ML20054F171 | 7 June 1982 | RO 82-14:on 820605,w/reactor in Operating Condition 2 at 50 X 10-6% Power,Review of Shift Supervisor Log Revealed Primary Water Alpha Activity of 7.46 X 10-6 Uci/Gm.Reactor Shutdown Conducted 820605 in Accordance W/Tech Spec | |
ML20062D160 | 26 July 1982 | Ro:On 820726,internal Portion of Fire Suppression Water Sys Removed from Svc in Order to Replace Fire Hose Cabinets Rendering Fire Suppression Water Sys Inoperable.Backup Capability Provided | |
ML20128N914 | 18 July 1985 | Special Rept 85-01:providing Results of Sampling & Analysis Actions & Addl Operational Info for Six Occasions When Reactor Thermal Power Changed by More than 15% of Rated Thermal Power within 1 H | Power change |
ML20138B786 | 11 March 1986 | Special Rept:On 860311,internal Portion of High Pressure Svc Water Sys Which Supplies Fire Suppression Sys Removed from Svc to Replace Valve Required to Be Tested by Inservice Testing Program | |
ML20138L745 | 8 October 1985 | Special Rept:Discusses Circumstances Which Led to Inaccuracies in Personnel Cumulative Lifetime Dose Records. Cumulative Permanent Doses in Radiation Dosimetry Rept Do Not Agree W/Records Maintained in Computer File | |
ML20138L843 | 21 October 1985 | Special Rept 85-02:on 850725,0909 & 14,reactor Thermal Power Changed by More than 15% of Rated Thermal Power within 1 H. Power History,Fuel Burnup,Cleanup Flow History,Offgas Activity Levels & Gross Alpha Activity Levels Discussed | Power change |
ML20141P124 | 6 March 1986 | Incident Rept DPC-86-1:on 860104,seal Inject Supply Line Separated at Swagelock Fitting,Spraying Water & Resulting in Reactor Shutdown.Cause Unknown.Mechanical Seal on CRD 2 Reworked | |
ML20211E497 | 4 June 1986 | Special Rept 86-02:on 860307 & 0525,thermal Power Changed by Greater than 15% of Rated Thermal Power within 1 H on Three Occasions.Caused by Bus 1B Power Loss,Reactor Forced Circulation Pump Trip & Control Air Sys | Power change |
ML20235S244 | 16 February 1989 | Suppl to 880104 Special Rept Re Inoperability of High Pressure Svc Water Diesel 1B.Fuel Supplu Sys Was Source of Problem.Fuel Supply Sys Will Be Replaced W/Above Ground Tanks for Both Diesels | |
ML20236W273 | 23 November 1987 | Special Rept:On 871028,following Initiation of 24 H Run for 18-month Diesel Generator Test,Emergency Diesel Generator 1B Stopped Running.No Cause for Trip Determined.Procedure Will Be Revised So Alarm Conditions Tested Before Run | |
ML20236X008 | 18 November 1987 | Special Rept Re Inoperability of Fire Suppression Water Sys. Internal Portion of Sys Removed from Svc on 871118 to Replace Section of Piping.Initially Reported on 871118.Plant Permanently Shut Down & Reactor Defueled | |
ML20236Y215 | 15 May 1987 | Special Rept 87-02:on 870216,reactor Manually Scrammed Due to Erroneous Indication of Low Voltage on Turbine Bldg MCC1A.On 870406,reactor Power Dropped Following Trip of 1A Forced Circulation Pump | Power change |
ML20237C678 | 30 November 1987 | Special Rept:On 871118,internal Portion of Fire Suppression Water Sys Removed from Svc to Replace Section of Piping.On 871120,piping Successfully Hydrostatically Tested & Fire Suppression Sys Returned to Svc |