Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000338/20200035 November 2020Integrated Inspection Report 05000338/2020003 and 05000339/2020003 and Exercise of Enforcement Discretion
IR 05000338/202000428 January 2021Integrated Inspection Report 05000338/2020004 and 05000339/2020004; 07200016/2020002
IR 05000338/202101018 November 2021Design Basis Assurance Inspection (Programs) Inspection Report 05000338/2021010 and 05000339/2021010
IR 05000338/20230029 August 2023Integrated Inspection Report 05000338/2023002 and 05000339/2023002
IR 05000339/19892007 June 1989Insp Rept 50-339/89-200 on 890213-17 & 0227-0303.Potential Enforcement Items Noted.Major Areas Inspected:Evaluation of Planned Design Changes & Mods Against Regulatory Requirements & Licensee Commitments
ML02033013931 January 2002Proposed Improved Technical Specifications, Request for Additional Information (RAI) Section 3.8
ML02058069622 February 2002Proposed Improved Technical Specifications (Its), Response to Requests for Additional Information Re ITS Surveillance Requirement 3.3.1.6 - Bsi, ITS 3.3.5 and 3.8.2
ML02070023122 February 2002Part 1 of 10, North Anna Power Station, Units 1 & 2 Proposed Improved Technical Specifications Comments on Draft Safety Evaluation, Certified Improved Technical Specifications (ITS) & Bases & Proposed License Conditions
ML02080077113 March 2002Summary of Facility Changes, Tests & Experiments Implemented During 2001
ML0212202145 April 2002Part 5 of 6 - Tech Spec Pages for Amendments 231 and 212 for North Anna, Units 1 & 2. Pages B 3.6.1-1 Through B 3.8.1-37
ML0212202215 April 2002Part 6 of 6 - Tech Spec Pages for Amendments 231 and 212 for North Anna, Units 1 & 2. Pages B 3.8.2-1 Through B 3.9.7-2
ML02205011414 January 2002June 2002 Exam 50-338/2002-301, 50-339/2002-301 Final Ro/Sro Written Exam with Answers & K/As
ML02290070314 January 2002Exam 50-338/2002-301, 50-339/2002-301 Draft Jpms, Admin JPMs & Outlines
ML0307001124 March 2003Summary of Facility Changes, Tests & Experiments
ML04293005112 October 2004Technical Specifications Bases for North Anna Units 1 & 2
ML0528004037 October 2005Request for Additional Information for Proposed Technical Specifications Change Request to Increase ECCS-LHSI, AFW, Quench Spray and Chemical Addition Systems Completion Times
ML05291038812 October 2005Technical Specification Bases Changes
ML05299014520 March 2003Current Facility Operating License NPF-4, Tech Specs, Revised 11/12/2019
ML0609500943 April 2006North Anna Units 1 and 2, and Surry Units 1 and 2, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power
ML06117000826 April 2006IR 05000338-06-002, IR 05000339-06-002, IR 07200016-06-001; 01/01/2006 - 03/31/2006; North Anna Units 1 & 2, & North Anna Independent Spent Fuel Storage Installation. Routine Integrated Resident and Regional Inspector Report. Event Follow-u
ML06277001825 September 2006Technical Specification Bases Pages
ML07352024717 December 2007Proposed License Amendment Request, One-time Risk-Informed Extension to the Completion Time for EDG Fuel Oil Storage Tank Recoating
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008
ML09071008210 February 2009Initial Written Retake Examination, 2009-301 Draft SRO Written Exam
ML09090005526 March 2009License Amendment Request, Measurement Uncertainty Recapture Power Uprate
ML09160034717 June 2009Request for Additional Information (RAI) of Requested Licensing Action Measurement Uncertainty Recapture (Mur) Power Uprate
ML0919102048 July 2009Response to Request for Additional Information on Measurement Uncertainty Recapture Power Uprate
ML09205038123 July 2009License Amendment Request, One Time Extension of the Completion Time for 1 J - 480 Volt AC Distribution Subsystem
ML09225061622 October 2009Units, 1 and 2, Issuance of Amendments 257 & 238 Regarding Measurement Uncertainty Recapture Power Uprate
ML09282014730 September 2009Updated Final Safety Analysis Report, Revision 45, Chapter 1, Introduction and General Description of Plant
ML09282015730 September 2009Updated Final Safety Analysis Report, Revision 45, Chapter 8, Electric Power System
ML0929405939 October 2009Technical Specifications Bases, Revision 41
ML10097006030 March 2010Summary of Facility Changes, Tests and Experiments for 2009
ML10210055129 July 2010IR 05000338-10-003, 05000339-10-003, 07200056-10-001, on 04/01/2010 - 06/30/2010, North Anna Power Station, Units 1 & 2 and the North Anna Independent Spent Fuel Storage Installation: Maintenance Effectiveness, Identification and Resolution
ML1029402889 October 2010Technical Specifications Bases Changes
ML10305019816 July 2010Initial Exam 2010-301 Draft Sim/IN-Plant JPMs
ML11252A0068 September 2011Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan
ML11262A15117 September 2011Independent Spent Fuel Storage Installation - Summary Report of August 23, 2011 Earthquake Response and Restart Readiness Determination Plan
ML11277A2673 October 2011Response to Request for Additional Information Regarding August 23, 2011 Earthquake - Restart Readiness Determination Plan
ML11286A01810 October 2011Response to Request for Additional Information Restart Readiness Determination Plan
ML11286A01910 October 2011Response to Request for Additional Information Restart Readiness Determination Plan
ML11297A12220 October 2011Response to Request for Additional Information, Status of Near-Term Action Items Restart Readiness Determination Plan
ML11298A2168 October 2011Technical Specifications Bases
ML11304003131 October 2011IR 05000338-11-011 and 05000339-11-011; IR 07200016-11-001 and 07200056-11-002, 08/30/2011 Through 10/03/2011, North Anna Power Station, Units 1 and 2; Augmented Inspection Team
ML11308B40611 November 2011Technical Evaluation, Review of Restart Readiness Determination Plan
ML12005A01524 August 2011E-mail from M. Franovich, Comm to W. Ostendorff, Comm; Resend: Summary of Commissioner Assistants Briefing on East Coast Earthquake
ML12005A01824 August 2011E-mail from M. Franovich, Comm to W. Ostendorff, Comm; Subject: Update: Summary of Commissioner Assistants Briefing on East Coast Earthquake
ML12005A02931 August 2011E-mail from G. Bowman to T. Hipschman, Comm; North Anna Earthquake AIT Charter
ML12005A03030 August 2011Letter from V. Mccree, Region II to M. Franke, Region II; Augmented Inspection Charter to Evaluate Total Loss of Offsite Power, Dual Unit Reactor Trips and Plant Equipment Issues Following a Seismic Event at North Anna
ML12005A05913 September 2011E-mail from Y. Li, NRR to M. Franke, Region II; Seismic Equipment Maintenance and Calibration Issue