Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19211C07320 December 1979Draws Attention to 791207 ALAB-573 Re Author Position That Jo Daviess County Amended Contention Iii(G) Constitutes Challenge to 10CFR50,App 1
ML19247B2226 July 1979Forwards J Runyon,E Gogel & Citizens Against Nuclear Power Petition for Intervention Re CP & Early Site Review
ML19254D1857 September 1979Forwards,Per D Goddard Request,Comm Ed 790627 Ltr Announcing Delay Until 1990 & 1991 in Fuel Load Dates.Change in Schedule Is Caused by TMI-2 Accident Procedures & Reflected in Aug 1979 Carroll County Site Suitability Repts
ML19256F9015 December 1979Notifies That Site Suitability - Site Safety Rept & Site Suitability - Environ Rept Will Be Updated & Forwarded to ASLB in Response to 791204 Telcon
ML20024D5801 August 1983Submits Quarterly Status Rept.Projected Inservice Dates for Units 1 & 2 Remain 2000 & 2001,respectively.Circumstances Re Possible Withdrawal of One Prospective Joint Owner Have Not Changed Significantly.Related Correspondence
ML20027D5181 November 1982Provides Quarterly Status Rept on Developments in Proceeding.No Matl Changes Occurred Since 820730 Ltr. Projected Inservice Dates Modified.Circumstances Re Possible Withdrawal of Joint Owner Unchanged.Related Correspondence
ML20028G2321 February 1983Submits Quarterly Status Rept on Proceeding Per ASLB Request.Projected Inservice Date Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001.Related Correspondence
ML20058G70828 July 1982Requests Hearings Be Deferred Until Const Plans Are More Certain in Response to ASLB 820707 Memorandum & Order. Deferral Would Not Prejudice Rights of Parties.Related Correspondence
ML20073S1532 May 1983Provides Quarterly Status Rept on Developments.Projected Inservice Dates Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001