Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML0234703006 December 2002to Process Safety Requirements PSR-1, Requirements for Liquid Transfers of Fissile Material.Unanalyzed Condition
ML0307200346 March 2003Transmittal of West Valley Demonstration Project Procedures PSR-3 (Revision 3), PSR-5 (Revision 3), & WVDP-218 (Revision 11)
ML12235A20925 June 2012Radiological Control Procedures- Performing Radiation and Contamination SurveysHigh Radiation Area
ML12261A13219 April 2012RP-RPP500.00, Radiation Protection Plan for the Retained Premises.
ML12261A13519 April 2012RP-RPP001.00, Radiation Safety Committee for the Retained Premises.
ML12261A13619 April 2012RP-RPP002.00, Radiation Safety Officer for the Retained Premises.
ML12261A25419 April 2012RP-RPP003.00, Annual Retained Premises Radiation Protection Program Audit.
ML12261A25519 April 2012RP-RPP004.01, Training and Instruction of Radioactive Material Users on the Retained Premises.
ML12261A25619 April 2012RP-RPP005.00, Radiation and Contamination Surveys on the Retained Premises.
ML12261A25719 April 2012RP-RPP006.00, ALARA Policy and Reviews for the Retained Premises.
ML12261A25819 April 2012RP-RPP007.00, Radiation Safety Evaluations for the Retained Premises.
ML12261A25919 April 2012RP-RPP008.00, Personnel Decontamination Procedure for the Retained Premises.
ML12261A26019 April 2012RP-RPP009.00, Use of Personnel Dosimetry on the Retained Premises.
ML12261A26119 April 2012RP-RPP010.00, Personnel Monitoring on the Retained Premises.
ML12261A26226 June 2012RP-RPP011.00, Instrument Calibration for the Retained Premises.
ML12261A26326 June 2012RP-RPP012.00, Bicron Microrem Survey Meter, Operation Procedure for the Retained Premises.
ML12261A26426 June 2012RP-RPP013.00, Ludlum 2241-2 Ratemeter/Scaler, Operation Procedure for the Retained Premises.