Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML011870065 | 1 November 1975 | License DPR-35, Amendment 13 | Shutdown Margin High Radiation Area Fuel cladding |
ML011920505 | 30 August 1985 | Issuance of Amendment 89, Incorporating Revised Radiological Effluent and Environmental Monitoring Limiting Conditions for Operation, Action Statements, and Surveillance Requirements | High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Annual Radiological Environmental Operating Report Fire Protection Program |
ML021980372 | 20 August 2002 | Issuance of Amendment No. 194, Change to Technical Specification Surveillance Requirement 3/4.7.B.1.a.2 and TS Bases 3/4.7.B.1, for the Standby Gas Treatment System | |
ML022400239 | 17 September 2002 | Relief, Code Relief Request from Section XI, the Pump and Valve Inservice Testing Program Regarding Inclusion of Additional Excess Flow Check Valves | |
ML030150006 | 14 January 2003 | License Amendment, Relocation of Shock Suppressors (Snubbers) Technical Specification Requirements to Updated Final Safety Analysis Report | Probabilistic Risk Assessment |
ML030570710 | 17 March 2003 | License Amendment, Relocation of Control Rod Block Functions | Scram Discharge Volume |
ML030640204 | 11 April 2003 | Relief Request, Examinations of Reactor Pressure Vessel Circumferential Shell Welds | Incorporated by reference |
ML030640432 | 28 March 2003 | License Amendment 197, Change to Applicability of Pressure-Temperature Curves | |
ML030690008 | 17 April 2003 | License Amendment, Issuance of Amendment Instrumentation Trip Level Settings and Calibration Intervals Changes | Safe Shutdown |
ML030970705 | 22 April 2003 | License Amendment 200 Emergency Core Cooling System Requirements During Shutdown Conditions | Reactor Vessel Water Level |
ML031110420 | 21 April 2003 | License Amendment, Issuance of Amendment Refueling Interlocks | Shutdown Margin |
ML031220007 | 9 May 2003 | Issuance of Amendment Appendix K Measurement Uncertainty Recovery - Power Uprate Request | Safe Shutdown Shutdown Margin Safety Limit Minimum Critical Power Ratio Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake MELLLA Earthquake Fire Protection Program Flow Induced Vibration |
ML031270149 | 8 May 2003 | Relief Request, Relief from ASME Code, Section XI, Appendix Viii, Supplement 10, Performance Demonstration for Ultrasonic Examination Systems | Non-Destructive Examination Incorporated by reference Dissimilar Metal Weld |
ML031760420 | 21 July 2003 | License Amendment, Relocation of Coolant Chemistry - Conductivity and Chlorides Technical Specification Requirement to Updated Final Safety Analysis Report | Probabilistic Risk Assessment |
ML032540158 | 30 September 2003 | Amendment 203 to License DPR-35, Adding New Technical Specification Requirement as TS 4.0.3 Consistent with TSTF-358, Revision 6 | Enforcement Discretion Probabilistic Risk Assessment Missed surveillance Large early release frequency |
ML033010190 | 14 November 2003 | License Amendment, Issuance of Amendment, Elimination of Requirements for Post-Accident Sampling System | Grab sample |
ML033290347 | 30 January 2004 | License Amendment, Issuance of Amendment, Jet Pump Surveillance Requirements | |
ML040260013 | 26 February 2004 | Pilgrim Relief Request Review, Relief Request No. 38, Relief from ASME Code, Section XI, Appendix Viii, Supplement 11, Qualification Requirements for Full Structural Overlaid Wrought Austenitic Piping Welds. | Weld Overlay Nondestructive Examination Incorporated by reference |
ML040780705 | 30 April 2004 | Relief Request, Fourth 10-Year Inservice Testing (IST) Program and Request for Approval of IST Relief Requests | Ultimate heat sink Incorporated by reference |
ML040820516 | 22 March 2004 | Relief Request Nos. RR-68, RR3-37, and PRR-34 (TAC MC1559, MC1560, & MC1561) | Boric Acid Non-Destructive Examination Incorporated by reference |
ML041070088 | 6 July 2004 | Relief Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case N-600 | |
ML041100009 | 22 July 2004 | License Amendment, Eliminate Requirements for Hydrogen Analyzers | Probabilistic Risk Assessment Fuel cladding |
ML041970450 | 17 August 2004 | License Amendment, Issuance of Amendment Re.: Multiple Control Rod Removal, Limiting Condition for Operation 3/4.10.D | Shutdown Margin Probabilistic Risk Assessment |
