe Shutdown
Post Accident Monitoring
Offsite Circuit
TSTF-04-07, TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action.30 August 2004TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action.Shutdown Margin
Anticipated operational occurrence
Scram Discharge Volume
Overtravel
Earthquake
Grace period
TSTF-04-08, TSTF-425, Revision 0, Relocate Surveillance Frequencies to Licensee Control.31 August 2004TSTF-425, Revision 0, Relocate Surveillance Frequencies to Licensee Control.Safe Shutdown
Reactor Vessel Water Level
High Radiation Area
Stroke time
Hydrostatic
Probabilistic Risk Assessment
Squib
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Battery sizing
Overtravel
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Backfit
Unidentified leakage
TSTF-04-09, TSTF-426, Revision 0, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c30 August 2004TSTF-426, Revision 0, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c
TSTF-04-10, TSTF-476, Revision 0, Improved BPWS Control Rod Insertion Process (NEDO-33091)30 August 2004TSTF-476, Revision 0, Improved BPWS Control Rod Insertion Process (NEDO-33091)Shutdown Margin
Probabilistic Risk Assessment
Scram Discharge Volume
TSTF-04-11, TSTF-477, Revision 0, Add Action for Two Inoperable Control Room AC Subsystems30 August 2004TSTF-477, Revision 0, Add Action for Two Inoperable Control Room AC SubsystemsPost Accident Monitoring
Recently irradiated fuel
TSTF-04-12, Submittal and Request for Fee Waiver for Review of TSTF-478, Revision 0, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control.25 April 2005Submittal and Request for Fee Waiver for Review of TSTF-478, Revision 0, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control.Probabilistic Risk Assessment
Severe Accident Management Guideline
Fuel cladding
Backfit
TSTF-04-13, TSTF-449, Revision 2, Steam Generator Tube Integrity.7 October 2004TSTF-449, Revision 2, Steam Generator Tube Integrity.Non-Destructive Examination
Post Accident Monitoring
Nondestructive Examination
Fuel cladding
Pressure Boundary Leakage
TSTF-04-15, TSTF-479, Revision 0, Changes to Reflect Revision of 10 CFR 50.55a.2 December 2004TSTF-479, Revision 0, Changes to Reflect Revision of 10 CFR 50.55a.Stroke time
Incorporated by reference
Offsite Circuit
TSTF-04-16, TSTF-446, Revision 1, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).31 January 2005TSTF-446, Revision 1, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).High Radiation Area
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
Fuel cladding
TSTF-05-03, Transmittal of TSTF-482, Revision 0, Correct LCO 3.0.6 Bases, for NRC Consideration15 February 2005Transmittal of TSTF-482, Revision 0, Correct LCO 3.0.6 Bases, for NRC ConsiderationOffsite Circuit
TSTF-05-05, Letter Transmitting TSTF-449, Revision 4, Steam Generator Tube Integrity.14 April 2005Letter Transmitting TSTF-449, Revision 4, Steam Generator Tube Integrity.Non-Destructive Examination
Post Accident Monitoring
Nondestructive Examination
Fuel cladding
Pressure Boundary Leakage
TSTF-05-06, TSTF-05-06, Transmit TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities.5 May 2005TSTF-05-06, Transmit TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities.Hydrostatic
TSTF-05-07, Submittal and Request for Fee Waiver for Review of TSTF-343, Revision 1, Containment Structural Integrity.29 June 2005Submittal and Request for Fee Waiver for Review of TSTF-343, Revision 1, Containment Structural Integrity.
TSTF-05-08, Submittal and Request for Fee Waiver for Review of TSTF-485, Revision 0, Correct Example 1.4-1.31 May 2005Submittal and Request for Fee Waiver for Review of TSTF-485, Revision 0, Correct Example 1.4-1.Missed surveillance
TSTF-05-10, TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.20 June 2005TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.Safe Shutdown
Time of Discovery
Shutdown Margin
Offsite Circuit
TSTF-05-12, TSTF-05-12, Transmit TSTF-448, Revision 2, Control Room Habitability.18 August 2005TSTF-05-12, Transmit TSTF-448, Revision 2, Control Room Habitability.Safe Shutdown
Condition Adverse to Quality
Recently irradiated fuel
TSTF-05-13, Technical Specification Task Force (TSTF) Response to May 25, 2005 Notice of Opportunity to Comment on Model Safety Evaluation on Technical Specification Improvement Re Revision to the Completion Time in STS 3.6.1.3, Primary Containment I25 July 2005Technical Specification Task Force (TSTF) Response to May 25, 2005 Notice of Opportunity to Comment on Model Safety Evaluation on Technical Specification Improvement Re Revision to the Completion Time in STS 3.6.1.3, Primary Containment IsoProbabilistic Risk Assessment
Large early release frequency
TSTF-05-14, Writer'S Guide for Plant-Specific Improved Technical Specifications, TSTF-GG-05-019 August 2005Writer'S Guide for Plant-Specific Improved Technical Specifications, TSTF-GG-05-01
TSTF-05-15, TSTF-454, Revision 1, Extend PCIV Completion Times (NEDC-33046)21 September 2005TSTF-454, Revision 1, Extend PCIV Completion Times (NEDC-33046)High Radiation Area
Squib
Large early release frequency
TSTF-05-16, TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.13 September 2005TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.Pressure Boundary Leakage
Power change
TSTF-05-17, TSTF-IG-05-02, Implementation Guidance for TSTF-423, Revision 0, Technical Specifications End States, NEDC-32988-A.19 September 2005TSTF-IG-05-02, Implementation Guidance for TSTF-423, Revision 0, Technical Specifications End States, NEDC-32988-A.Safe Shutdown
