Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML083530966 | 18 December 2008 | PINGP Lr - NSPM Response to NRC RAI Letter Dated 11/19/08 |
ML091900037 | 24 June 2009 | PINGP Lr - PINGP Letter Responding to Refueling Cavity Leakage RAIs and Revising Vessel Internals Program Commitment |
ML093170484 | 31 October 2009 | NUREG-1437, Supp 39, Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Re Prairie Island Nuclear Generating Plant Units 1 & 2 |
ML101890903 | 8 July 2010 | Xcel Energy Presentation Slides, Prairie Island Nuclear Generating Plant - Turbine Building Flooding - Regulatory Conference - July 13, 2010 |
ML102100259 | 30 June 2010 | Seismic Fragilities for Unit #1 and Unit #2 Turbine Building Piping and Equipment |
ML102110531 | 3 February 2010 | Applicant-Skoyen-Exhibit 4 RCE Report, RC-01160372-01, Refueling Cavity Leakage, Event Date: 1988-2008 |
ML102250511 | 13 July 2010 | Northard Exhibit 45, NSP Presentation - Prairie Island Turbine Building Flooding Regulatory Conference |
ML102460555 | 3 September 2010 | NSP000012-Revised Testimony of Steven Skoyen-EC 15651 |
ML102460562 | 3 September 2010 | Applicant Revised Exhibit NSP000004-Root Cause Evaluation Report 01160372-01 |
ML102460760 | 13 July 2010 | NSP000063-PINGP Presentation Slides at 2010 Turbine Building Flooding Regulatory Conference |
ML11133A029 | 31 May 2011 | NUREG-1437, Supplement 39, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Prairie Island Nuclear Generating Plant Units 1 & 2, Final Report |
ML112521289 | 22 January 2013 | Issuance of Amendments Adoption of Alternative Source Term Methodology |
ML12340A540 | 6 December 2012 | Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 |
ML13205A120 | 7 November 2013 | Draft Environmental Assessment for the Proposed Renewal of the Prairie Island Independent Spent Fuel Storage Installation |
ML14030A540 | 27 February 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
ML14041A204 | 26 February 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Prairie Island Nuclear Generating Plant, Units 1 and 2, TAC Nos.: MF0834 and MF0835 |
ML14120A162 | 9 May 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident |
ML14120A208 | 9 May 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident |
ML17110A275 | 4 May 2017 | Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 |
ML17297A323 | 14 November 2014 | Enclosure 2 (Redacted): Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal for Prairie Island Unit 1 |
ML19232A151 | 7 November 2019 | Issuance of Amendments Modifying the Design Basis for Quality Classification of Certain Fuel Handling Equipment |
ML19321B029 | 8 July 1980 | Forwards Response to IE Bulletin 80-11, Masonry Wall Design. Concrete Block Walls Are Not in Same Design Philosophy as Design of Trojan Plant Masonry Walls.Walls Were Generally Designed as Partition Walls or Shield Walls |
ML19343C482 | 19 March 1981 | Advises Re Implementation of Fire Protection Mods Not Previously Accepted by Nrc.Evaluation of Emergency Lighting Sys Will Be Completed by 811117.Oil Collection Sys Mods for Reactor Coolant Pump Are Scheduled After 810816 |
ML19344A905 | 21 July 1978 | Submits Response to 780517 Ltr Re Control of Heavy Loads Near Spent Fuel.Diagram Encl |
ML20009C612 | 14 July 1981 | Seismic Qualification of Auxiliary Feedwater Sys (NRC Generic Ltr 81-14). |
ML20038D084 | 30 November 1981 | Nine-Month Response to Generic Ltr 81-07,Control of Heavy Loads. |
ML20049H407 | 10 February 1982 | Public Version of Revision 1 to Emergency Plan Implementing Procedures F3-2, Classification of Emergencies. Revised Table of Contents Encl |
ML20058J888 | 15 October 1990 | Design Rept for Facility Station Blackout/Electrical Safeguards Upgrade Project |
ML20058M841 | 18 August 1993 | Plant,Sbo/Esu Project, Design Rept, Rev 2 |
ML20062M565 | 31 July 1981 | Masonry Wall Design,One Hundred & Eighty Day Response to IE Bulletin 80-11 |
ML20065U150 | 21 September 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures F3-1 Re Onsite Emergency organization,F3-2 Re Classification of Emergencies & F3-9 Re Emergency Evacuation.Revision 15 to Index Encl |
ML20073Q903 | 22 March 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure F3-2 Re Classification of emergencies,F3-5 Re Emergency Notification & F3-9 Re Emergency Evacuation |
ML20076K986 | 20 May 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures A.2-001 Re Emergency organization,A.2-107 Re Activation of Operations Support Ctr & A.2-402 Re Contamination Control |
ML20077J973 | 16 August 1983 | Masonry Wall Design,Prairie Island Nuclear Generating Plant,Units 1 & 2, Revised Technical Evaluation Rept |
ML20081B657 | 28 October 1983 | Public Version of Revised Emergency Response Plan Implementing Procedures,Including Procedure F3-2 Re Classification of emergencies,F3-5 Re Emergency Notification & F3-10 Re Personnel Accountability & Memo |
ML20094P045 | 15 November 1995 | Rev 0 of Vol I of VI of NSP PINGP Units 1 & 2 USNRC USI A-46 Resolution Ssel & Relay Evaluation Rept |
ML20118D318 | 27 April 2020 | Enclosure 4 - Technical Specifications (TS) Bases Control Program |
ML20134E934 | 29 January 1997 | Application for Amend to Licenses DPR-42 & DPR-60,revising TS Re Cooling Water Sys Emergency Intake Design Bases. Subj Amends Base on Response to Notice of Violations Noted Noted in Insp Repts 50-282/96-15 & 50-306/96-15 |
ML20134E942 | 29 January 1997 | Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake |
ML20135F744 | 7 March 1997 | Suppl 3 to Application for Amends to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases |
ML20136F392 | 28 February 1997 | Response to NRC Addl Info Request |
ML20136H004 | 11 March 1997 | Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info to Support Amend Re CWS Emergency Intake Design Bases |
ML20136H010 | 29 January 1997 | Rev 12 to Abnormal Procedure AB-3, Earthquakes |
ML20137D904 | 20 March 1997 | Application for Amends to Licenses DPR-42 & DPR-60,providing Supplemental Info to Amend Re Cooling Water Sys Emergency Intake Design Bases |
ML20141H188 | 10 July 1997 | Forwards Responses to NRC 970411 RAI in Support of License Amend Request Re Amend of Cooling Water Sys Emergency Intake Design Bases |
ML20148Q949 | 30 June 1997 | Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl 9 to LAR Re Amend of CWS Emergency Intake Design Bases |
ML20198B147 | 29 December 1997 | Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR |
ML20203C181 | 18 February 1998 | Submits Ltr to Document Results of Discussions Between NSP & NRC Staff Re Analysis Required to Resolve Intake Canal Seismic Stability Issue.New NRC Commitments Made within Ltr |
ML20207L115 | 21 September 1988 | Criteria for Determining Justification for Continued Operation When Encountering Major Discrepancies in As-Built Safety-Related Piping |
ML20209D418 | 7 July 1999 | Informs That Util Has Changed Listed TS Bases Pages Attached for NRC Use.Util Made No New Commitments in Ltr |