Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML08149062030 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 1, Table of ContentsIncorporated by reference
ML08149062230 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2, Table of ContentsFinite Element Analysis
Earthquake
ML08149062430 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 3, Table of ContentsTornado Generated Missile
ML08149062630 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 4, Table of Contents
ML08149062830 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 5, Table of ContentsNondestructive Examination
Pressure Boundary Leakage
ML08150025230 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 6, Table of ContentsCoatings
ML08150025430 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 7, Table of ContentsSafe Shutdown
Boric Acid
Reactor Vessel Water Level
ML08150025630 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 8, Table of Contents
ML08150025830 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 9, Table of ContentsSafe Shutdown
Ultimate heat sink
Grab sample
ML08150026330 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 11, Table of Contents
ML08150028530 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 13, Table of Contents
ML08150028730 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 14, Table of Contents
ML08150028930 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 15, Table of Contents
ML08150029130 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 16, Table of Contents
ML08150029230 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter of 16, Technical SpecificationsStroke time
ML08150032530 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 17, Table of Contents
ML08150032630 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 17, Quality Assurance
ML08150032830 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 1, Question and ResponseSafe Shutdown
Anticipated operational occurrence
ML08150033030 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Question and ResponseSafe Shutdown
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Tornado Generated Missile
Earthquake
Turbine Missile
Flow Induced Vibration
ML16138A06028 April 2016Project, Units 1 and 2 - Updated Final Safety Analysis Report, Revision 18FLEX
ML16207A53328 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 1, Table of ContentsIncorporated by reference
ML16207A53428 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of PlantSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Anticipated operational occurrence
Water Inventory Control
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Incorporated by reference
Design basis earthquake
Earthquake
Fuel cladding
Pressure boundary leak
Flow Induced Vibration
ML16207A53528 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 2, Table of ContentsFinite Element Analysis
Earthquake
ML16207A53628 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 2, Site Characteristics
ML16207A53728 April 2016Revision 18 to Updated Safety Analysis Report, Q&R 15.0-1 Through Q&R 15.7-3Safe Shutdown
Boric Acid
Shutdown Margin
Anticipated operational occurrence
ML16207A53828 April 2016Revision 18 to Updated Safety Analysis Report, Q&R 17.2-1 Through Q&R 17.2-7Coatings
Emergency Lighting
Fire Protection Program
ML16207A53928 April 2016Revision 18 to Updated Safety Analysis Report, List of Effective Pages
ML16207A54028 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 3, Table of ContentsTornado Generated Missile
ML16207A54128 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 3, Conformance with NRC General Design CriteriaSafe Shutdown
Boric Acid
Fitness for Duty
Shutdown Margin
Loop seal
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Commercial Grade Dedication
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Anchor Darling
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Finite Element Analysis
Tornado-Generated Missile
Tornado Generated Missile
Abnormal operational transient
Tornado Missile Protection
Surveillance Frequency Control Program
Design basis earthquake
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Through-Wall Leakage
Accidental discharge
Fire Protection Program
Power change
Flow Induced Vibration
GOTHIC
ML16207A54228 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 4, Table of Contents
ML16207A54328 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 4, ReactorBoric Acid
Shutdown Margin
Safe Shutdown Earthquake
Nondestructive Examination
Earthquake
Fuel cladding
Power change
ML16207A54428 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 5, Table of ContentsNondestructive Examination
Pressure Boundary Leakage
ML16207A54528 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant SystemSafe Shutdown
Boric Acid
Loop seal
Grab sample
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Liquid penetrant
Pressure Boundary Leakage
Power change
ML16207A54628 April 2016Revision 18 to Updated Safety Analysis Report, Section 2.5.6, Figures 2.5.6-1 Thru 2.5.6-21
ML16207A54828 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 6, Table of ContentsCoatings
ML16207A54928 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 6, Engineered Safety FeaturesBoric Acid
Packing leak
Ultimate heat sink
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Design basis earthquake
Fuel cladding
ML16207A55028 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 7, Table of ContentsSafe Shutdown
Boric Acid
Reactor Vessel Water Level
ML16207A55128 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Fitness for Duty
Health Physics Network
High winds
Shutdown Margin
Reactor Vessel Water Level
Grab sample
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Operator Manual Action
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
ML16207A55228 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 8, Table of Contents
ML16207A55328 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 8, Electric PowerSafe Shutdown
Boric Acid
Fire Barrier
Earthquake
ML16207A55428 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Table of ContentsSafe Shutdown
Ultimate heat sink
Grab sample
ML16207A55528 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary SystemsSafe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
Loop seal
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Emergency Lighting
Spent Fuel Pool Instrumentation
Earthquake
Control of Heavy Loads
Through Wall Leak
Fire Protection Program
ML16207A55628 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 10, Table of Contents
ML16207A55728 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Loop seal
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Stroke time
Tornado Missile
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Process Control Program
Earthquake
ML16207A55828 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 11, Table of Contents
ML16207A55928 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste ManagementBoric Acid
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
Process Control Program
Fuel cladding
Scaffolding
ML16207A56028 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 12, Table of Contents
ML16207A56128 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 12, Radiation ProtectionHigh Radiation Area
Anticipated operational occurrence
Coatings
Annual Radioactive Effluent Release Report
Deep Dose Equivalent
Fuel cladding
Scaffolding
ML16207A56228 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 13, Table of Contents
ML16207A56428 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 13, Conduct of OperationsSafe Shutdown
Fitness for Duty
Probabilistic Risk Assessment
Temporary Modification
Large early release frequency
Earthquake
Maintenance Rule Program
Fire Protection Program
Fire Watch