Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML03142003313 May 2003Comment by Audrey Bennett, Victoria Winfrey, Alan Childs, Darelynn Lehto, Prairie Island Indian Community, on Nrc'S Proposed Package Performance Study & Draft NUREG-1768
ML04009025630 December 2003Comment (6) of Edward J. Weinkam, NMC, Regarding Draft Revision 9 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors.
ML04134024829 April 2004Comment (1) Carl E. Parry Endorsing Position That Activities Proposed at the Palisades Nuclear Plant Could Have Been Implemented in Accordance with 10 CFR 50.59, Changes, Tests, and Experiments, Without Seeking Prior NRC ApprovalControl of Heavy Loads
ML05116003514 April 2005Comment (10) of Marsha Puthoff Opposing Grant Permit for a New Reactor at Clinton, Illinois
ML05242049728 July 2005Comment (2) of Nancy Ann Whaley Re Relicensing of Palisades
ML05242050119 August 2005Comment (3) of Kenneth Richards to the Editor Concerning the Placement of Above Ground, Vsc 24 Nuclear Fuel Rod Storage Casks at the Palisades Nuclear Power Plant
ML05242050318 August 2005Comment (5) of Wayne Rendell Regarding the Scope of the Environmental Review for the Palisades Nuclear Plant Located in Covert Township
ML05242050620 August 2005Comment (6) of Swami Tapasanarda Opposing Re-Licensing Pallisades Nuclear Plant in Michigan
ML05251038922 August 2005Comment (7) on Palisades 20-year Extension
ML0534301212 December 2005Comment (14) of Leonard L. Sueper on the Reactor Oversight ProcessBackfit
ML06090004320 March 2006Comment (1) of Ruben Dal Monte P.E., on NUREG 1437, Supplement 27 Draft, Re Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palisades Nuclear Plant; Draft Report for Comments, Us NRC February 2006License Renewal
ML0612100432 April 2006Comment (5) of A. Hanson, Strongly Opposing the Proposed 20 Year License Extension at Palisades Nuclear Power PlantEarthquake
Chernobyl
Environmental Justice
ML0612100442 April 2006Comment (4) of N. Hanson, Strongly Opposing the Proposed 20 Year License Extension at Palisades Nuclear Power PlantEarthquake
Chernobyl
Environmental Justice
ML06121005110 April 2006Comment (3) of Paul C. French, Jr., Supporting Renewing License for Palisades Nuclear Generating Plant for Another 20 Years
ML06124020623 April 2006Comment (6) of Marguerite Callaghan for Renewal of License for Palisades Nuclear Facility
ML0613200361 May 2006Comment (7) of Diane Byme, Re While for Safe, New, Nuclear Plants/Technology, Feels in Best Interest of Public for Safety Issues to Close Down Palisades and Not Renew LicenseChernobyl
ML06137050915 May 2006Comment (8) of P. Harden Draft Supplement 27 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG 1437, for Palisades Nuclear Plant License RenewalLicense Renewal
ML06146014619 April 2006Comment (9) of Morgan Dill, Opposing License Renewal of PalisadesEarthquake
Environmental Justice
ML06157002015 May 2006Comment (11) of Terry and Laura O'Brien on NUREG-1437, Supplement 27 Re Opposition of the Renewal of the Palisades Nuclear Power Plant LicenseLicense Renewal
ML06157002218 May 2006Comment (12) of Kevin Kamps on NUREG-1437, Supplement 27, DraftEnvironmental Justice
ML06157002515 May 2006Comment (13) of Michael T. Chezik for Renewing License for Palisades Nuclear PlantLicense Renewal
ML06157004218 May 2006Comment (10) of Various, on NUREG-1437, Supplement 27 to Generic Environmental Impact Statement for License Renewal of Palisades Nuclear Power PlantBoric Acid
High winds
License Renewal
Earthquake
Chernobyl
Environment Report
Inattentive
Affidavit
Depleted uranium
ML06164011426 May 2006Comment (14) of Kenneth A. Westlake on Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 27: Palisades Nuclear Plant, Van Buren County, Michigan, Draft Report, NUREG-1437License Renewal
ML06165025723 February 2006Comment (15) of Connie & Jim Mcallister on Public Meeting to Discuss Draft Environmental Impact Statement for Palisades Nuclear Plant
