Issue date | Title | Topic | |
---|---|---|---|
ML17341B652 | 30 November 1981 | Evaluation of GE & Sec Chemical Procedures for Post-Accident Analysis of Reactor Coolant Samples. | Boric Acid Grab sample |
ML19348A073 | 28 September 1981 | Evaluation of Emergency Response Facilities for Enrico Fermi 2. | Health Physics Network High winds |
ML20027C119 | 25 August 1982 | Audit for Mark I Containment Long-Term Program - Structural Analysis,Enrico Fermi Atomic Power Plant, Technical Evaluation Rept | Safe Shutdown Earthquake Finite Element Analysis |
ML20027C120 | 30 September 1982 | Technical Evaluation of Fermi-2 Plant-Unique Analysis Rept. | |
ML20044C200 | 31 January 1993 | High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide for Enrico Fermi Atomic Power Plant,Unit 2 | |
ML20052C489 | 31 March 1982 | Reaudit of Environ Qualification of Safety-Related Electrical Equipment at Enrico Fermi Atomic Power Plant, Unit 2, Technical Evaluation Rept | |
ML20059J606 | 31 October 1993 | Spurious Reactor Scram W/Loss of Condenser Vacuum,Trip Rept:Onsite Analysis of Human Factors of 930813 Event | |
ML20062N946 | 30 June 1982 | Control of Heavy Loads at Nuclear Power Plants,Enrico Fermi Atomic Power Plant,Unit 2, Draft Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20069H139 | 3 June 1994 | Technical Evaluation Rept Evaluation of Utility Response to Suppl 1 NRC Bulletin 90-01:Feri-2 | |
ML20070Q680 | 8 October 1982 | Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ | |
ML20084P026 | 31 March 1983 | Control of Heavy Loads at Nuclear Power Plants,Enrico Fermi Atomic Power Plant,Unit 2 (Phase I) | Safe Shutdown Coatings Control of Heavy Loads |
ML20085J790 | 30 September 1983 | Control of Heavy Loads at Nuclear Power Plants,Enrico Fermi Atomic Power Plant,Unit 2,Phase II, Draft Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20097F020 | 31 August 1984 | Technical Assistance in Conduct of Insp Program at Various Region III Nuclear Power Plants, Monthly Progress Rept for Aug 1984 | |
ML20127G148 | 30 September 1992 | Technical Evaluation Rept for Evaluation of ODCM Rev 3, Enrico Fermi Atomic Power Plant,Unit 2 | Offsite Dose Calculation Manual Anticipated operational occurrence Process Control Program Annual Radiological Effluent Release Report |
ML20195B315 | 28 February 1986 | Evaluations of Bearing Failures in Fairbanks-Morse Diesel Engines at Enrico Fermi Unit 2 Reactor | |
ML20202J093 | 28 February 1986 | Insp Rept,South Reactor Feedwater Pump Turbine Failure. Contract Number Illegible.Related Info Encl | Fire Barrier Operating Basis Earthquake Exemption Request Earthquake |
ML20204E978 | 25 August 1982 | Audit for Mark I Containment Long-Term Program-Structural Analysis, Technical Evaluation Rept | Safe Shutdown Earthquake Finite Element Analysis |
ML20204G514 | 20 July 1983 | Audit for Mark I Containment Long-Term Program - Structural Analysis of Torus-Attached Piping,Enrico Fermi Unit 2, Technical Evaluation Rept | Finite Element Analysis |
ML20212P181 | 14 February 1986 | Insp Rept,South Reactor Feedwater Pump Turbine Failure | |
ML20214G408 | 31 March 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Selected GE BWR Plants (Cooper,Dresden 2 & 3,Fermi 2 & Fitzpatrick) | |
ML20214R726 | 31 March 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Fermi-2, Final Informal Rept | |
ML20215M006 | 30 April 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Enrico Fermi-2, Informal Rept | |
ML20234C959 | 2 June 1987 | Final Technical Assistance Rept for Mar-May 1987 for Fermi Nuclear Station Unit 2 | Reactor Vessel Water Level Post Accident Monitoring Backfit |
ML20235S883 | 31 August 1987 | Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,Enrico Fermi Atomic Plant Unit 2 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Scram Discharge Volume |
ML20245J878 | 22 April 1988 | Review of Operating Experience for Fermi Unit 2 for 1987-1988, Letter Rept | Unanalyzed Condition Boric Acid Fire Protection Program |
ML20246B815 | 30 April 1989 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept |