Issue date | Title | |
---|---|---|
IR 05000338/2020003 | 5 November 2020 | Integrated Inspection Report 05000338/2020003 and 05000339/2020003 and Exercise of Enforcement Discretion |
IR 05000338/2020004 | 28 January 2021 | Integrated Inspection Report 05000338/2020004 and 05000339/2020004; 07200016/2020002 |
IR 05000338/2021010 | 18 November 2021 | Design Basis Assurance Inspection (Programs) Inspection Report 05000338/2021010 and 05000339/2021010 |
IR 05000338/2023002 | 9 August 2023 | Integrated Inspection Report 05000338/2023002 and 05000339/2023002 |
IR 05000339/1989200 | 7 June 1989 | Insp Rept 50-339/89-200 on 890213-17 & 0227-0303.Potential Enforcement Items Noted.Major Areas Inspected:Evaluation of Planned Design Changes & Mods Against Regulatory Requirements & Licensee Commitments |
ML020330139 | 31 January 2002 | Proposed Improved Technical Specifications, Request for Additional Information (RAI) Section 3.8 |
ML020580696 | 22 February 2002 | Proposed Improved Technical Specifications (Its), Response to Requests for Additional Information Re ITS Surveillance Requirement 3.3.1.6 - Bsi, ITS 3.3.5 and 3.8.2 |
ML020700231 | 22 February 2002 | Part 1 of 10, North Anna Power Station, Units 1 & 2 Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions |
ML020800771 | 13 March 2002 | Summary of Facility Changes, Tests & Experiments Implemented During 2001 |
ML021220214 | 5 April 2002 | Part 5 of 6 - Tech Spec Pages for Amendments 231 and 212 for North Anna, Units 1 & 2. Pages B 3.6.1-1 Through B 3.8.1-37 |
ML021220221 | 5 April 2002 | Part 6 of 6 - Tech Spec Pages for Amendments 231 and 212 for North Anna, Units 1 & 2. Pages B 3.8.2-1 Through B 3.9.7-2 |
ML022050114 | 14 January 2002 | June 2002 Exam 50-338/2002-301, 50-339/2002-301 Final Ro/Sro Written Exam with Answers & K/As |
ML022900703 | 14 January 2002 | Exam 50-338/2002-301, 50-339/2002-301 Draft Jpms, Admin JPMs & Outlines |
ML030700112 | 4 March 2003 | Summary of Facility Changes, Tests & Experiments |
ML042930051 | 12 October 2004 | Technical Specifications Bases for North Anna Units 1 & 2 |
ML052800403 | 7 October 2005 | Request for Additional Information for Proposed Technical Specifications Change Request to Increase ECCS-LHSI, AFW, Quench Spray and Chemical Addition Systems Completion Times |
ML052910388 | 12 October 2005 | Technical Specification Bases Changes |
ML052990145 | 20 March 2003 | Current Facility Operating License NPF-4, Tech Specs, Revised 11/12/2019 |
ML060950094 | 3 April 2006 | North Anna Units 1 and 2, and Surry Units 1 and 2, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power |
ML061170008 | 26 April 2006 | IR 05000338-06-002, IR 05000339-06-002, IR 07200016-06-001; 01/01/2006 - 03/31/2006; North Anna Units 1 & 2, & North Anna Independent Spent Fuel Storage Installation. Routine Integrated Resident and Regional Inspector Report. Event Follow-u |
ML062770018 | 25 September 2006 | Technical Specification Bases Pages |
ML073520247 | 17 December 2007 | Proposed License Amendment Request, One-time Risk-Informed Extension to the Completion Time for EDG Fuel Oil Storage Tank Recoating |
ML082190013 | 7 August 2008 | Monthly Operating Reports Second Quarter 2008 |
ML090710082 | 10 February 2009 | Initial Written Retake Examination, 2009-301 Draft SRO Written Exam |
ML090900055 | 26 March 2009 | License Amendment Request, Measurement Uncertainty Recapture Power Uprate |
ML091600347 | 17 June 2009 | Request for Additional Information (RAI) of Requested Licensing Action Measurement Uncertainty Recapture (Mur) Power Uprate |
ML091910204 | 8 July 2009 | Response to Request for Additional Information on Measurement Uncertainty Recapture Power Uprate |
ML092050381 | 23 July 2009 | License Amendment Request, One Time Extension of the Completion Time for 1 J - 480 Volt AC Distribution Subsystem |
ML092250616 | 22 October 2009 | Units, 1 and 2, Issuance of Amendments 257 & 238 Regarding Measurement Uncertainty Recapture Power Uprate |
ML092820147 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 1, Introduction and General Description of Plant |
ML092820157 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 8, Electric Power System |
ML092940593 | 9 October 2009 | Technical Specifications Bases, Revision 41 |
ML100970060 | 30 March 2010 | Summary of Facility Changes, Tests and Experiments for 2009 |
ML102100551 | 29 July 2010 | IR 05000338-10-003, 05000339-10-003, 07200056-10-001, on 04/01/2010 - 06/30/2010, North Anna Power Station, Units 1 & 2 and the North Anna Independent Spent Fuel Storage Installation: Maintenance Effectiveness, Identification and Resolution |
ML102940288 | 9 October 2010 | Technical Specifications Bases Changes |
ML103050198 | 16 July 2010 | Initial Exam 2010-301 Draft Sim/IN-Plant JPMs |
ML11252A006 | 8 September 2011 | Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan |
ML11262A151 | 17 September 2011 | Independent Spent Fuel Storage Installation - Summary Report of August 23, 2011 Earthquake Response and Restart Readiness Determination Plan |
ML11277A267 | 3 October 2011 | Response to Request for Additional Information Regarding August 23, 2011 Earthquake - Restart Readiness Determination Plan |
ML11286A018 | 10 October 2011 | Response to Request for Additional Information Restart Readiness Determination Plan |
ML11286A019 | 10 October 2011 | Response to Request for Additional Information Restart Readiness Determination Plan |
ML11297A122 | 20 October 2011 | Response to Request for Additional Information, Status of Near-Term Action Items Restart Readiness Determination Plan |
ML11298A216 | 8 October 2011 | Technical Specifications Bases |
ML113040031 | 31 October 2011 | IR 05000338-11-011 and 05000339-11-011; IR 07200016-11-001 and 07200056-11-002, 08/30/2011 Through 10/03/2011, North Anna Power Station, Units 1 and 2; Augmented Inspection Team |
ML11308B406 | 11 November 2011 | Technical Evaluation, Review of Restart Readiness Determination Plan |
ML12005A015 | 24 August 2011 | E-mail from M. Franovich, Comm to W. Ostendorff, Comm; Resend: Summary of Commissioner Assistants Briefing on East Coast Earthquake |
ML12005A018 | 24 August 2011 | E-mail from M. Franovich, Comm to W. Ostendorff, Comm; Subject: Update: Summary of Commissioner Assistants Briefing on East Coast Earthquake |
ML12005A029 | 31 August 2011 | E-mail from G. Bowman to T. Hipschman, Comm; North Anna Earthquake AIT Charter |
ML12005A030 | 30 August 2011 | Letter from V. Mccree, Region II to M. Franke, Region II; Augmented Inspection Charter to Evaluate Total Loss of Offsite Power, Dual Unit Reactor Trips and Plant Equipment Issues Following a Seismic Event at North Anna |
ML12005A059 | 13 September 2011 | E-mail from Y. Li, NRR to M. Franke, Region II; Seismic Equipment Maintenance and Calibration Issue |