ML06186006922 June 2006Comment (16) of Terry J. Lodge Regarding Notice of Pertinent New Case Law Affecting Proceeding: Request for Redraft of EIS, Additional Comment Period, and for New Period for Receipt of Contentions on TerrorismProbabilistic Risk Assessment
Earthquake
ML06192048019 June 2006Comment (17) of Martha Macfarlane Faes, Re ER-05-249, Palisades Nuclear Power Plant License Renewal, Covert Township, Van Buren County (NRC)
ML0625500625 September 2006Comment (22) of Kimon Kotos on Nrc'S Low-Level Radioactive Waste Program. Supports Position Submitted by Nirs and Recommends Not to Renew Palisades License Extension
ML06362042312 December 2006Comment (1) of K. A. Westlake on Behalf of EPA Re Generic Environmental Impact Statement for License Renewal of Nuclear Plant, Supplement 27: Palisades, Final Report, NUREG-1437License Renewal
ML0714301026 April 2007Comment (32) of Eleanor I. Gavin & Paul H. Gavin Supporting Request That the National Environmental Policy Act (NEPA) Include in It'S Decision-Making Documents the Consideration of the Impacts of Intensely Radioactive Spent Fuel Rods
ML07187003129 June 2007Comment (18) of Robert R. Loux State of Nevada Comments on Nrc'S Notice of Availability of Supplement to the Environmental Assessment (Sea) and Draft Finding of No Significant Impact for the Diablo Canyon Independent Spent Fuel Storage Inst
ML07296045512 October 2007Comment (27) of P. Musegaas on Behalf of Riverkeeper Re License Renewal Application for Indian Point, Units 2 and 3, in Response to Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping ProcessAging Management
License Renewal
Siren
ML08042030421 January 2008Comment (1) of Tom Gurdziel Opposing the Inclusion of Vermont Yankee, Indian Point Unit 1, Indian Point Unit 2, and Indian Point Unit 3 in a Holding Company Owned by Entergy
ML14309A19131 October 2014Comment (4) of Sandy Mccomb on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
ML14309A19230 October 2014Comment (00002) of Michael Keegan on Behalf of Don'T Waste Michigan on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
ML15139A02912 May 2015Comment (6) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock RuleAging Management
Turbine Missile
ML15139A03012 May 2015Comment (7) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock RuleProbabilistic Risk Assessment
ML15139A03212 May 2015Comment (9) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock Rule
ML15139A03312 May 2015Comment (11) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock RuleCoatings
Earthquake
Weak link
ML15139A03412 May 2015Comment (12) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock RuleTornado Missile
Earthquake
ML15139A08212 May 2015Comment (15) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock Rule
ML15139A08312 May 2015Comment (10) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock RuleProbabilistic Risk Assessment
ML16015A3277 January 2016Comment (2) of Jan Boudart Regarding Guidance: Subsequent License Renewal
ML21040A2117 February 2021Comment (1) of Mark Muhich on Palisade Nuclear Plant and Big Rock Point Plant Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments
ML21040A2158 February 2021Comment (2) of Stephen C. Brown on Palisade Nuclear Plant and Big Rock Point Plant Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments
ML21040A2178 February 2021Comment (3) of Richard Barron on Palisades and Big Rock Point Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments
ML21041A1269 February 2021Comment (4) of Cathy Sayre on Palisades Nuclear Plant and Big Rock Point Plant Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments
ML21069A0393 March 2021Comment (173) of Kevin on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2
ML22355A14220 December 2022Comment (2) from Karen Schaumann Re Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report
ML22355A14720 December 2022Comment (3) of Matthew C on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report
ML22355A14821 December 2022Comment (4) of Shawn Connors on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report