Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20084R65224 February 1984FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl
ML20084S05320 March 1984FOIA Request for IE Insp Rept 50-454/80-04 to Be Placed in PDR
ML20093J99127 July 1984Forwards Errata Sheet & Muffett,Little & Love 840620-21 Depositions.Related Correspondence
ML20094F3887 August 1984Forwards Transcript of Kd Ward 840621 Deposition in Glen Ellyn,Il.Related Correspondence
ML20094R06020 August 1984Forwards Transcript of CC Stokes 840817 Deposition.Related Correspondence
ML20207K01519 December 1986FOIA Request That Encls to Insp Rept 50-247/86-26,Byron Semiannual Radioactive Effluent Rept & Millstone 1 & 2 SALP Rept Be Placed in PDR
ML20207R23227 February 1987FOIA Request for Rev 4 to Sargent & Lundy Project Instruction PI-BB-27, Receipt,Review,Reanalysis,Redesign & As-Built Piping Reconciliation Used at Facility
ML20209D16929 October 1986Forwards Rev 3 to EGG-EA-7035, Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Braidwood Units 1 & 2,Bryon Station Units 1 & 2,Callaway Plant Unit 1,Indian Point.... Licensees Conform to All Items W/Exception of Trojan
ML20209H9534 September 1986Wishes to Ensure That Violations Noted in Insp Repts 50-454/84-51 & 50-455/84-35 Re Failure to Implement Piping Dimensional Insp Measurement Program Becomes Part of Official Record & Will Serve to Demonstrate Concerns
ML20210T44427 March 1986FOIA Request for Initial (Cycle 1) Startup Test Repts & Suppls for Seven Plants & Original Monthly Operating Rept for June 1983 for Virgil C Summer Plant
ML20214R4058 May 1987FOIA Request for Region Input to NRR Re Status of Listed Plants Readiness for Ol,Per IE Manual Chapter 94300
ML20214R6134 March 1987Forwards Final Conformance to Generic Ltr 83-28,Item 2.2.2, Vendor Interface Programs (All Other Safety-Related Components),Byron Station Units 1 & 2, Technical Evaluation Rept.Plant Conforms to Item 2.2.2
ML20215L98022 May 1987Forwards Byron Nuclear Plant Essential Svc Water Cooling Tower Test Plan Preliminary Evaluation, Ltr Rept Based on Presentation to NRC on 870513.Rept Completes Work Scope Requirements of Task 4-9 (TACs 64944 & 64945)
ML20234B62112 May 1987Requests That Listed Plants Be Added to Encl 870508 FOIA Request Re 94300 Region Input on Plant Readiness
ML20234B6578 May 1987FOIA Request for Placement,In Pdr,Region Input to NRC Headquarters,Nrr Re Status of Listed Plants in Terms of Plant Readiness for OL IE Manual,Chapter 94300
ML20235A12516 December 1987Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs
ML20247P94117 May 1989FOIA Request for Final Open Item Transmittal Ltrs Per NRC Insp Procedure 94300B for Listed Plants