TSTF-05-18, Transmittal of TSTF-491, Revision 0, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications.13 September 2005Transmittal of TSTF-491, Revision 0, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications.Stroke time
TSTF-05-19, TSTF-492, Rev. 0, Modify RHR - High Water Level Bases to Address Decay Heat Removal with Upper Internals Installed.25 October 2005TSTF-492, Rev. 0, Modify RHR - High Water Level Bases to Address Decay Heat Removal with Upper Internals Installed.Boric Acid
Fuel cladding
TSTF-05-20, TSTF-05-20, Request for Review Fee Billing Change for TSTF-468, Revision 013 October 2005TSTF-05-20, Request for Review Fee Billing Change for TSTF-468, Revision 0
TSTF-05-21, TSTF-05-21, Transmittal of TSTF-491, Revision 1, Removal of Main Steam & Main Feedwater Valve Isolation Times from Technical Specifications.13 October 2005TSTF-05-21, Transmittal of TSTF-491, Revision 1, Removal of Main Steam & Main Feedwater Valve Isolation Times from Technical Specifications.Stroke time
TSTF-05-22, Response to the Nrc'S August 15, 2005 and September 19, 2005 Letters Regarding Fee Exemption Requests for Traveler Reviews2 November 2005Response to the Nrc'S August 15, 2005 and September 19, 2005 Letters Regarding Fee Exemption Requests for Traveler ReviewsExemption Request
TSTF-06-01, TSTF-412, Revision 2, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable.31 January 2006TSTF-412, Revision 2, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable.Power change
TSTF-06-02, TSTF-459, Revision 1, Provide an Exception to the Requirement to Have One RHR Shutdown Cooling System in Operation13 February 2006TSTF-459, Revision 1, Provide an Exception to the Requirement to Have One RHR Shutdown Cooling System in OperationSafe Shutdown
Shutdown Margin
Time to boil
TSTF-06-03, TSTF-493, Revision 0, Clarify Application of Setpoint Methodology for LSSS Functions.27 January 2006TSTF-493, Revision 0, Clarify Application of Setpoint Methodology for LSSS Functions.Reactor Vessel Water Level
Anticipated operational occurrence
Incorporated by reference
Scram Discharge Volume
Operability Determination
Fuel cladding
Backfit
Power Uprate
TSTF-06-04, Technical Specification Task Force (TSTF) Response to the December 14, 2005 Technical Specification Improvement for Boiling Water Reactors Plants to Risk-Inform Requirements Regarding Selected Required Action End States Using the Consolid13 January 2006Technical Specification Task Force (TSTF) Response to the December 14, 2005 Technical Specification Improvement for Boiling Water Reactors Plants to Risk-Inform Requirements Regarding Selected Required Action End States Using the Consolidat
TSTF-06-05, TSTF-427, Revision 1, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability3 February 2006TSTF-427, Revision 1, Allowance for Non Technical Specification Barrier Degradation on Supported System OperabilityFire Barrier
Internal Flooding
Probabilistic Risk Assessment
Tornado Generated Missile
Large early release frequency
Turbine Missile
TSTF-06-06, TSTF-477, Revision 1, Add Action for Two Inoperable Control Room AC Subsystems.31 March 2006TSTF-477, Revision 1, Add Action for Two Inoperable Control Room AC Subsystems.Post Accident Monitoring
TSTF-06-07, TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability.3 May 2006TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability.Fire Barrier
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Turbine Missile
TSTF-06-08, Technical Specification Task Force Request for NRC Reconsideration of January 31, 2003 Letter Regarding Collection of Review Fees for Generic Standard Technical Specifications Improvements28 April 2006Technical Specification Task Force Request for NRC Reconsideration of January 31, 2003 Letter Regarding Collection of Review Fees for Generic Standard Technical Specifications Improvements
TSTF-06-11, Response to NRC Request for Additional Information Regarding TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities, Dated April 7, 20065 June 2006Response to NRC Request for Additional Information Regarding TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities, Dated April 7, 2006Hydrostatic
TSTF-06-14, TSTF-497, Revision 0, Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less.12 July 2006TSTF-497, Revision 0, Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less.
TSTF-06-15, Response to NRC Request for Review of Draft Safety Evaluation and Request for Additional Information Regarding TSTF-412, Revision 2, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Dated 04/14/200612 July 2006Response to NRC Request for Review of Draft Safety Evaluation and Request for Additional Information Regarding TSTF-412, Revision 2, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Dated 04/14/2006
TSTF-06-19, TSTF-477, Revision 2, Add Action for Two Inoperable Control Room AC Subsystems18 July 2006TSTF-477, Revision 2, Add Action for Two Inoperable Control Room AC SubsystemsPost Accident Monitoring
TSTF-06-20, TSTF-495, Revision 0, Bases Change to Address GE Part 21 SC05-03.18 July 2006TSTF-495, Revision 0, Bases Change to Address GE Part 21 SC05-03.Reactor Vessel Water Level
Fuel cladding
TSTF-06-22, TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems.8 September 2006TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems.Post Accident Monitoring
TSTF-06-25, Response to NRC Request for Additional Information Regarding TSTF-487, Revision 0, Relocate DNB Parameters to the COLR, Dated September 5, 200627 October 2006Response to NRC Request for Additional Information Regarding TSTF-487, Revision 0, Relocate DNB Parameters to the COLR, Dated September 5, 2006