MONTHYEARML17179A2462017-06-22022 June 2017 Comment (4) of Schuyler Gould Regarding Vermont Yankee Nuclear Power Station; Entergy Nuclear Operations, Inc.; Consideration of Approval of Transfer of License and Conforming Amendment ML17179A2452017-06-21021 June 2017 Comment (3) of Anonymous Regarding Vermont Yankee Nuclear Power Station; Entergy Nuclear Operations, Inc.; Consideration of Approval of Transfer of License and Conforming Amendment ML17163A0882017-06-0303 June 2017 Comment (2) of Robert Oeser on Vermont Yankee Power Station; Energy Nuclear Operations, Inc.; Consideration of Approval of Transfer of License and Conforming Amendment ML17163A0872017-05-29029 May 2017 Comment (1) of Richard Holschuh on Behalf of Elnu Abenaki Tribe on Vermont Yankee Power Station; Energy Nuclear Operations, Inc.; Consideration of Approval of Transfer of License and Conforming Amendment ML15159A1832015-06-0101 June 2015 Comment (2) of Kyle Landis-Marinello on Behalf of State of VT on Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station; Draft Environmental Assessment and Finding of No Significant Impact; Request for Comment ML15159A1842015-06-0101 June 2015 Comment (3) of Sandra and Charles Kosterman Opposing Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station; Draft Environmental Assessment and Finding of No Significant Impact; Request for Comment ML15138A0942015-05-0101 May 2015 Comment (1) of Clay Turnbull on Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station; Draft Environmental Assessment and Finding of No Significant Impact; Request for Comment ML15096A4422015-03-23023 March 2015 Comment (31) by Wendy Lapointe on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4322015-03-23023 March 2015 Comment (22) by David Jacke on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4332015-03-23023 March 2015 Comment (23) by Constance Harvard on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4342015-03-23023 March 2015 Comment (24) by Erik Hoffner on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4352015-03-23023 March 2015 Comment (25) by Anonymous Individual on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4362015-03-23023 March 2015 Comment (26) by Nancy Hazard on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4372015-03-23023 March 2015 Comment (27) by John Tuthill on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4382015-03-23023 March 2015 Comment (28) by Beth Watrous on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4392015-03-23023 March 2015 Comment (29) of Maggie Gunderson on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4402015-03-23023 March 2015 Comment (30) by Thomas Gajewski on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4432015-03-23023 March 2015 Comment (32) by Charles Kosterman on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4452015-03-23023 March 2015 Comment (33) by John Cevasco on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4472015-03-23023 March 2015 Comment (34) by Virginia Hastings on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4522015-03-23023 March 2015 Comment (35) by Carol Levin on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4582015-03-23023 March 2015 Comment (36) by Louise Amyot on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4602015-03-23023 March 2015 Comment (38) by Suzanne Carlson on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4612015-03-23023 March 2015 Comment (39) by Michael Rice on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4622015-03-23023 March 2015 Comment (40) by Susan Pelis on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4632015-03-23023 March 2015 Comment (41) by Elyssa Serrilli on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4592015-03-23023 March 2015 Comment (37) by Loren Kramer on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4652015-03-23023 March 2015 Comment (43) by Tim Murphy on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4292015-03-22022 March 2015 Comment (19) by Leslie Sachs on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4302015-03-22022 March 2015 Comment (20) by Jon King on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4642015-03-22022 March 2015 Comment (42) by Nancy Meagher on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4672015-03-20020 March 2015 Comment (17) by Anonymous Individual on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0502015-03-20020 March 2015 Comment (4) of Anonymous Individual on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4692015-03-20020 March 2015 Comment (16) by Ulrike Von Molrke on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4662015-03-20020 March 2015 Comment (44) by Christopher Williams on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15084A2242015-03-20020 March 2015 Comment (13) of Clay Turnbull Request for Extension of Time to File Public Comments ML15096A4272015-03-20020 March 2015 Comment (18) by Nancy First on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15097A0792015-03-19019 March 2015 Comment (2) by State of Vermont on NRC-2015-0029, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations ML15091A2552015-03-19019 March 2015 Comment (14) of Peter B. Elwell on Behalf of Town of Brattleboro on Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0662015-03-18018 March 2015 Comment (12) of Susan Lantz on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15096A4682015-03-18018 March 2015 Comment (15) by an Anonymous Individual on NRC-2015-0004 Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0652015-03-17017 March 2015 Comment (11) of Bob Dickerman on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0632015-03-15015 March 2015 Comment (10) of Anne Stevens on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0622015-03-15015 March 2015 Comment (9) of Sue Prent on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0612015-03-13013 March 2015 Comment (8) of D. Brigham on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0602015-03-12012 March 2015 Comment (7) of Robert Oeser Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A2342015-03-0606 March 2015 Comment (6) by William Irwin, on Behalf of State of Vermont Department of Health, Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0592015-02-27027 February 2015 Comment (5) of Valerie Stuart on Entergy Nuclear Operations, Inc., Venriont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15082A0492015-02-19019 February 2015 Comment (3) of Norton Garber on Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report ML15049A0322015-02-0909 February 2015 Comment (23) of James Bailey Opposing Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station; License Amendment Application; Reopening of Public Comment Period 2017-06-03
[Table view] |
Text
Ti ES
~,~;C
/A2/wA
- :7:2' 3 M~ 2: 33 PO Box 215 East Charleston, VT 05833\
April 6, 2007 Secretary of the U.S. Nuclear Regulatory Commission Washington, DC 30555-0001 (also sent electronically to VermontYankeeEIS(nrc. ov)
Re: Massachusetts Attorney General's appeal to NEPA concerning new and significant information about the safety and security of spent fuel assemblies
Dear Secretary of the U.S. Nuclear Regulatory Commission,
INSERT:" I wrote this.letter inMarch but: hav.e wajted to sendit.?As -youknow, the.MA Atty.
Qeneral has now'filed witlrthe .First U.S.-Circuit CourtLThen onthe anniversary.of TMIi U.S.
Senator Bernie Sanders (VT) introduced legislation (S-1008) to increase the ability for governors and state utility boards to request the NRC to grant Independent Safety Assessments (ISA) based on today's new realities.
But my March letter still holds:
Because Vermont Yankee is so near his state, I support the Massachusetts Attorney General's request that the National Environmental Policy Act (NEPA) include in its decision-making documents the consideration of the impacts of intensely radioactive spent fuel rods.
These rods come grouped in assemblies which hang inside awater-filled cooling pool. After cooled, they are down-loaded in shortterm dry-casks for transportation to Yucca Mountain. One railroad dry cask contains the equivalent of 250 Hiroshima bombs. According to a talk, delivered in 2005 by Independent Consultant Dr. Marvin Resnikoff - nuclear physicist for the Radiation Waste Management Associates - the Vermont Yankee pool had back then enough fuel
- assemblies to fill 60 to 80 of this type of dry cask.,
. B°' 1 * .. .
TheNRC's missio.nip to protectithe environment andthepublic health from the.effects of -
ioni.zingradiation;.whether, it be: fromeamctors or frorx the.highly radioativie'stpent fuel .hey produce.
< ,7- .
The Federal, long term nuclear waste facility at Yucca Mountain, Nevada is still in construction and already over committed. In September, 2005, there were 210,000 tons of spent fuel waiting to be disposed of. Yucca Mountain is designed to accept only one-third of that, i.e. 70,000 tons.
There is no prospect for the long term storage of the other 140,000 metric tons. The Vermont Yankee, between 2005 to the end of first license, 2012, will have produced an additional 1.40 metric tons of spent fuel assemblies. By 2012 many cooled assemblies will have been removed and stored in short term dry cask canisters on site. If Entergy is given the go-ahead by the Vermont State Legislature, the Vermont Yankee will be permitted to operate until 2032. It will have produced an additional540 metric tons of spentfuel. By that time, with the spent fuel build-up at the other 102 reactors across the nation, many more long term storage sites must be accepting.
The Massachusetts Attorney General, and other attorneys general across the country, are concerned about how the short term packaging will endure the elongated waiting period. The Connecticut River could rise and flood the area. With global warming this is a growing concern.
If these casks eventually join the other reactors' casks on'the long trip to Nevada, they will have to be further hardened before transport. How will they be reinforced? How much will it cost?
Who will pay?
These are "new and significant problems" that pertain to storage. They have emerged during the 35 years of Vermont Yankee's first license period. They need to be solved before the Vermont Legislature can consider a twenty year relicensing. I list just two:
- 1. It is new and significant that there is still strong resistarice against storage at Yucca Mountain. Other states, New Hampshire, for example -- have flatly refused to take it. Over time, "short term" dry cask storage units stored near reactors will deteriorate. A nation stressed by global warming reparations will be hard put to restore all these storage units, and there may be moisture seeping in, due to a recent flood. Highly radioactive Strontium, Cesium, Plutonium, etc. may be already breaking through the cask barrier.
- 2. It is new and significant that polarization against the U.S. has increased since the second Iraq war and attack from the air.is of greater concern. The Vermont Yankee storage pool is seven stories high and is hardened against impact from the side but its roof is not hardened to withstand a plane crash or bombing.
In conclusion, Mr. Secretary of the NRC, I, for one, urge that NEPA's decision making documents include deep scrutiny of the new, significant and very possible impacts of spent fuel storage, namely:
- 1. - an attack on the cooling pool from above - causing the pool to drain, the hot fuel assemblies to be exposed, the radioactive assemblies' zirconium cladding to burn, and the ionizing radiation to be released in smoke causing death and a sharp increase in cancer
throughout Vermont into lower Quebec, and into New Hampshire, most of central and western Massachusetts and northern Connecticut;
- 2. - the growing need, since global warming, for dry-cask units to be kept on high ground, completely isolated from a flooding Connecticut River or any other flood water seepage, in hardenedbunker pits with regular human monitoring to prevent diversion by ground attack; and
- 3. - the assurance that the long trips to Yucca Mountain be safe and secure, without use of tunnels where fires could be compounded as in the recent Baltimore tunnel fire..
In conjunction with the above, please, Mr. Secretary, support the exclusion of the Waste Confidence Rule, so.that the NRC will be in the position to take on, without delay, its responsibilityfor the security and safety ofspentfuel rod assemblies. All this because the mission of the NRC is, first and foremost, public health and safety.
Thank you for considering this letter.
Sincerely, Eleanor I. Gavin, RN, retired I have been working all my life on the design of nuclear reactors, under the assumption that Yucca Mountain would be ready on time. Now I realize that it is not and is already over c~ommitted. I would like to see all reactors reach their end of life safely, and see that the final spent fuel disposal is secured.
Paul H. Gavin, nuclear engineer,. retired PO Box 215 East Charleston, VT 05833 elliegavinacomcast.org phgavin@comcast.or2