Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20087N93230 March 1984Duquesne Light Company
Woolever E
Forwards Proposed Schedule of Written Responses to Outstanding Issues Presented in Table 1.2 of Draft Ser,Per NRC .Requests NRC Schedule for Issuing Remaining Draft SER Sections in Support of Meetings by 840430
ML20097A0537 September 1984Duquesne Light Company
Woolever E
Forwards Responses to Issues Provided in 840608 Draft Ser. FSAR Changes Described in Responses Will Be Incorporated Upon Acceptance.W/O EnclDraft Other
ML20134E2727 August 1985Duquesne Light Company
Carey J
Forwards Status Summaries of Open Issues,Confirmatory Issues & Commitment Issues for Final Draft Ser.Schedule for Issuance of SER RequestedDraft Other
ML20205S99510 August 1988Tam P
Office of Nuclear Reactor Regulation
Forwards SER Accepting Licensee 831104 & 840330 & 870504 Responses to Generic Ltr 83-28,Item 2.2.1 Re Equipment Classification for All Other safety-related ComponentsApproval
ML20206G03017 November 1988Tam P
Office of Nuclear Reactor Regulation
Forwards Safety Evaluation Supporting Util 870424 Response to Generic Ltr 83-28,Item 4.3 Re Shunt Trip DesignApproval
ML20206J18423 June 1986Duquesne Light Company
Carey J
Informs That Installation of Shunt Trip Attachment on Breakers in Reactor Trip Switchgear Completed,Per SER Confirmatory Item 26Other
ML20209J19024 April 1987Duquesne Light Company
Carey J
Advises That Installation of Shunt Trip Coil Trip Attachment Complete,Closing Out SER Confirmatory Item 26Other
ML20213F2357 May 1987Duquesne Light Company
Carey J
Forwards Response to 860627 Request for Addl Info Re Generic Ltr 83-28,Items 2.2.1,2.2.2,4.3,4.5.2 & 4.5.3.W/3 Oversize DrawingsRequest