ML042300137 | 5 January 2005 | License Amendment, Revision to the Reactor Pressure Vessel Material Surveillance Program | |
ML042310008 | 6 January 2005 | Relief Request No. PRR-29, Relief from System Hydrostatic Test Requirements for Small Bore ASME Code Class 1 Reactor Coolant Pressure Boundary Vent, Drain and Branch Lines and Connections | High Radiation Area Hydrostatic Incorporated by reference |
ML042740664 | 14 October 2004 | Relief Request Nos. R-33, R-71, R 3-40(A) and R-41, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Unit Nos. 2 and No. 3 and Pilgrim Nuclear Power Station | Incorporated by reference |
ML042920358 | 25 February 2005 | Request - Alternative Repair Plan for Generic Letter 88-01, Reactor Pressure Vessel Nozzle-To Cap Weld in the Control Rod Drive Return Line | Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference Liquid penetrant |
ML043220442 | 9 December 2004 | ANO, Units 1 & 2, Grand Gulf, River Bend, Waterford, Indian Point Units 1, 2, & 3; FitzPatrick, Pilgrim and Vermont Yankee - Revision to the Quality Assurance Program Manual (QAPM) | |
ML043490243 | 27 December 2004 | Issuance of Amendment Engineering Evaluation Submitted Pursuant to Technical Specifications Section 3.6.D.3 and 3.6.D.4 | |
ML050050486 | 2 February 2005 | Issuance of Amendment Changes to Technical Specifications Table 3.2.C-1 | |
ML050180493 | 16 March 2005 | License Amendment No. 211, Revise Reactor Vessel Hydrostatic and Leak Testing Requirements | Hydrostatic |
ML051870003 | 29 August 2005 | Issuance of License Amendment 217, Surveillance Frequency Improvements | Power change |
ML051870257 | 29 July 2005 | License Amendment 216 Revised Action for Scram Discharge Volume Vent and Drain Valves | Scram Discharge Volume |
ML051990276 | 29 August 2005 | Entergy Relief Request PR-03 High-Pressure Coolant Injection Pump | Incorporated by reference |
ML053140433 | 10 April 2006 | Issuance of Amendment Revised Applicability for Containment Oxygen and Differential Pressure Limits | Fuel cladding |
ML060120127 | 17 February 2006 | Relief Request No. PPR-05 | Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML060170119 | 12 April 2006 | Issuance of Amendment Single Recirculation Loop Operation | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Abnormal operational transient Fuel cladding |
ML060240055 | 22 March 2006 | Relief Request No. PRR-9, | Weld Overlay Incorporated by reference Dissimilar Metal Weld |
ML060340028 | 21 March 2006 | Relief Request No. PRR-11, | Incorporated by reference |
ML060600040 | 13 April 2006 | Issuance of Amendment Removal of Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement | Power-Operated Valves |
ML060660132 | 5 April 2006 | Relief Request No. PIL-05-R-002, | VT-2 Incorporated by reference |
ML060740214 | 13 April 2006 | License Amendment 221 Regarding Revised Rod Worth Minmizer Bypass Allowances | |
ML060870611 | 8 April 1993 | Memo from Lemoine Cunningham to Ronald Eaton, Subject: Proposed Disposal of Slightly Contaminated Radioactive Construction Soil Onsite at the Pilgrim Nuclear Power Plant | Offsite Dose Calculation Manual |
ML061420470 | 29 June 2006 | Relief Request No. PIL-05-R-001, TAC No. MC8299) | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
ML061720068 | 9 August 2006 | Issuance of License Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities | |
ML061840032 | 4 August 2006 | Issuance of License Amendment 222 Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature | |
ML062120154 | 2 October 2006 | GGNS, IP-1, IP-2, IP-3, Pilgrim, River Bend, Vermont Yankee, and Waterford - Application to Use Effective Dose Equivalent Weighting Factors for External Exposure | |
ML062230281 | 2 October 2006 | GGNS, IP1, IP2, IP3, Pilgrim, River Bend, Vermont Yankee, and Waterford - Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits - Letter to Entergy Operations, Inc. Enclosing Safety Evaluation | Mururoa |
ML062280304 | 14 September 2006 | Issuance of Amendment Relocation of Technical Specifications | Probabilistic Risk Assessment |
ML062430337 | 20 September 2006 | License Amendment 225 Regarding Revised Reactor Coolant System Leakage Detection Instrumentation Requirements and Actions | Grab sample Probabilistic Risk Assessment |