Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20078H6225 October 1983Southern Nuclear
Nix H
Provides Schedule for Plant Outages & Activities Associated W/Recirculation Piping Insp Required by IE Bulletins 82-03 & 83-02,as Discussed at 830928 Meeting W/Nrc.Replacement of Piping Planned for Unit 2.Viewgraphs EnclMeeting
ML20080Q8195 October 1983Southern Nuclear
Nix H
Notifies That Plans Being Developed for Replacement/Insp of Main Recirculation Stainless Steel Piping During Outage Tentatively Scheduled to Begin Jan 1984.Summary of Plans Provided.Proposed Outline EnclOther
ML20081B14820 October 1983Southern Nuclear
Causey J
Application for Amend to License NPF-5,consisting of Tech Spec Change Request Revising Applicability of Limiting Condition for Operation of Sys & Instrumentation Associated W/Cooling & Protection of FuelRequest
ML20081B15720 October 1983Southern NuclearProposed Tech Spec Re Cooling & Protection of Fuel in Reactor Vessel After Removal of All FuelOther
ML20081K5447 November 1983Southern Nuclear
Gucwa L
Forwards Recirculation Piping Replacement Rept, Describing Reactor Coolant Recirculation Sys Piping to Be Replaced During Jan 1984 Outage.Application for License Amend Submitted 831020.Replacement Involves NSHCRequest
ML20081K5497 November 1983Southern NuclearRecirculation Piping Replacement ReptOther
ML20082D27216 November 1983Southern Nuclear
Gucwa L
Withdraws 831020 Application to Amend Tech Specs,Changing Applicability of Limiting Conditions for Operation of Sys & Instrumentation Associated W/Cooling & Protection of Fuel in Reactor VesselRequest
ML20082E59423 November 1983Southern Nuclear
Head G
Revised Application to Amend License NPF-5,replacing RCPB Piping.Submittal Clarifies 831121 Amend Proposal & Amplifies Basis for Determination of No Involvement of Significant HazardRequest
ML20082F36721 November 1983Southern Nuclear
Head G
Application for Amend to License NPF-5 to Allow RCPB Piping Replacement During Outage Commencing in Jan 1984.NSHC Determination & Safety Evaluation EnclRequest
ML20083C54420 December 1983Southern Nuclear
Gucwa L
Forwards Rev 1 to Recirculation Piping Replacement Rept to NRC, Consisting of Editorial & Listed Substantive Changes to 831107 Submittal.No Unreviewed Safety Question IdentifiedOther
ML20083C55120 December 1983Southern NuclearRev 1 to Recirculation Piping Replacement Rept to NrcOther
ML20083C63116 December 1983Southern Nuclear
Gucwa L
Withdraws Proposed Amend to License NPF-5 Per 831201 Meeting.Piping Replacement Will Be Performed Under Provisions of 10CFR50.59.Appropriate Reviews & Analyses Will Be Documented & Maintained for NRC AuditMeeting
ML20083H3776 January 1984Southern Nuclear
Gucwa L
Confirms 840105 Telcons W/Nrc Re Recent Developments Concerning Plans to Replace Recirculation Sys Piping. Scheduled Shutdown Delayed for Wk or Later Date in Jan,Due to Delay in Fabrication of PipingOther
ML20083H76227 December 1983Southern Nuclear
Gucwa L
Forwards Response to NRC Questions Re Radiological Aspects of Recirculation Pipe Replacement Project Raised During 831206 Telcon.Job Description Draft EnclDraft Other
ML20129E49128 June 1985Southern Nuclear
Gucwa L
Forwards Project Completion Addendum to 831107 Rept Re Replacement of Main Recirculation & Attached Sys Piping During 1984 Maint/Refueling OutageOther