Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18078B311 | 19 March 2018 | LLC Submittal of Changes to Technical Specifications, Section 5.4, Procedures | Fire Protection Program |
ML18086B209 | 27 March 2018 | LLC Submittal of Minor Changes to Technical Specifications LCO 3.0.8, 3.1.9, Boron Dilution Control, Table 3.3.1-1, Module Protection System Instrumentation, 3.4.6 Bases, CVCS Isolation Valves, 3.5.1, Emergency ... | Boric Acid Ultimate heat sink Hydrostatic Pressure and Temperature Limits Report Surveillance Frequency Control Program |
ML19136A404 | 16 May 2019 | LLC Submittal of Changes to Design Certification Application Part 4, Technical Specifications | High Radiation Area Surveillance Frequency Control Program |
ML19183A491 | 2 July 2019 | LLC - Submittal of Changes to Technical Specifications Section 1.3, Completion Times and Section 3.7, Plant Systems, and Bases Section 3.3, Instrumentation, Section 3.4, Reactor Coolant System, Section 3.5, Passive Core Cooling | Unanalyzed Condition High Radiation Area Ultimate heat sink Hydrostatic Surveillance Frequency Control Program |