Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
L-20-080, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic20 November 2020Sterdis A
Holtec Decommissioning International
Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 PandemicRequest
L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,10 December 2020Sterdis A
Holtec Decommissioning International
Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,Other
L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 201010 December 2020Sterdis A
Holtec Decommissioning International
Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010Supplement
ML20086M3851 April 2020April Pulvirenti
Plant Licensing Branch IV
Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4 8.1, A.C. Sources OperatingRAI
ML20253A34217 September 2020Bhalchandra Vaidya
Plant Licensing Branch III
Correction to Request for Additional Information Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (EPID-2020-LLA-0017)RAI
ML20307A4332 November 2020License Amendment Request - Proposed Changes to Emergency PlanRequest
ML20321A12114 December 2020Division of Operating Reactor Licensing
Philip Mckenna
Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(I)(1) (EPID L-2020-LLE-0189 (COVID-19))Approval
ML20345A24311 December 2020Amy Snyder
NRC/NMSS/DDUWP/URLB
Acceptance of Requested Licensing Action Amendment RequestAcceptance Review
ML21013A52315 January 2021Amy Snyder
NRC/NMSS/DDUWP/URLB
Request for Additional Information Regarding the Request to Change the Physical Security Plan - Alternative MeasuresRAI
ML21035A23118 February 2021Amy Snyder
Office of Nuclear Reactor Regulation
Physical Security Plan - RAI Clarification MeetingRAI
ML21049A25718 February 2021Haskell R
Plant Licensing Branch III
Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237)RAI
ML21063A10425 February 2021Sterdis A
Holtec Decommissioning International
Submittal of Response to NRC Request for Information on Physical Security Plan Revision and License Amendment Request to Incorporate Alternate MeasuresResponse to RAI
ML21074A42517 March 2021Amy Snyder
Reactor Decommissioning Branch
Review Schedule Licensing Action Re Physical Security Amendment Request - Alternative MeasuresOther
ML21075A31517 March 2021Amy Snyder
Reactor Decommissioning Branch
March 11,2021 Pilgrim Request for Additional Information Response Clarifiction Meeting - Proposed Physical Security PlanRAI
ML21103A05512 May 2021Amy Snyder
Reactor Decommissioning Branch
May 2021 Pilgrim Nuclear Power Station Issuance of Amendment 254 to Revise the Physical Security Plan Alternative Measures, Cover Letter and AmendmentApproval
NL-20-079, (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic12 November 2020Entergy
Gaston R
(IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 PandemicRequest
RS-20-114, License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition24 September 2020Exelon
Simpson P
License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled ConditionRequest
RS-20-130, License Amendment Request - Proposed Changes to Byron Emergency Plan for Post-Shutdown and Permanently Defueled Condition2 November 2020Exelon
Simpson P
License Amendment Request - Proposed Changes to Byron Emergency Plan for Post-Shutdown and Permanently Defueled ConditionRequest