Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19347D268 | 31 December 1979 | Prepared Testimony of Jk Horton,Hf Christie,Ap Haub,Ac Smith,Md Whyte,We Ferguson,Rv Knapp,Et Al,Re Util Request for Rate Increase.Prospectus Encl | Minimum staff |
ML19347D271 | 16 April 1980 | Prepared Testimony & Exhibits of Rj Cadenasso,On Behalf of CA Association of Util Shareholders,Re General Rate Case | |
ML19347D274 | 18 March 1980 | Prepared Testimony of Dt Gardner Re Study of Cost of Capital & Rate of Return for Southern CA Edison Co | |
ML19347D275 | 30 November 1980 | Prepared Testimony of Hf Christie Re Request for General Rate Increase Proceeding.Current Financial Data Encl | |
ML19347D276 | 18 November 1980 | Addl Prepared Testimony of Dt Gardner Re General Rate Increase Proceeding | |
ML19347D279 | 20 November 1980 | Prepared Testimony of MG Lyons Re General Rate Increase Proceeding.Estimated Operational & Financial Attrition Info Encl | |
ML19347D282 | 31 December 1980 | Prepared Testimony of R Korpan Re Cost of Capital & Rate of Return for 1982 Test Yr | |
ML19347D287 | 31 December 1980 | Prepared Testimony of Fh Ault Re 1982 Test Yr,Including Comparative Financial Data for 1978 & 79 & Summary of Earnings 1980-83 | |
ML19347D289 | 31 July 1980 | Prepared Testimony of PA Williams Re Cost of Capital & Rate of Return for 1981 Test Yr | |
ML19347D290 | 31 July 1980 | Prepared Testimony of Fh Ault Re 1981 Test Yr,Including Comparative Financial Data for 1978 & 1979 & Summary of Earnings 1975-81 | |
ML19347D293 | 8 September 1980 | Testimony of E Quan Re Study of Cost of Capital & Rate of Return for San Diego Gas & Electric Co | |
ML20004D098 | 18 May 1981 | Transcript of 810518 Public Meeting in San Clemente,Ca Re Facility Offsite Emergency Response Plan.Related Correspondence | Earthquake |
ML20005A545 | 22 June 1981 | Testimony of Jn Brune Re Earthquake Hazard in Southern CA & Mexico,Strong Ground Motion in Mexico,Earthquake Mechanism & Strong Motion Along San Jacinto Fault.Prof Qualifications & Supportive Documents Encl.Related Correspondence | Safe Shutdown Earthquake Design basis earthquake Earthquake |
ML20009A816 | 22 June 1981 | Transcript of Applicants Pl Ehlig,Eg Heath,Sw Smith,Lh Wight,Im Idriss,Ga Frazier & Rl Mcneill 810622 Direct Testimony on Contention 4 Re Ozd.Charts Encl | |
ML20010H842 | 21 September 1981 | Testimony of RM Rosenblum Re Staffing & Startup Effort & Tests at Unit 2 | |
ML20010H970 | 21 September 1981 | Testimony of Dr Buttemer Supporting Applicant Alternative Motion for Fuel Loading & Low Power License for Unit 2 | |
ML20010H972 | 21 September 1981 | Testimony of DF Pilmer Supporting Applicant Alternative Motion for Fuel Loading & Low Power License for Unit 2. Current State of Emergency Preparedness Adequate to Protect Public Health & Safety | |
ML20050E276 | 6 April 1982 | Proposed Corrections to 820312 Transcript of Oral Argument.Certificate of Svc Encl | |
ML20054J565 | 25 June 1982 | Transcript of 820625 OL Hearing in Bethesda,Md.Pp 1-84 | Siren Affidavit |
ML20062E294 | 28 July 1982 | Transcript of 820728 Public Meeting Re Discussion & Possible Vote on Full Power OL for Facility in Washington,Dc. Pp 1-110.Viewgraphs Encl | Boric Acid Probabilistic Risk Assessment Backfit |
ML20062G464 | 24 June 1982 | Transcript of 820624 Affirmation/Discussion Session & Public Meeting Re Unescorted Access to Protected Area & Low Power OL for San Onofre 2 in Washington,Dc.Pp 1-7.Supporting Documentation Encl | |
ML20078N727 | 16 October 1982 | Marked-up Transcript of Ee Kent 831016 Statement Re Inadequate Welding Practices | |
ML20127G623 | 19 June 1985 | Transcript of ACRS Subcommittee of SEP (San Onofre) 850619 Meeting in Washington,Dc.Pp 1-167.Supporting Documentation Encl | Safe Shutdown Ultimate heat sink Tornado Missile Hydrostatic Probabilistic Risk Assessment Coatings Tornado Missile Protection Earthquake Control of Heavy Loads Turbine Missile Backfit |
ML20199D366 | 18 March 1986 | Transcript of Commission 860318 Meeting in Washington,Dc Re Briefing by Util on 851121 Loss of All in-plant Ac Power. Pp 1-84.Supporting Documentation Encl | Hydrostatic Backfit |
ML20199D508 | 12 June 1986 | Transcript of 860612 Commission Briefing in Washington,Dc Re Restart of San Onofre Unit 1.Pp 1-95.Supporting Documentation Encl | Safe Shutdown Non-Destructive Examination Exemption Request Backfit |
ML20203F754 | 30 September 1997 | Transcript of 970930 Predecisional Enforcement Conference of Util in Arlington,Tx | Boric Acid Condition Adverse to Quality Pressure Boundary Leakage Pressure boundary leak |
ML20205D730 | 18 October 1988 | Transcript of 881018 Prehearing Conference in San Diego,Ca. Pp 1-62 | Fitness for Duty |
ML20207N517 | 12 January 1987 | Transcript of 870112 Telcon in Washington,Dc.Pp 1-18 | |
ML20237B186 | 11 December 1987 | Transcript of 871211 Telcon in Bethesda,Md.Pp 19-24 | |
ML20247L379 | 25 May 1989 | Transcript of 890525 Hearing in San Diego,Ca.Pp 150-278. Supporting Info Encl.Witnesses:A Keltz,A Talley,W Flynn, E Cone,N Hunemuller,J Zwolinski | |
NUREG-1190, Transcript of Commission 860122 Briefing in Washington,Dc Re San Onofre & Status of Rancho Seco.Pp 1-105.Supporting Documentation & NUREG-1190, Loss of Power & Water Hammer Event at San Onofre,Unit 1 on 851121 Encl | 22 January 1986 | Transcript of Commission 860122 Briefing in Washington,Dc Re San Onofre & Status of Rancho Seco.Pp 1-105.Supporting Documentation & NUREG-1190, Loss of Power & Water Hammer Event at San Onofre,Unit 1 on 851121 Encl |